【正文】
ontrol points and meters. requirement of energy consumption and energy quality.5. Technical specification: describing performance, material, standard, type and home of providing equipments (The appearances mark measure accuracy). All equipment should have product sample, and define its specification, the place and the size of pipe nozzle connected with water、electric、steam、cool and pressed air.6. The schedule of enforcing project: The seller should provide the schedule of enforcing project in day unit.7. When the contract es into force, the seller should provide proper document information on equipment: specifications, certification for leaving factory, maintenance manuals, spare parts manuals and electrical manuals within two months. All of the documents should be 3 copies in Chinese and English respectively.Ⅷ. Acceptable standards:1. Installation/missioning /acceptation of equipment:. The installation/missioning /acceptation of equipments should be acplished before Dec. 20, 2002,and begin to process aseptic test from ,2003. And the loss of milk is lower than regulated value in the contract. The sevenday holding test for product meet the requirement of mercial sterility. The equipments should run correctly during fullload testing run in continuous three days from ,2003.. If the first test is delayed caused by the buyer, the date of test should postpone. If the interval of testing run is cause by supply of energy, the loss is borne by the buyer, and organizing the second trial run. If the equipment trouble causes not to continuously run or not to accept the checked product, the caused loss is borne by the seller, and the seller undertakes all costs caused.. No more than 10 days between the two testing runs.. If the second testing run is still not accepted, there will be penalty according to the contract terms. 2. The performance of single equipment should attain all regulated parameters in the contract, and energy consumption id no more than regulated index. 3. The melting interface of pipeline is smooth and flat. The connection of all pipelines should meet the requirement of nonleak, clean, sanitary, no dead corner and easy cleaning. 4. The information on all equipments should be all plete and not leak. 5. The amount, standard, type and home of all equipments, apparatus and instruments should meet the regulated requirements in the contract. 6. The fullload testing run of the whole line and all parameters should meet the requirements in the contract.第 6 頁 共 6 頁