【正文】
[4] [J].中國建設信息,2011,(第3期).[5] [J].企業(yè)導報,2011,(第6期).[6] C. J. Anumba,A. K. Dukeb. Telepresence in concurrent lifecycle design and construction. Artificial Intelligence in Engineering,[7] [M].人民交通出版社,2007[8] 魏道升,[M],人民交通出版社,2011[9] 賓雪峰,[M].人民交通出版社,2012[10] 王長青. 業(yè)主對工程造價控制研究[D].鎮(zhèn)江:江蘇大學,[11] Smith, Peter Vincent. The International Cost Engineering Council and the Globalfor Cost Engineers[J]. Cost Engineering,[12] Victoria :Gary Controls from the Front End[J].Cost Engineering,[13] 金書明,[J].中國建材資訊,2006,(第1期).[14] [J].民營科技,2011,(第12期).[15] [J].山西建筑,2007,(第19期).[16] Wichan Pewdum, Thammasak Rujirayanyong. Forecasting final budget and duration of highway construction projects. Engineering Construction and Architectural Management,2009