freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

bpr實施框架-資料下載頁

2025-05-10 08:56本頁面

【導(dǎo)讀】階段一:構(gòu)思設(shè)想S1-為企業(yè)流程重組的項目立項做準(zhǔn)備,獲得高層領(lǐng)導(dǎo)的支持,確定需要改善的企業(yè)關(guān)鍵流程。劃和預(yù)算;確定流程重組的績效目標(biāo)。在的問題及其根源,確定非增值的活動。階段四:流程設(shè)計S4-完成新流程的設(shè)計。需要培訓(xùn)員工、建立信息技術(shù)平臺和信息。是否滿足預(yù)定目標(biāo)。通常和公司的全面質(zhì)量管理活動聯(lián)系

  

【正文】 it aims to achieve. It consists of six elements based on the CATWOE analysis. The CATWOE analysis for the root definition Mnemonic description C Clients or customers who benefit from or affected by the outputs from the system A Actors who carry out the activities within the system T Transformation taken place which convert the input to output within or by the system W Worldview perceived of the system, or the assumptions made about the system O Owner of the system who could determine the system to cease to exist E Environment is the world that surrounds and influences the system, but has control over the system ? S4- conceptual models: the conceptual model is constructed for the system based on the root definition. this conceptual model depicts the work of interconnected activities needed for the ideal situation as specified in the root definition. ? S5- real world/systems world parison: the expressed real situation is explored and pared with the ideal conceptual model built at stage 4. Needed changes are then identified based on the differences between the real world and the ideal world. Such changes are called systemically desirable changes. ? S6- feasible/desirable changes: there is a need to determine whether the changes are feasible to be implemented. It is based on a culturebased stream of analysis in three aspects: intervention, social, and political. The final changes to be implemented are considered to be desirable and feasible ? S7- Action to improve: the action is taken to implement the changes.
點擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1