【文章內(nèi)容簡(jiǎn)介】
Leader: Wang Xiang Yang Planning and Scheduling Leader: Tong Lian Zhang Resultant: Patrick Geiger COE: Dave McDonald Advisors: TBD Hengan Others: TBD PROPRIETARY ?20xx Thomas Group, Inc. All Rights Reserved. 生產(chǎn)技術(shù)流程 Fulfillment Process PROPRIETARY ?20xx Thomas Group, Inc. All Rights Reserved. 06個(gè)月期限內(nèi)需完成的行動(dòng) Actions to be pleted during 06 Month Period 1. Create Job Description and assign Forecasting and Planning Process Owner(s) 2. Train Forecasting and Planning Process Owner. 3. Implement Planning and Forecasting Process 4. ABC Analysis of Raw Material and Finished Goods (All Locations) 5. Define Criteria for Obsolete Inventory 6. Identify Obsolete Inventory 7. Evaluate Purchasing Agreements 8. Consolidate Inventory Information 9. Evaluate Systems Capabilities 10. Develop Obsolete / Excess Inventory Disposal Plan 11. Coordinate implementation of Pulp Purchase Strategy with the next buy 減少現(xiàn)有庫(kù)存天數(shù) Reduction In Days Inventory On Hand (DOH) 1. 編寫工作崗位說(shuō)明,分派負(fù)責(zé)人 2. 培訓(xùn)生產(chǎn)規(guī)劃員 3. 實(shí)施總生產(chǎn)規(guī)劃流程 4. 原材料和成品的初步分析(各地全面開展) 5. 界定過(guò)期庫(kù)存的標(biāo)準(zhǔn) 6. 識(shí)別過(guò)期庫(kù)存 7. 評(píng)估采購(gòu)協(xié)議 8. 整合庫(kù)存信息 9. 評(píng)估系統(tǒng)能力 10. 制定過(guò)期庫(kù)存處理計(jì)劃 11. 協(xié)助執(zhí)行近期紙漿采購(gòu)策略 PROPRIETARY ?20xx Thomas Group, Inc. All Rights Reserved. 1. Dispose of Obsolete Inventory 2. Analyze Pulp Market 3. Generate Factory Load Profile 4. Determine Inventory Build Criteria (To Order, Forecast or To Stock) 5. Identify Build to Forecast and Build to Order, Stock SKU’s 6. Design Internal Pull System 7. Install Internal Pull System 8. Identify Suppliers for Pull System 9. Design a Supplier Pull System 現(xiàn)有庫(kù)存天數(shù)的縮短 Reduction In Days Inventory On Hand (DOH) 1. 處理過(guò)期庫(kù)存 2. 分析紙漿市場(chǎng) 3. 產(chǎn)生工廠開工的標(biāo)準(zhǔn) 4. 確定建立庫(kù)存的標(biāo)準(zhǔn)(按訂單,按預(yù)測(cè)或按存貨) 5. 識(shí)別是否按預(yù)測(cè)建立庫(kù)存、按訂單建立庫(kù)存、按庫(kù)存量建立庫(kù)存 6. 設(shè)計(jì)內(nèi)部拉動(dòng)系統(tǒng) 7. 安裝內(nèi)部拉動(dòng)系統(tǒng) 8. 識(shí)別拉動(dòng)系統(tǒng)所需供應(yīng)商 9. 設(shè)計(jì)供應(yīng)商拉動(dòng)系統(tǒng) 612個(gè)月期限內(nèi)需完成的行動(dòng) Actions to be pleted during 612 Month Period PROPRIETARY ?20xx Thomas Group, Inc. All Rights Reserved. 1. Dispose of Obsolete Inventory 2. Install Internal Pull System 3. Install Supplier Pull System 4. Identify Suppliers for Management of Raw Material Inventory 5. Design Supplier Inventory Management Approach 1. 處理過(guò)期庫(kù)存 2. 建立內(nèi)部拉動(dòng)系統(tǒng) 3. 建立供應(yīng)商拉動(dòng)系統(tǒng) 4. 識(shí)別原材料庫(kù)存管理中的供應(yīng)商 5. 設(shè)計(jì)供應(yīng)商庫(kù)存管理方法 現(xiàn)有庫(kù)存天數(shù)的縮短 Reduction In Days Inventory On Hand (DOH) 1218個(gè)月期限內(nèi)需完成的行動(dòng) Actions to be pleted during 1218 Month Period PROPRIETARY ?20xx Thomas Group, Inc. All Rights Reserved. 1. Dispose of Obsolete Inventory 2. Conclude initial Supplier Inventory Management Contracts 3. Implement Inventory Management by Suppliers 4. Develop and Imple