freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

質(zhì)量控制計劃概述(編輯修改稿)

2024-08-16 05:46 本頁面
 

【文章內(nèi)容簡介】 量獎懲。Specialized quality joint inspection專業(yè)性質(zhì)量大檢查Quality joint inspection for different specialties like prefabrication of steel structure, prefabrication of piping, rigging equipment, installation of piping and equipment, package pressure test, pretrial run of rotary equipment, and missioning, shall be organized by QA/QC manager with the help of functional departments such as quality, safety, technology and prehensive departments. “Specialty Group” and “Management Group” shall do the joint inspection, in detail, “Management Group” is responsible for inspection of management procedures, responsibility execution, files and documents, and “Specialty Group” for inspection of specialize construction quality, construction records and confirmation of jointinspection points. 在工程施工各階段,一般分為鋼結(jié)構(gòu)預(yù)制、管道預(yù)制,設(shè)備吊裝,設(shè)備、管道安裝,系統(tǒng)試壓、單機(jī)試運、聯(lián)動試車等,由項目總工程師組織質(zhì)量、安全、技術(shù)、計調(diào)等職能組進(jìn)行專業(yè)質(zhì)量大檢查,檢查分管理組和專業(yè)組,管理組負(fù)責(zé)檢查管理程序、職責(zé)落實、文件資料,專業(yè)組負(fù)責(zé)檢查專業(yè)工程質(zhì)量(施工難點、關(guān)鍵環(huán)節(jié)、隱蔽工程質(zhì)量)、施工記錄(交、竣工文件、檢試驗狀態(tài)記錄、無損檢測報告)自檢及質(zhì)量通病治理、共檢點確認(rèn)情況等。. Management of quality assurance system operation質(zhì)量體系運行管理內(nèi)容Quality control during preparation for construction施工準(zhǔn)備階段的質(zhì)量控制Establish and perfect quality assurance system for project construction and its assurance measures, bring into effect quality control organization, and work out quality system operation schedule, quality control schedule (including treatment schedule for mon quality faults) and quality schedule. 建立、健全項目質(zhì)量保證體系,完善質(zhì)量保證措施,落實質(zhì)量控制組織,制定質(zhì)量體系運行計劃、質(zhì)量控制規(guī)劃(包括質(zhì)量通病防治計劃)和質(zhì)量工作計劃。Compile Construction Organization Planning and Construction Schemes.編制施工組織設(shè)計、施工技術(shù)方案。Organize professional technicians to familiarize design document and drawings, precisely understand design intent and participate in joint checkup of drawings and design presentation. 組織專業(yè)技術(shù)人員熟悉設(shè)計圖紙,準(zhǔn)確領(lǐng)會設(shè)計意圖并參加圖紙會審、設(shè)計交底。Confirm project construction quality control points (A, B, C) which shall be confirmed by FW.確定專業(yè)工程質(zhì)量控制點(A、B、C),報FW確認(rèn)。Prepare for construction equipment and apparatus which have been confirmed to be qualified.施工機(jī)具、工藝設(shè)備、檢測設(shè)備準(zhǔn)備,確保檢試驗設(shè)備檢定合格并有合格標(biāo)識。Confirm conditions for welding material warehouse and valve pressure test. 對焊材庫、閥門試壓等使用條件進(jìn)行確認(rèn)。Check qualification certificates of personnel and report to FW to confirmation.各類人員、施工資質(zhì)審查,并報FW確認(rèn)。Strengthen workers and staff training and quality education.職工培訓(xùn)及質(zhì)量教育。Confirm conditions for starting construction work.開工條件確認(rèn)。Quality management during construction施工階段質(zhì)量管理Strengthen the management and distribution of equipment, materials and accessories, prevent low quality materials and equipment from entering construction field and protect all onsite materials from being damaged or lost. 嚴(yán)格設(shè)備、材料、配件驗收管理和發(fā)放,控制進(jìn)入現(xiàn)場設(shè)備、物資質(zhì)量,做好現(xiàn)場物資的防護(hù)。Organize construction technology presentation, and ascertain construction procedures, methods, quality criteria, and requirement for selfinspection and inspection to be done by others. 組織施工技術(shù)交底,明確施工程序、方法、質(zhì)量標(biāo)準(zhǔn)和自檢、報檢要求。Perform quality inspection for construction working procedures as per the Quality Control Procedures or coordinate with external departments for inspection. 按質(zhì)量控制程序?qū)嵤┕ば蛸|(zhì)量檢查確認(rèn)、報檢、共檢。Summon regular quality meetings every month and perform interior checkup for quality system as the “quality system operation schedule” in order to gain enough information in quality management and construction quality and bring quality schedule into effect.每月定期召開質(zhì)量例會按質(zhì)量體系運行計劃組織項目質(zhì)量體系內(nèi)部審核,掌握質(zhì)量管理工作和工程質(zhì)量動態(tài),落實質(zhì)量計劃,制定、落實糾正預(yù)防措施。Strengthen control to mon quality faults and unqualified products and perfect quality accident treatment measures. 加強(qiáng)質(zhì)量通病預(yù)檢預(yù)防控制,嚴(yán)格不合格品控制,按“三不放過”原則做好質(zhì)量事故處理工作。Monitor and control particular process and working procedures in a continuous way.對特殊工序或過程進(jìn)行連續(xù)監(jiān)控。Keep executing construction records and quality evaluation in pace with construction proceeding. 做到施工記錄、質(zhì)量評定與工程進(jìn)度同步。Organize professional or stagebystage major inspection and coordinate with FW, Quality Supervision and Inspection Station and/or local Labor Departments in joint inspection. 組織專業(yè)或階段質(zhì)量大檢查,積極配合FW、質(zhì)量技術(shù)監(jiān)督部門和地方政府勞動部門組織的質(zhì)量大檢查,對存在的問題徹底整改。Organize joint inspection according to pressure test packages and handover system. 按試壓系統(tǒng)、交工系統(tǒng)組織聯(lián)合檢查,做好系統(tǒng)質(zhì)量確認(rèn)工作。Quality management before ending of construction and during construction project acceptance收尾、交工驗收階段質(zhì)量管理Organize inspecting punch list and rectify thoroughly quality problems and potential perils.組織工程交工前的“三查四定”工作,徹底整改質(zhì)量問題和隱患。Establish organization for trial run, ascertain responsibilities, organize a series of work like system pressure test, airtight test, flushing and blowing, and pretrial run for equipment in a good way, keep in touch with FW, supervision unit and design unit in time to finish getting confirmed and preliminary evaluation in order to ensure successful interim handover, and transact “interim handover certificate”. 建立試運領(lǐng)導(dǎo)組織機(jī)構(gòu),落實責(zé)任,組織做好系統(tǒng)試壓、氣密、吹掃和單機(jī)試運等項工作,及時與FW、監(jiān)理、設(shè)計單位聯(lián)系辦理好確認(rèn)工作,完成工程質(zhì)量初評工作,保證順利中交,并辦理“中間交工證書”。Establish a maintenance team with full category of workers adequate for skillful operation, which shall serve during warranty period and be furnished with excellent maintenance apparatus, to coordinate with FW during missioning and trial run with load, plete final quality grade confirmation and document handover and sign “project acceptance certificate”. 組建“工種齊全、機(jī)具配套、素質(zhì)較高、服務(wù)周到”的保運隊伍,配合FW做好聯(lián)動試車、投料試車工作,按時完成工程質(zhì)量等級最終核定和交工資料確認(rèn)工作,辦理交工資料交接手續(xù),簽訂“交工驗收證書”。Deliberatively organize and arrange the work of warranty and returninvestigation精心組織,做好保運工作,并按“工程保修書”做好回訪、保修等項工作。5. Measures for quality control質(zhì)量控制措施To realize the quality objective, perfect quality assurance system shall be built as per the regulations from Company’s “ISO9002 Quality Manual”, and all relevant management and work criteria shall be implemented. Furthermore, quality control shall be carried out in the whole process of construction. 為保證質(zhì)量目標(biāo)的實現(xiàn),工程項目將按照本公司ISO9002《質(zhì)量手冊》的規(guī)定,建立完善的質(zhì)量體系,全面貫徹執(zhí)行有關(guān)管理標(biāo)準(zhǔn)和工作標(biāo)準(zhǔn),實行施工全過程的質(zhì)量控制,在施工準(zhǔn)備、設(shè)備檢驗、原材料供應(yīng)、機(jī)械安裝、試車及機(jī)械竣工各階段進(jìn)行系統(tǒng)的質(zhì)量控制。Coordinate with FW in receiving check
點擊復(fù)制文檔內(nèi)容
外語相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1