freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

mfgr——tpm-在線瀏覽

2025-04-14 16:57本頁面
  

【正文】 ven death. 以防你或它人意外開動電源而造成可能的傷害甚至死亡 Lockout/Tagout Review: 鎖定 /標(biāo)識檢查 13 Lockout Device 鎖定設(shè)備 A lock or other device that utilizes a positive means, to hold an energy isolating device in a safe position and thereby preventing the energizing of a machine or piece of equipment. 一把鎖或其它設(shè)備,用于使電源設(shè)備隔離裝置處于一安全的狀態(tài),以防止機(jī)器或設(shè)備的一部分帶電。 ? The tag will also include the name of the person who locked out the equipment. ?該標(biāo)簽應(yīng)有鎖定該裝置的 人的名字。 ?THE ASSOCIATE RESPONSIBLE FOR APPLYING THE LOCK OR TAG IS THE ONLY PERSON AUTHORIZED TO REMOVE THE LOCK OR TAG. ?唯 有經(jīng)授權(quán)負(fù)責(zé)運(yùn)用鎖或標(biāo)簽的人員可以拿掉該鎖或標(biāo)簽?;蛉魏螌δ愕牟块T重要的機(jī)器。對瓶頸設(shè)備給予特殊的關(guān)注。 ? Average: Equipment which has lost some of it’s original functions or accuracy. It’s output normally meets the required specifications. ? 一般 :設(shè)備喪失了一些最初的功能或精確度。 ? Poor: Equipment which is no longer accurate or reliable. In order to produce acceptable output, this equipment requires operator intervention well beyond the original level. ? 差: 設(shè)備不再精確或可靠。 ACTION ITEM 1: Assess All Equipment (cont.) 行動內(nèi)容 1:評估所有設(shè)備(待續(xù)) 20 ACTION ITEM 2: Write MachineSpecific Lockout Procedures Lockout procedures must be written and implemented for each machine ? General procedures are in effect for Sullair ? Procedures need to be written jointly with facilities maintenance 21 行動內(nèi)容 2: 將 特殊鎖定程序?qū)懺跈C(jī)器上 鎖 定程序必須寫在每臺 機(jī)器上并予以執(zhí)行 ? 一 般程序適用于壽力公司 ? 程序 必須與設(shè)備維護(hù) 共同寫下來 22 ACTION ITEM 3/4: Operator Walkaround and PM Schedule on 100% A/B ? Operator PM defined for 100% of Category A and B machines – A book or sheet exists which defines the daily/weekly/monthly Operator PM tasks – Include safety equipment operation (guards, limit switches, etc.) in Operator PM. ? Operator PM conducted faithfully (1 month prior to audit) on all Equipment for which it is defined. Rev: B Revision Date: 3/ 25/98 Operator Preventive Maintenance Service Card Machine: Okuma LC30, 4 Axis, BT 3054 Daily PM Tasks 1. Check running sight. 2. Check and fill Waylube: Vactra 2. 3. Check tramp oil and scrounger. Empty tramp oil if required. 4. Check and fill coolant: PML 9333. Weekly PM Tasks: Do Daily tasks and the following: 1. Check and fill spindle lube: DTE 24. 2. Check and fill air lubricator: DTE 24. (Shut off and drain air to fill) 3. Check motor fan filter (Change if necessary): Cat. 030058. 4. Check and fill hydraulic tank: DTE 24. 5. Check roll filter (Change if needed): Cat. 027793. Monthly PM Tasks: Do all tasks on this sheet. 1. Grease chuck fittings, 1 shot. 2. Grease 1 fitting, 2 shots, both turrets. 3. Clean air filter. 4. Change air filter: Cat. 021183. 23 行動內(nèi)容 3/4: 操作員巡查和 所有 A/B類設(shè)備的 PM進(jìn)度表 ? 操作員 PM定義為所有 A、 B類機(jī)器 – 應(yīng)有寫明了操作員每日 /周 /月的 PM任務(wù)的書或表 – 包括安全設(shè)備(防護(hù)裝置、限定電閘等) ? 操作員嚴(yán)格地按要求對所有設(shè)備進(jìn)行生產(chǎn)性維護(hù)( 在審查前一個月 ) Rev: B Revision Date: 3/ 25/98 Operator Preventive Maintenance Service Card Machine: Okuma LC30, 4 Axis, BT 3054 Daily PM Tasks 1. Check running sight. 2. Check and fill Waylube: Vactra 2. 3. Check tramp oil and scrounger. Empty tramp oil if required. 4. Check and fill coolant: PML 9333. Weekly PM Tasks: Do Daily tasks and the following: 1. Check and fill spindle lube: DTE 24. 2. Check and fill air
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1