【文章內(nèi)容簡介】
Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name):內(nèi)部質(zhì)量審核控制程序 Internal Quality Audit Control Procedures 版次 Ver 頁次 Page 發(fā)行日期 Release Date 文件編號 (Doc No): AICQ/QP1701 B/0 4 8 20xx0110 4 審核準備 Planning of Audits 管理者代表根據(jù)年度審核計劃,指定每次審核的審核組長及內(nèi)審員。 The management representative shall, according to the annual audit plan, appoint audit team leader and internal quality auditors for each audit. 審核組長制定審核工作計劃時應按照活動的實際情況和重要性來安排日程計劃(適 當?shù)墓ぷ鳁l件、環(huán)境和日?,F(xiàn)場管理應納入審核范圍)。審核工作計劃應包括: When formulating audit plan, the audit team leader shall arrange the schedules according to the actual conditions and importance of the activities (Appropriate working conditions, environment and routine site management shall be covered in the audits). The audit plan shall include: a. 審核目的、范圍; Objective and scope of audits。 b. 審核依據(jù); Basis of audits。 c. 受審核部門; The departments to be audited。 d. 審核員分工; Job division of auditors。 e. 時間安排等。 Time schedule, etc. 審核員根據(jù)分工 (內(nèi)審員應與被審核的活動、事項無直接責任) , 編制檢 查表,檢查表須包括以下內(nèi)容: The auditors shall formulate the checklist according to the job division. (The auditors shall have no direct responsibility with the activities and items to be audited). The checklist shall 程 序 文 件 Procedure Document 重慶英特空調(diào)有限公司 Air International Chongqing Co., Ltd. 文件名稱 (Doc Name):內(nèi)部質(zhì)量審核控制程序 Internal Quality Audit Control Procedures 版次 Ver 頁次 Page 發(fā)行日期 Release Date 文件編號 (Doc No): AICQ/QP1701 B/0 5 8 20xx0110 5 include: a. 受審核部門的職能及所涉及的相關部門; The functions of the departments to be audited, and the relevant departments concerned。 b. 審核文件要點; The essence of the audit documents。 c. 檢查的主要內(nèi)容及時間安排,時間安排須覆蓋所有班次; The main contents and time schedule of the audits. The time schedule shall cover all shifts. d. 取樣方法。 Sampling methods. 內(nèi)審組長 提前五個工作日向?qū)徍瞬块T發(fā)出審核通知。 The audit team leader shall send the audit notification to the department to be audited five days in advance. 受審核部門如對審核時間、審核項目有異議,在接到通知兩個工作日內(nèi)與審核組協(xié)商,更改審核項目必須經(jīng)管理者代表批準后另行安排。 If the departments to be audited have disputes against the audit time and items, they shall negotiate with the audit team within two days after receipt of the