ling measure AD value and the Weibull distribution was found to be the best representative for evaluating schedule performance and cost performance having the lowest AD value . In this paper, an example is provided, in which two projects are pared and analyzed. The first part of this paper briefly covers the EVM and performance indices. The second part discusses the Weibull distribution, it sharacteristics and its application to EVM. This is followed by an example of Weibull analysis using actual data of C/SPI, in which two projects are pared. Lastly, conclusions are drawn. Earned Value Method and Performance Indices The goal of the EVM is to control costs and schedule performance during the project. This is acplished by calculating a number of measures. First, the budgeted cost for work scheduled BCWS within a given time period is calculated. Second, the actual cost of work performed ACWP during the given time period and the budgeted cost for work performed BCWP are calculated. The performance indices are determined next to show the percentage of variation, between planned and actual performance. Weibull Analysis Weibull analysis essentially entails fitting a Weibull distribution to a collected data set about some characteristic of a system usually a quality or performance characteristic , and analyzing the reliability of the system based on the fitted distribution. ? Collection of percentplete data of the first project and calculating the SPI/CPI。 ? = m and = eb/ 。 Hordur G. Gunnarsson。本文通過(guò) 威布爾分析 統(tǒng)計(jì)方法隨機(jī)地 評(píng)估建筑業(yè)的實(shí)施計(jì)劃或設(shè)計(jì)規(guī)劃。作者總結(jié)了威布爾分析法的若干優(yōu)點(diǎn),并為建筑業(yè)管理者可以更好地控制和監(jiān)督項(xiàng)目,提供了一種應(yīng)用靈活且高效的方法。大多數(shù)規(guī)劃工作的實(shí)施都是在不同的階段有不同的改變。在 EVM中,在最早的關(guān)鍵的計(jì)劃的基礎(chǔ)上( Chang 2021),計(jì)劃和價(jià)格實(shí)施索引( C/SPI)常被用于對(duì)成本和計(jì)劃持續(xù)監(jiān)督。 在其他的管理領(lǐng)域,像計(jì)算機(jī)軟件設(shè)計(jì)和商業(yè)管理中,以可靠性,實(shí)用性和持續(xù)性,即 RAM 為主要出發(fā)點(diǎn)的工具主要被用于預(yù)報(bào)和避免突發(fā)性系統(tǒng)故障。 Abernathy and Fulton 2021),廣泛應(yīng)用于制造業(yè)和工業(yè)工程領(lǐng)域。大量可能的技術(shù)用 AndersonDarling方式( AD 值)進(jìn)行檢驗(yàn),發(fā)現(xiàn)威布爾分析是對(duì)于計(jì)劃實(shí)施和價(jià)格實(shí)施是最 具典型性的(存在最低的 AD 值)。這一本分的展開使用了威布爾分析的案例種的 C/SPI真實(shí)數(shù)據(jù),此中,兩個(gè)項(xiàng)目被比較。首先,為工作實(shí)施的預(yù)算價(jià)格在一個(gè)特定的時(shí)期內(nèi)進(jìn)行計(jì)算( BCWS) 。 Kim 和 Ballard (2021)。實(shí)施索引在 19 個(gè)月中被一一計(jì)算。這種簡(jiǎn)單的形式適用于大多數(shù)分析報(bào)告。 中間值法如表 3所示。 這能用數(shù)學(xué)形式表示 ln[ln(1/1median rank)]的值和 ln(SPI)的信息點(diǎn)表示成直線。表 4表示了每個(gè)項(xiàng)目的回歸分析參數(shù)。這執(zhí)行能力可以用可行性表或威布爾功能表表示: =威布爾(索引價(jià)值,模型參數(shù),規(guī)模參數(shù),真實(shí)性)(見表 5)。一些問(wèn)題能在圖中指出。 7 這些能用來(lái)作出資源分配和跟進(jìn)項(xiàng)目的決定。 ? 對(duì) SPI/CPI分等級(jí)(較低的給等級(jí) 1); ? 計(jì)算中間等級(jí)(號(hào)碼 (點(diǎn)數(shù) +); ? 在 ln{ ln[1/(1中間等級(jí) )] } 中計(jì)算,在 ln SPI and ln CPI之間劃一條直線分割圖表,選擇表示方程式 y = mx + b直線的點(diǎn); ? β=m and α= e b/ β ; ? 計(jì)算在 MS EXCEL中表示威布爾分布的 PDF值,使用威布爾功能 — 威布爾 [索引價(jià)值,模型參數(shù)( β ),規(guī)模參數(shù)( α ),真實(shí)性 ]; ? 對(duì)應(yīng)索引值繪制 PDF; ? 對(duì)第二個(gè)項(xiàng)目使用相同的步驟; ? 比較兩個(gè)項(xiàng)目。當(dāng)為像 PERT的可能排定方法的實(shí)行持續(xù)時(shí)間建模時(shí),預(yù)定的分布假設(shè)經(jīng)常會(huì)用作樣本。 A β > ,即在從一個(gè)時(shí)期到另一個(gè)時(shí)項(xiàng)目的情況在改善。 第三,威布爾分析的最大優(yōu)勢(shì)是有用極 小樣本提供精確情況分析和風(fēng)險(xiǎn)預(yù)測(cè)的能力。 8 結(jié)論 使項(xiàng)目在時(shí)間表和預(yù)算中完成是每個(gè)項(xiàng)目的主要目標(biāo)。威布爾分布是剛?cè)岵?jì)的,它通過(guò)合理選擇參數(shù) α 和 β 能顯示大范圍變化的類型分布。這項(xiàng)技術(shù)能用在從早期三個(gè)信息點(diǎn)開始的項(xiàng)目中。 Hordur G. Gunnarsson, and Mohamed Y. Hegab, . Using Weibull Analysis for Evaluation of Cost and Schedule Performance. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT 169??梢姡紶柗治龅膬?yōu)勢(shì)使之成為一項(xiàng) 分析時(shí)間和執(zhí)行索引并對(duì)項(xiàng)目管理作決定的有效的技術(shù)。這個(gè)用四個(gè)步驟分析一系列 SPI信息,并用威布爾分析法的例子也是較新的。在工程種,有價(jià)值的方法是通過(guò)簡(jiǎn)單的 C/SPI實(shí)現(xiàn)對(duì)時(shí) 間和經(jīng)濟(jì)的控制的平常技術(shù)。 當(dāng)用 EVM 控制項(xiàng)目的執(zhí)行表和造價(jià)時(shí),評(píng)估執(zhí)行索引的頻率能在每個(gè)項(xiàng)目的持續(xù)時(shí)間和控制水平的基礎(chǔ)上被限定。期望的速率是 β ≥ α (或威布爾特征)是情況