【正文】
of Ancient buildings in HuangshiA case study of Family le’s clan hall in Feng Yang ZhuangAbstract:In China, due to the cause of building materials, many ancient buildings and are not retained for a long time, many ancient villages faced no one to maintain the problem of abandoned old architecture has a unique value, known as the works of man and nature, is the main carrier of the village on how to solve the ancient village buildings abandoned to Huangshi Feng Yang Zhuang as the object of study, survey and analysis of status quo and study on the conservation of ancient settlements and update on the problems and feasibility of the proposed protection and improvement to retain their architectural styles based on peopleoriented, bined with local characteristics, overall environmental quality issues solving Feng Yang Zhuang, restoring the vitality of architecture, continue the village context, find historical and cultural memory of the words:Huangshi Fengyangzhuang。文章就如何解決古村落建筑廢棄問(wèn)題,以黃石楓楊莊為例,通過(guò)實(shí)地考察,分析古村落保護(hù)與更新上所存在的問(wèn)題,提出保護(hù)與改造的可行性措施。s actual situation and graduation design through the Western Street Canal homes 15 building project as an example, the engineering use of future listed software, Excel, TarchCAD building software, bined with the pricing mode of learning knowledge and the present stage of China, by contrast, quota and piled list mode results, familiar with the process for the preparation of tender control price, bidding, deepen the understanding and application of the cost of :bill valuation, quota valuation, invitation for bid, bidding, Cost management第三篇:本科生畢業(yè)論文中英摘要對(duì)照6對(duì)