【正文】
ing isolation stent along the length of anchor every2000mm.、錨具:錨具(M172,2孔)≥設(shè)計(jì)值340KN,與鋼絞線2162。 shall be selected in line with the operative norm of GB/T specification of anchor has two types including 3162。、絞線2162。. Length of anchor: its length shall be ~ and the anchorage length shall be 5~ depth that the anchor hacked into the original concrete foundation shall be not less than 1m. 、錨桿入射角度:25度 Injection Degree:25 degree、錨桿直徑:150mm Diameter of anchor:150mm、錨桿:采用鋼絞線162。錨桿施工平面布置詳見(jiàn)附圖(一)(以從上至下為例)所示,然后及時(shí)進(jìn)行后續(xù)各工序的施工。 Issuing technical information to staff for study。 Completing the approach and test of raw materials 。The anchor construction shall be performed simultaneously with the slope excavation. After the pletion of supporting construction of upper slope, excavating to the construction location of prestressed anchor, then carrying out the construction of intermediate beam and prestressed anchor and finishing supporting work for slope in order to reduce exposure time of slope. 1) 、準(zhǔn)備工作:機(jī)具配備質(zhì)量和數(shù)量,人員配置數(shù)量和結(jié)構(gòu)等必須與預(yù)應(yīng)力錨桿施工相適應(yīng),滿(mǎn)足施工需要;完成原材料進(jìn)場(chǎng)及試驗(yàn)檢測(cè);完成施工技術(shù)方案、開(kāi)工報(bào)告等技術(shù)資料的編寫(xiě)、上報(bào)和審批,技術(shù)交底資料的下發(fā)學(xué)習(xí),原材料送檢、報(bào)批手續(xù)及資料收集。The main construction contents include: construction preparation,anchor hole positioning and drilling (including consolidation grouting treatment for poor geological section ),anchor processing preparation, hole cleaning and anchoring, grouting for anchorage section (including secondary splitting grouting),concrete pouring for intermediate beam of anchor and anchor inclined supporting, anchor tension, supplementary grouting and anchor seal work, etc. 勞動(dòng)力組織安排 Plan(1)根據(jù)工程的特點(diǎn)及施工組織設(shè)計(jì)的要求配備勞動(dòng)定員及設(shè)置施工組織機(jī)構(gòu),主要?jiǎng)趧?dòng)力組織見(jiàn)下表:(1)As per this project characteristic and requirement of construction organization design to arrange workers and set up construction manpower as follows:序號(hào)S/N工種Position人數(shù)Qty主要工作內(nèi)容Main Work Content1施工員Engineer5負(fù)責(zé)測(cè)量放線、施工指導(dǎo)及質(zhì)量控制Measure and setting out,construction guidance and quality control2鉆機(jī)司機(jī)Drilling rig driver2錨固鉆機(jī)操作Operate anchorage drilling rig3砂漿攪拌工Mortar mix worker2攪拌桶操作Mix bucket operation4錨索工Anchor cable worker4負(fù)責(zé)錨索安裝Anchor cable installation5綜合輔助工Comprehensive assistant worker8負(fù)責(zé)輔助作業(yè)Normal work6電工Electrician2負(fù)責(zé)施工中涉電作業(yè)Electricity operation7鋼筋工Steel bar worker8負(fù)責(zé)鋼筋制作、綁扎、安裝作業(yè)Steel bar fabrication,binding and installation8模板工Form worker13負(fù)責(zé)模板制作、安裝、加固作業(yè)Formwork fabrication, installation and strengthening(2) 錨桿施工組織機(jī)構(gòu): (2)Construction organization of anchor:現(xiàn)場(chǎng)技術(shù)負(fù)責(zé)人:劉濤;生產(chǎn)負(fù)責(zé)人:胡延輝;Site technical in charge: Liu Tao Site engineer: Hu Yanhui 專(zhuān)職質(zhì)量檢查:李慶東;Special quality inspector: Li Qingdong 主要機(jī)械設(shè)備 Mechanical Equipment預(yù)應(yīng)力錨桿施工進(jìn)場(chǎng)的主要機(jī)械設(shè)備如表1所示The main mechanical equipment prepared for prestressed anchor construction are shown in figure1 below.表1 錨桿施工配備機(jī)械設(shè)備表 Figure1 Mechanical Equipment List for Anchor Construction機(jī)械名稱(chēng)Equipment Name規(guī)格型號(hào)Specification and Model數(shù)量Qty備注Note錨固鉆機(jī)Anchorage drilling rig優(yōu)博林868型Youbolin (Type 868) 2臺(tái)2 nos.注漿設(shè)備Grouting equipment BLW130型攪漿桶Mortar mixing bucket with type BLW1302套2 sets含不良地質(zhì)段處理Including the treatment for poor geological section空 壓 機(jī)Air pressor12m3柴油12m179。3. Report of Geological Engineering Exploration for proposed Water Treatment Plant and onthespot investigation for the surrounding environment of said construction site.中國(guó)現(xiàn)行國(guó)家標(biāo)準(zhǔn)、施工技術(shù)規(guī)范、規(guī)程、質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)及驗(yàn)收方法、安全檢測(cè)標(biāo)準(zhǔn)及技術(shù)規(guī)程、文明施工要求等。 2. Site Preparation Drawings and Design Description of the Site Preparation of Gampaha,Attanagalla amp。 1. The relevant contents and related technical terms about Site Preparation included in the Bidding Document of Gampaha,Attanagalla amp。斯里蘭卡阿塔納水廠場(chǎng)平工程錨桿分項(xiàng)工程SubEngineering of Anchor for Site LevelingSpecific Method Statement專(zhuān)項(xiàng)施工方案編制:Prepared By:審核:Reviewed By:批準(zhǔn):Approved By:CMEC公司斯里蘭卡阿塔納水廠項(xiàng)目部 Gampaha,Attanagalla amp。 Minuwangoda Integrated Water Supply Scheme 編制時(shí)間:2017年09月09日Preparation Date:September 9th , 2017目 錄 Contents第一節(jié)、編制依據(jù)01 I. Preparation Basis第2節(jié) 、施工步驟03 II. Construction Arrangement 一 )、施工步驟03 1. Construction Arrangement 二)、勞動(dòng)力組織安排03 2.Manpower Plan 三)、機(jī)械設(shè)備配置04 Equipment Preparation 四)、主要儀器設(shè)備05 4. Main Instrument and Equipment第三節(jié)、錨桿主要施工方法06 III Main Construction Method of Anchor 一)、總體方案06 1. Overall Scheme 二)、施工準(zhǔn)備08 2. Construction Preparation 三)、錨桿成孔工藝09 3. Boreforming Process of Anchor第四節(jié)、施工進(jìn)度計(jì)劃26 IV Construction Progress Schedule附圖一、質(zhì)量保證機(jī)構(gòu)框架圖32 Attached Figure1 Frame Chart of Quality Assurance Organization 附圖二、安全保證機(jī)構(gòu)框架圖33 Attached Figure2 Frame Chart of Safety Assurance Organization34 / 37第1節(jié) 、編制依據(jù) I. Preparation Basis 阿塔納水廠工程招標(biāo)文件中關(guān)于場(chǎng)地平整的相關(guān)內(nèi)容及相關(guān)技術(shù)條款。 Minuwangoda Integrated Water Supply Scheme. 阿塔納水廠工程場(chǎng)地平整設(shè)計(jì)施圖、圖說(shuō)(送審版)。 Minuwangoda Integrated Water Supply Scheme. (Approval Version) 阿塔納水廠工程地質(zhì)勘探報(bào)告及實(shí)地考察施工現(xiàn)場(chǎng)周邊環(huán)境情況。4. Current national standards in China, technical specifications, procedures, quality i