【正文】
o the disposable shoe covers requirements of level one, dress is required.除了第一級要求的穿鞋外,還要求穿工作服。During level 2 protocol, the clean area must be vacuumed every day.在進入第二級要求時,每天必須用吸塵器清潔。Level Three第三級Level three begins when the walls of the production workshop are plete. Fans in the air handling units will be running to maintain room pressurization. 當生產(chǎn)區(qū)的墻面完工時,進入第三級要求??照{機組開始運作,以保證車間內正壓。Workers entering the clean area will wear disposable shoe covers and smocks.工作人員進入潔凈區(qū)要穿潔凈服和鞋套。All material, tools and equipment entering the clean area will be wiped down with disposable cleanroom wipes using a mixture of water and IPA.所有進入潔凈區(qū)的材料和設備,要經(jīng)過水和易渾法的清潔劑的混合溶劑清潔。During level three protocol, the clean area will be vacuumed daily using a portable clean room vacuum with hepa filtration.在進入第三級要求時,每天要用手提式帶高效過濾器的吸塵器對潔凈區(qū)清潔。Installation of ductwork風管安裝Because air flowing into the production area travels though the air supply ductwork, special care must be taken that it is installed clean.由于空氣可經(jīng)過風機管道進入生產(chǎn)區(qū),進入潔凈區(qū)的風管要特別加以注意清潔。Sections of ductwork and ponents such as dampers and diffusers should be cleaned and unpacked as they enter the building. Interior surfaces should be wiped with disposable cleanroom wipes using a mixture of water and IPA. All mechanical ponents should be free from grease or oil.部分管件如防火閥和風機盤管應打開包裝進行清潔,內部應用易渾法的清潔凈清潔。所有部件應無油污和無油脂。Final clean 最后清潔After all installation is plete in the clean area, it will undergo a final cleaning. This will be done using cleanroom wipes and a mixture of water and IPA. The ceiling will be cleaned first, then walls working from top to bottom, and finally the floor. 所以安裝工作結束后,要對整個潔凈區(qū)進行最后清潔。要使用易渾法的水溶性清潔劑清潔。首先清潔天花板,然后是從上到下清潔墻面,最后是地面。When this final clean is plete, the only access into the cleanroom will be through the gowning area on the east side of gridline B. The former entrances through raw material and finished goods storage areas will be secured.當最后清潔結束后,只有穿潔凈服的人員可從網(wǎng)格B的東面的入口進入。材料庫和成品庫的入口將被限制進入。Anyone entering the area after final clean must obtain permission from the Site Manager.最后清潔完成后,任何人進入潔凈區(qū)必須得到愛爾公司現(xiàn)場經(jīng)理同意。6 / 6