【文章內(nèi)容簡介】
the process that ensure the supplier is capable of manufacturing the parts/materials to the released specifications. ? Primary Source Section * Rejecting Sample Submission * Approval Sample Submission * Conditional Approval Sample Submission * First Buy,Risky Buy * First Article Inspection (FAI) Stage ? Secondary Source Section ? First Article Inspection (FAI) ? IQC Date for Critical Components ? Test Data at the Drive Level 供應(yīng)商管理 ? SCAR * Supplier Quality Engineering will issue a supplier corrective action for preventing defect from reoccurrence if a part that a supplier supplies does not meet our required specification(S) or performance. ? Scar Issue Reason * IQC Rejected Material * Customer Return (Field Return) * Stock Purge Material * Reliability Test Fail * Line Reject Complain * Supplier Process System * FQA Inspection * Nonconforming ? STATUS OPEN ? STATUS FOLLOW UP ? STATUS CLOSED ? Response Time Milestones 供應(yīng)商管理 ? Score Card Rating System To grade the Qualified Suppliers for quality improvement and goods allocation. * To improve supplier quality and management system. * To disqualify unacceptable supplier by scorecard if necessary. * Acceptable Level QC 工程圖 ? 制程:從原材料輸入到成品出廠的整個組織和活動的過程; ? QC工程圖是根據(jù)生產(chǎn)品的針對管理項(xiàng)目和品質(zhì)特征把由何人,在何時用何方法及其結(jié)果作成一覽表,以表示在整個加工制程的品質(zhì)保証方案。 ? 一般包含以下內(nèi)容: 制程名稱 /管理項(xiàng)目 /品質(zhì)特性 /管理方法 /使用設(shè)備儀器 /抽樣頻率 /檢驗(yàn)方法 /失效處理等 抽樣與檢驗(yàn) ? 檢驗(yàn)的意義是用某種方法來理測物品 ﹐ 把它的結(jié)果和品質(zhì)判定基準(zhǔn)相比