【文章內(nèi)容簡介】
of the pile pile, with J2 theodolite measuring out the pile engineering samples, requirements have to be lofting Φ 6 round steel, the error shall not be greater than 1 ,再根據(jù)軸線樁布設(shè)各條軸線的各分軸線樁,用J2經(jīng)緯儀測放出各工程樣樁,要求要Φ6圓鋼進(jìn)行放樣,其誤差不得大于1cm。Axis positioning also pletes the review work, each time to review the measurement data should be archived for future reference, and please build supervision and owner unit check, and make the book visa face to ,每次復(fù)核測量數(shù)據(jù)應(yīng)存檔備查,并請建監(jiān)理及業(yè)主單位核驗,并做好書面簽證。 Site preparation場地準(zhǔn)備(1)Construction site must be flat topography, venue is not flatness should be 1%, construction areas around open drain, field with blind ditch, asking for a flat, the rain stopped not water施工現(xiàn)場地勢必須平坦,場地不平整度應(yīng)<1% ,施工區(qū)域四周開設(shè)排水溝,場內(nèi)設(shè)盲溝,要求達(dá)到雨停場平,不積水。二、Site plan施工現(xiàn)場總平面布置示意圖 in accordance with the total package units construction layout plan, ready to live life, construction of temporary ,做好現(xiàn)場生活、施工的臨時設(shè)施。 considering of the need to transport goods pile, the construction site to north and south road, the goods can transport to the whole construction turning radius shall meet the operation of the ,在施工現(xiàn)場道路要南北向貫通,使商品樁能運輸?shù)秸麄€施工區(qū)域。道路的轉(zhuǎn)彎半徑應(yīng)滿足載重車的運行。Chapter 4 Construction schedule amp。 guarantee measures of project duration 第四章、施工計劃及工期保證措施一、 Construction machinery arrangement schedule施工機械配置計劃表 SEQ序號NAME名稱MODEL型號UNIT單位QTY數(shù)量COMMENT備注1Piling machine打樁機YZY300臺1For piling打樁主機2Truck crane汽車吊50T輛1Load amp。 unload piling machine裝、卸樁機3Welding machine焊機NBC400臺2Pile following接樁4Theodolite經(jīng)緯儀J2臺2Setting out放樣、校正垂直度5Level水準(zhǔn)儀S3臺1Control elevation控制標(biāo)高6Tool box工具箱個1Store tools儲放樁機配件工具7Tape50m卷尺把1Measuring丈量8Distribution box配電箱只1Matched cable電纜配套9Pile follower送樁桿φ500根11 spare usage送樁備用1根(1)Piling machine arrangement樁機安排:a 300T static pressure machine will be adopted for construction, equipped with pile follower本工程安排一臺300噸靜壓樁機進(jìn)行施工,配置相應(yīng)的送樁桿。(2)Construction progress plan施工進(jìn)度計劃:mence date is set on 25 Oct,2016 for time being, details shall be up to written notice of tender, planned duration is 10 calendar days開工日期暫定為2016年10月25日,具體以建設(shè)單位書面通知為準(zhǔn),計劃工期為10日歷天。二、Manpower plan勞動力安排計劃 Seq序號Type of work工 種Qty人 數(shù)Seq序號Type of work工 種Qty人 數(shù)1PM項目經(jīng)理17HSE specialist安 全 員12Tech. director技術(shù)負(fù)責(zé)18Documenter資料員(統(tǒng)計)13Forman機 長19Electrician電工、機修14Construction engineer施 工 員110Instructor指 揮 員15Quality specialist質(zhì) 量 員111Welder電 焊 工26Measureman測 量 員112Operator機 操 工1三、Construction progress schedule施工總進(jìn)度計劃表Construction progress schedule施 工 進(jìn) 度 計 劃 表序Seq號Content項目內(nèi)容Qty數(shù)量(根) 天數(shù)Day工作內(nèi)容ContentDuration 施工天數(shù)21011Mobilization and assembly樁機進(jìn)場組裝Preparation準(zhǔn)備工作2天day2PHCAB500(100)89Piling工程樁施打 10天day3Disassembly樁機拆卸Demobilization樁機撤場 1天dayNote說明:一:This plan is according to the needs of the bidding documents and design documents, piling progress to meet the pile machine production and overall progress as a premise for pilation本計劃根據(jù)招標(biāo)文件及設(shè)計文件要求進(jìn)行編排,打樁進(jìn)度以滿足樁機日產(chǎn)及總體進(jìn)度為前提進(jìn)行編制。二:1 piling machine is proposed, mence date is 25 time being, details shall be up to written notice of tender本工程擬安排一臺樁機進(jìn)行施工,開工日期暫定為2016年10月25日,具體以招標(biāo)單位書面通知為準(zhǔn)。三:Pile no. and spec shall be in accordance with construction drawing, planed duration is 10 calendar days樁數(shù)量、規(guī)格以設(shè)計施工圖為準(zhǔn),進(jìn)度計劃僅作示意,計劃工期為10日歷天。Chapter5 Construction scheme 第五章 施工技術(shù)方案一、Construction process flow施工工序流程圖PHC pile sinking process PHC管樁沉樁工藝流程Construction site plan施工現(xiàn)場平面布置和處理Mobilization, assembly of machinary施工機械進(jìn)場、組裝和就位Prefabrication工廠預(yù)制PHC樁Surveying測量放線、定樁位Demobilzation退場Pile inspection樁身檢查 Unqulified不合格Inserting插樁 Qualified合格Perpendicularity inspection樁身垂直度樁位校正 不合格Unqualified Sinking沉樁 合格Qualified焊接設(shè)備及材料準(zhǔn)備樁身垂直度校正Pile following接樁Welding接樁焊接Weld joint dealing焊縫處理Welding inspection焊接質(zhì)量檢驗 Unqualified不合格Keep sinking繼續(xù)沉樁 Qualified合格If pile following是否送樁 是YesPile follwing送樁Sinking report出沉樁記錄報告Pile following to design elevation樁送至設(shè)計標(biāo)高Pull out pile follower, cap拔出送樁器、填蓋樁孔Elevation of pile top樁頂標(biāo)高測量二、PHC piling route PHC管樁打樁線路Bitmap according to the design of pile, the engineering pile foundation according to decorate a pile machine, 3 root pile test it first, after the play, according to the total floor plan, location close to the building of engineering pile construction first, try to reduce the vibration and paction pile due to the negative impact of the surrounding facilities arrangement principles for piling process根據(jù)設(shè)計樁位圖,本工程基礎(chǔ)樁施打布置1臺樁機,3根試樁先施打,施打完畢后,根據(jù)總平面圖,靠近建筑物位置的工程樁先施工,盡量減少因打樁產(chǎn)生的震動和擠土對周圍設(shè)施的不利影響為打樁流程安排原則。三、Transportation, hoisting, storage of PHC pile PHC PHC管樁的運輸及吊裝、堆放This foundation piling engineering of the main ponent is: choose jiashan county new suitable prefabricated pany production of PHC pipe piles, models for PHC 500 (100), AB, as shown in the pile construction drawing, the number for :選用嘉善縣新順預(yù)制構(gòu)件公司制作的PHC管樁,型號為PHC500(100)AB,詳見樁位施工圖,數(shù)量為89根。Pile of lifting, transport and storage requirements to meet the technical specification for the building pile foundation JGJ942008 and the prestressed concrete pipe pile atlas of the 10 g409 regulation. Because of PHC pipe piles for the factory, the manufacturer in supply transportation and pile driving construction schedule and supply plan, must work closely, ensure s