freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

看板管理舉例英文(編輯修改稿)

2024-11-14 18:09 本頁面
 

【文章內(nèi)容簡(jiǎn)介】 e available ( breaks and lunch) 450 min. Number of shifts x 2 Time available for production on 1 machine 1 day = 900 min. Time required per day to meet average demand* 703 min. Net time available for set up and changeovers per day = 197 min. * Taken from above chart on basic machine data Part Average demand per day (pieces) Cycle time Per piece Required run time per day Average changeover time Average scrap rate 15487 200 40 sec. 136 min. 55 min. % 15488 300 45 sec. 228 min. 55 min. % 15489 500 40 sec. 339 min. 55 min. % 1,000 703 min. *The three part numbers dedicated to this molding machine Step 2: Set the number of change over events per day Nonproduction time available 197 min. Average downtim
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1