freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

2x600mw鍋爐主要施工組織設(shè)計方案(參考版)

2025-05-06 18:47本頁面
  

【正文】 ★建筑設(shè)計施工圖紙★建筑規(guī)劃設(shè)計方案及施工圖★園林景觀設(shè)計施工圖紙★室內(nèi)裝修設(shè)計圖紙★建筑結(jié)構(gòu)設(shè)計方案與施工圖★給排水設(shè)計方案與施工圖★暖通空調(diào)設(shè)計方案與施工圖★電氣設(shè)計方案與施工圖★設(shè)計施工組織方案大全★建筑及景觀表現(xiàn)PSD后期處理效果圖 是為廣大藝術(shù)設(shè)計工作者優(yōu)質(zhì)設(shè)計學習參考資料。Plate girder should handled to 0 m in the right side of boiler by special platform lorry, CC1400crawler cranes or main cranes should be used to unload. FZQ2000 tower crane and CC2500/CC1400 are used to lift J,K,L plate girder. Consequence is L,K,J, other plate girders should respectively be hoisted by FZQ2000 tower crane or CC2500/CC1400 crawler crane. FZQ2000/80t cylindrical crane and CC1400/CC2500 crawler crane are employed to hoist boiler roof plate girder. FZQ2000/80t cylindrical crane should be arranged in both sides of boiler 1and2, each boiler should be arranged with one mill after later. , while CC1400 or CC2500 crawler crane should be arranged between the tow boilers ,one mill should be erected later if necessary so that CC2500/CC1400 can meet the requirement of roof plate girder hoisting. 板梁由專用平板車運輸至爐右側(cè)0m處,利用CC1400履帶吊卸車或者兩主吊同卸,其中J、K、 L三根板梁利用FZQ2000塔吊和CC2500/CC1400共同抬吊到安裝位置。After the erection of pillars of structure, beams , braces , to meet the requirement of girder hoisting, some shafts should be saved to their position and erected after passing test ,then plate beams hoisting could mence. 鍋爐頂板梁的吊裝機械為FZQ2000/80t圓筒吊和CC1400/CC2500履帶吊。During the erection of structure, according to the progress of goods supply and parts fabrication, and erection position and height , we can save some equipments in their required position and ercet later such equipments including, primary hot air duct, secondary hot air duct, rotaty air preheator, preheator inlet flue gas ducting,
點擊復制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1