【正文】
★建筑設(shè)計施工圖紙★建筑規(guī)劃設(shè)計方案及施工圖★園林景觀設(shè)計施工圖紙★室內(nèi)裝修設(shè)計圖紙★建筑結(jié)構(gòu)設(shè)計方案與施工圖★給排水設(shè)計方案與施工圖★暖通空調(diào)設(shè)計方案與施工圖★電氣設(shè)計方案與施工圖★設(shè)計施工組織方案大全★建筑及景觀表現(xiàn)PSD后期處理效果圖 是為廣大藝術(shù)設(shè)計工作者優(yōu)質(zhì)設(shè)計學習參考資料。Plate girder should handled to 0 m in the right side of boiler by special platform lorry, CC1400crawler cranes or main cranes should be used to unload. FZQ2000 tower crane and CC2500/CC1400 are used to lift J,K,L plate girder. Consequence is L,K,J, other plate girders should respectively be hoisted by FZQ2000 tower crane or CC2500/CC1400 crawler crane. FZQ2000/80t cylindrical crane and CC1400/CC2500 crawler crane are employed to hoist boiler roof plate girder. FZQ2000/80t cylindrical crane should be arranged in both sides of boiler 1and2, each boiler should be arranged with one mill after later. , while CC1400 or CC2500 crawler crane should be arranged between the tow boilers ,one mill should be erected later if necessary so that CC2500/CC1400 can meet the requirement of roof plate girder hoisting. 板梁由專用平板車運輸至爐右側(cè)0m處,利用CC1400履帶吊卸車或者兩主吊同卸,其中J、K、 L三根板梁利用FZQ2000塔吊和CC2500/CC1400共同抬吊到安裝位置。After the erection of pillars of structure, beams , braces , to meet the requirement of girder hoisting, some shafts should be saved to their position and erected after passing test ,then plate beams hoisting could mence. 鍋爐頂板梁的吊裝機械為FZQ2000/80t圓筒吊和CC1400/CC2500履帶吊。During the erection of structure, according to the progress of goods supply and parts fabrication, and erection position and height , we can save some equipments in their required position and ercet later such equipments including, primary hot air duct, secondary hot air duct, rotaty air preheator, preheator inlet flue gas ducting,