【正文】
n be considered as a Golden Sample.. 測試治具及程式開發(fā)製作階段Golden Sample使用及管理流程圖及說明:The flow chart and descriotion of Golden Sample usage and management in the stage of test fixture development and fabrication:BDPETEQAPD1. 測試程式及治具需求2. 準備及提供Golden Sample3. 以Golden Sample開發(fā)製作測試程式及治具4. 以Golden Sample驗證測試程式及治具5. 將測試程式、治具及Golden Sample交給PD1. 測試程式及治具需求:由BD視產(chǎn)品階段情況提出測試程式及治具需求。2. 準備及提供Golden Sample:PE必須準備Golden Sample並附上PE簽核的Board Assembly Manufacturing Golden Sample標籤 (AT0801E105F11) 給TE,以利後續(xù)Golden Sample的控管。3. 以Golden Sample開發(fā)製作測試程式及治具:TE依據(jù)PE所提供之Golden Sample開發(fā)測試程式及製作治具。4. 以Golden Sample驗證測試程式及治具:由TE會同QA以Golden Sample進行測試程式及治具的驗收。5. 將測試程式、治具及Golden Sample交給PD:TE將測試程式、治具及Golden Sample一併交給PD使用。BDPETEQAPD1. The request for test program and fixture2. Golden sample prepare3. To develop the program and fixture base on the Golden Samples4. To verify the program and the fixture by the Golden Samples5. To release the program, fixture and the Golden Samples to PD1. The request for test program and fixture:BD will request the golden samples for program and fixture base on the phase of the product2. Golden sample prepare:PE has to prepare the Golden Samples, as well as the label Board Assembly Manufacturing Golden Sample signed by PE (AT0801E105F11) to TE to control the Golden Samples.3. To develop the program and fixture base on the Golden Samples:TE will develop the testing program and the fixture base on the Golden Samples provided by PE.4. To verify the program and the fixture by the Golden Samples:TE and QA will verify the testing program and the fixture by the Golden Samples.5. To release the program, fixture and the Golden Samples to PD:TE will release the verified testing program, the verified fixture and the Golden Samples to PD for the routine production.4.4. 量產(chǎn)階段Golden Sample使用及管理流程圖及說明:The flow chart and descriotion of Golden Sample usage and management in the mass production stage.PDTE1. 測試程式及治具日常驗證2. 異常確認. 修復程式或治具的不良. 修復Golden Sample3. TE與PD確認修復結果1. 測試程式及治具日常驗證:PD在治具上線及各班作業(yè)員開始作業(yè)前,必須以Golden Sample驗證測試程式及治具的狀態(tài)。2. 異常確認:測試程式及治具以Golden Sample驗證有異常時,由TE進行確認。測試程式或治具的不良:若為測試程式或治具不良,由TE負責修復之。修復Golden Sample:若為Golden Sample不良,由TE負責修復該不良Golden Sample;若無法修復時TE會重新準備新的Golden Sample並附上TE簽核的Board Assembly Manufacturing Golden Sample標籤 (AT0801E105F11),此標籤須於24小時內(nèi)完成會簽作業(yè)。3. TE與PD確認修復結果: PD與TE以Golden Sample驗證測試程式及治具無異常時,即可開始正常作業(yè)。4. 為防止Golden sample 驗證後隨成品流至客戶端,需將Golden sample 的序號於SFIS 鎖碼。5 . PD 專人簽收後立即須上SFIS 網(wǎng)站進行鎖條碼於PACK 站。PDTE1. Daily verification for test program and the fixture2. Exception verification. Test program or fixture recovery. Golden sample recovery3. TE and PD confirm the recovery1. Daily verification for test program and the fixture: PD should check the condition of test program and fixture befor the tester is reonlined or is used at every shift.2. Exception verification: TE should verify the exception when the test program and fixture are certified by golden sample and have any kind of failure. program or fixture recovery:If test program or fixture is failed, TE should recover it.。 Sample recovery:TE should fixed the failed golden sample to be workable。 If the golden sample can not be fixed, TE should prepare new Golden Sample attached a Board Assembly Manufacturing Golden Sample Label (AT0801E105F12) signed by Golden sample Label approved must achievement with in 24 hours.3. TE and PD confirm the recovery: PD can start the production if the test program and the fixture are certified by the golden sample and no failure appears.4. To prevent Golden sample escape to customer site, need lock PCBA39。s serial number form SFIS.5. PD supervisor need Lock PCBA39。s serial number after Receiving and signing for Golden sample.. EC變更時Golden Sample使用及管理流程圖及說明:The flow chart and descriotion of Golden Sample usage and management when the product has an EC.PETE1. ECN2. 準備Golden Samples (包含PASS與FAIL)3. 修改測試程式或是治具4. 將測試程式、治具及Golden Samples交給PD1. ECN: PE發(fā)行ECN。2. 準備Golden Samples (包含PASS與FAIL): TE必須根據(jù)ECN準備Golden Sample並附上TE簽核的Board Assembly Manufacturing Golden Sample標籤 (AT0801E105F11)。3. 修改測試程式或是治具: TE根據(jù)Golden Sample修改測試程式或治具。4. 將測試程式、治具及Golden Samples交給PD: TE將修改後的測試程式、治具及Golden Sample一併交給PD使用。PETE1. ECN2. Golden Sample Preparation (PASS and FAIL)3. Test Program or Fixture Modification4. Release Test Program, Fixture and Golden Sample to PD1. ECN: PE issues and releases ECN。2. Golden Sample Preparation and Supply (PASS and FAIL): TE should prepare Golden Sample according to ECN and attach a Board Assembly Manufacturing Golden Sample Label (AT0801E105F12) signed by TE.3. Test Program or Fixture Modification: TE modify the test program or fixture with the Golden Sample.4. Release Test Program, Fixture and Golden Sample to PD: TE release new test program, fixture and Golden Sample to PD.. Golden Sample的使用期限與定期驗證或更新流程圖及說明:The flow chart and description of Golden Sample verification and replacement.. ICT: 每三個月由生產(chǎn)單位(PD)交由工程單位(TE)定期驗證更新.. ICT: The Golden Samples(Pass and Fail) should be checked and verified by TE every 3 months.. FCT: 依產(chǎn)品別不同,以下表定義Golden Sample使用期限與定期驗證, 生產(chǎn)單位(PD)依據(jù)下表定期交由工程單位(TE)定期驗證更新. . FCT: Due to the different types of products, the duation and verification is defined in the below table, the production Dep. regularly forwards the Golden Samples