freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

橋梁外文翻譯-橋梁設(shè)計(jì)-資料下載頁(yè)

2025-01-19 05:48本頁(yè)面

【導(dǎo)讀】成為開(kāi)放的住宅發(fā)展區(qū)。鎖城地區(qū)是位于住宅發(fā)展十分緊張的韋斯頓超。監(jiān)督橋梁建設(shè)的客戶是城堡建設(shè)有限公司,它由二大房建。斯托爾和??巳?。規(guī)劃條件規(guī)定,直到建成這條橫跨的鐵路大橋?yàn)橹梗摰貐^(qū)南部區(qū)域不可能適應(yīng)居住。NSDC發(fā)出投標(biāo)文件。該合同在2021年7月1授予安迪。投標(biāo)價(jià)值億美元,合同期。定為34周,到2021年4月完成。分的經(jīng)濟(jì)分析后交付承包商,院長(zhǎng)及安迪。鋼樁柱下的橋臺(tái)地區(qū)與相鄰鐵路線之間必須是垂直運(yùn)動(dòng)。下,可驅(qū)動(dòng)更接近軌道而不會(huì)有任何問(wèn)題。并在受影響區(qū)域進(jìn)行了監(jiān)測(cè),打樁作業(yè)和水平高程的變化小于要求的6毫米。在地面下覆蓋厚達(dá)19米的軟沖積土。米的大口徑水管,以應(yīng)付不同載入條件所造成的橋梁和堤壩的不同荷載。這些有利于樁體的載入。試驗(yàn)證實(shí)了完整的設(shè)計(jì)和表示最多解決在工。為了減少蔓延的路堤,高速公路規(guī)范做路堤材料的相關(guān)規(guī)定。標(biāo)準(zhǔn)型的P2護(hù)墻的目的是保護(hù)的邊緣河堤。因此,對(duì)該小組提出了。以避免出現(xiàn)外觀問(wèn)題。

  

【正文】 led at the correct spacing. Team work between the designer and contractor led to a reduction in the number of panel types from 30 to 17, ranging in length from a maximum of 365 m to a minimum of 198 m, while keeping the parapet posts at a constant spacing along the main length of the embankments (Fig. 9). The precast units were tied together by means of an in situ element. This prised a slab extending the entire length of the embankments from the bankseats to the end of the parapet units. The slab was cast continuously, without joints, so that it acted as a beam. The slab was designed with a toe, which, together with friction, counteracts the lateral forces from accidental loading of the parapet posts while the overturning forces of any impact are countered by the weight and cantilever effect of the continuous slab. The P2 support sections were placed and levelled to give apleasing sweep and elevation to the bridge while a tail on the PCC unit was included to hide the top of the brickwork wall, ensuring a neat appearance was achieved. 6. TEAM WORKIN One of the most pleasing aspects of the scheme was the goodworking relationship that was maintained between all parties. Although working under the General Conditions of Contract for Building and Civil Engineering GC/works/1,2the contractor was keen to espouse the ethics of partnering. Regular meetingsbetween the contractor, designer, client’s engineer and client’s architect took place to keep all parties informed of the latest developments and to deal with concerns before they became a distraction. Communications, channelled through the contractor, between interested third parties, such as Railtrack and NSDC, were also well managed, which ensured that possessions were granted as requested and adoption requirements were dealt with swiftly. This approach was key to meeting the tight construction deadline and in dealing with the minor omissions found in the tender design in a professional manner. It is a credit to the contractor that this was maintained throughout the period of the contract. 7. SUMMARY Locking Castle Bridge is based on a modern and innovative design which, along with its appearance (Fig. 10), bene?ts the local environment and provides a focal point for the new residential development. The creation of a park adjacent to the southern embankment will enhance the status and appearance of the bridge in years to e and provide a sense of pride forall those involved in the construction of Locking Castle Bridge. REFERENCES 1. Speci?cation for Highway Works. In: Manual of ContractDocument for Highway Works. Highways Agency. TheStationery Of?ce, 1993. 2. GC/Works/1: Conditions of Contract for Major Building and Civil Engineering Works. Single Stage Design amp。 Build, The Stationery Of?ce, 1998. 本科畢業(yè)設(shè)計(jì)(論文) 外文翻譯 題 目 : Castle Bridge, WestonSuperMare, UK 學(xué) 院 : 土木建筑學(xué)院 專(zhuān) 業(yè) : 土木工程專(zhuān)業(yè)(橋梁) 年 級(jí) : 2021 級(jí) 橋梁 3 班 學(xué)生姓名 : 曹 沖 學(xué) 號(hào) : 07010907 指導(dǎo)老師 : 劉 東 重慶交通大學(xué) 2021 年 6 月
點(diǎn)擊復(fù)制文檔內(nèi)容
法律信息相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1