【正文】
ld be drained through the stainless steel tube. 7. Materials of installation: the pipelines contacting with concentrate acid amp。 unloading. And it should apply to the whole hoist and transport in long distance.7. Delivery place:add: the site of installation of baotou yili dairy co. ltdXitu Technical development district, baotou, Inner Mongolia ProvinceDate: The bidder should finish the supply, installation ,debuggingamp。編號(hào):時(shí)間:2021年x月x日書(shū)山有路勤為徑,學(xué)海無(wú)涯苦作舟頁(yè)碼:第6頁(yè) 共6頁(yè)Schedule of Requirements and Technical SpecificationsⅠ.Device Name: Milk Aseptic Processing EquipmentⅡ.Amount: Two setⅢ. The required list of goods:nameProcessing capacityquantityMilk Aseptic Processing EquipmentTwo set *1. Milk UHT processing and aseptic buffer equipment should include the following: l UHT aseptic system.l Proper automatic control system and stable power distribution system.l Energy pipes connected with equipment.l Signal wires connected with the pretreatment and the filler.l Product pipes and CIP pipe connected with the aseptic filler.2. The bidder should also provide spares, spare parts and special maintenance tools for single equipment required by equipment running 6000hrs. The list should mark the number, amount and unitprice of spare parts. 3. The domestic matching equipment should independently list the name, type, manufacturer and price of equipment. And the quality standard of the manufacturers’ should be the same as import equipment’s.4. The project includes all of design, supply, installation, missioning of equipment and personal training. It also includes the equipment of supply, matching installation material, piping engineering, supports, valves, spare parts and special tools. Electrical system, control system, meters, supports of cables and piping matching with the design of supply should be also included in bidding document.5. All of the brands, the using indication and the warning labels of equipment and its auxiliary equipment should be expressed by English or Chinese and mon signs.6. The exterior packaging should be antiwear, protection against the tide, rust amp。 shock, and protection against the rude loading amp。 missioning of the system and the total schedule of the testing run before Dec. 20, 2002,and begin to process aseptic test from ,2003 . The bidder should also make a plan about engineering in detail and provide it in the bidding document.Ⅳ.Design base:*. The production line of UHT should be automatic control. The 6t/h homogenizer should b