freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

看板管理舉例英文-文庫吧資料

2024-10-24 18:09本頁面
  

【正文】 xt Batch Process Part 15455 Part 15456 15454 15455 15456 B C Note: Only 1 triangle kanban per part is needed in this flow Triangle Kanban Part Trigger Point Part Description Location Date Triggered Lot Size Tool Machine : ; :; : Short exercise Steps for setting up triangle kanban* Step 1: Determine time available for changeover work. Step 2: Set the number of changeovers per day. Step 3: Establish a lot size for production. Step 4: Establish a trigger point for reorder. *Assumes part numbers have already been dedicated to run on certain machines Step 1: Determine time available for nonproduction work (1 machine*) Total 1shift production time available ( breaks and l
點擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1