freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

[建筑]高速鐵路論文:京滬高速鐵路沉降監(jiān)測數(shù)據(jù)處理與分析(編輯修改稿)

2025-02-12 07:22 本頁面
 

【文章內(nèi)容簡介】 posed method effectively solves the problem of broken height and its precision is far more than return zero method which is currently used. The methods of gross error position and broken height process in this paper effectively improve the quality of settlement monitoring data and has practical value in settlement respect of data analysis, the prehensive effect both ground settlement and engineering settlement, which were lack of researches, is primary studied in this paper. In respect of analysis of engineering settlement, the relationship of engineering settlement value of bridge and the buried depth of working benchmark point is analyzed, and get the conclusion that current settlement observation of bridge in ground settlement area is not perfect. Then, the “rectangular method” is used to monitor height difference change according to parts of bridges appear “rise” situation, which lays the foundation to solve this “rise” problem. In respect of analysis of prehensive effect, according to the si
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)教案相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1