【正文】
ortant role in this mission. Starting at the ground, conditions have to be very calm winds less than 2 mph, with no precipitation or humidity and limited cloud cover. The balloon, with capsule attached, will move through the lower level of the atmosphere (the troposphere) where our daytoday weather lives. It will climb higher than the tip of Mount Everest ( miles/ kilometers), drifting even higher than the cruising altitude of mercial airliners ( miles/ kilometers) and into the stratosphere. As he crosses the boundary layer (called the tropopause), he can expect a lot of turbulence.The balloon will slowly drift to the edge of space at 120,000 feet ( miles/ kilometers). Here, Fearless Felix will unclip. He will roll back the door.Then, I would assume, he will slowly step out onto something resembling an Olympic diving platform.Below, the Earth bees the concrete bottom of a swimming pool that he wants to land on, but not too hard. Still, he39。d hear my foot tapping rapidly under my desk. I39。s first satellite Sputnik. I also missed watching Neil Armstrong step foot on the moon and the first space shuttle take off for the stars. Those events were way before my time.As a kid, I was fascinated with what goes on in the sky, and when NASA pulled the plug on the shuttle program I was heartbroken. Yet the privatized space race has renewed my childhood dreams to reach for the stars.As a meteorologist, I39。場地平整、碾壓現(xiàn)澆箱梁施工工藝框圖滿堂支架地基處理碗口支架搭設頂托枋木、下次梁鋪設設翼緣板模板安裝腹板模板安裝模板安裝支架預壓鋼筋加工底腹板鋼筋綁扎原材料準備砼拌合底腹板砼澆注養(yǎng)護箱梁頂板內膜安裝鋼筋加工箱梁頂板鋼筋綁扎原材料準備砼拌合頂板砼澆注砼養(yǎng)護測定同養(yǎng)砼試件拆除支架及模板45安全生產(chǎn)保證體系安全無事故獎罰嚴明下步規(guī)劃安 全 年措施保證包保責任制人身安全檔案安全設施檔案措施得力安全信息反饋確保生產(chǎn)安全制度完備獎罰兌現(xiàn)工班QC小組質 量 第 一生命 至 上下道工序安全教育制定教育計劃工區(qū)QC小組掌握規(guī)范驗收標準技 術 交 底提高安全意識全 員機械車輛高空水下作業(yè)抓好重點經(jīng)常檢查定期檢查五 防安全勞動競賽總結評比安全獎金掛鉤二級檢查工資掛鉤經(jīng)濟責任制經(jīng)濟保證制度保證控制兩率組織保證思想保證安全生產(chǎn)保證體系項目經(jīng)理部安全委員會安全教育Editor39。1施工人員必須佩戴安全帽,上崗證,證件應附照片并寫明姓名、單位、崗位等。拌和站區(qū)樹立標志牌,并立有警告標志。堅持持久地開展各種文明競賽活動,爭做“四有新人”,建設優(yōu)秀職工之家,開展豐富多樣的文體活動,活躍職工的精神生活。 做好施工現(xiàn)場各類機械設備和車輛分類安置工作,工地車輛出入口設置用混凝土圍成的洗車場和沉淀池,配置高壓沖洗槍,車輛上路前或回到駐地均應沖洗干凈。 做好辦公、生活區(qū)內三防、綠化、醫(yī)療、衛(wèi)生、保險工作和租用房屋的管理工作。工程管理人員、技術人員一律佩證上崗,維持工區(qū)內施工秩序,無證人員不得進入工地。設置醒目的250cm150cm綠底白字標語牌,書寫本標段工程有關內容,介紹工程范圍、工程量、質量安全要求及負責人姓名等內容。K、拆除順序嚴格按照從上往下,后搭先拆、先搭后拆的順序,拆除從內向外拆除,各種構配件嚴禁拋擲至地面。J、拆除作業(yè)必須由上而下逐層進行,嚴禁上下同時作業(yè)。絕對禁止未拆完內模豎向支撐即拆支架、未拆完翼緣板部分支撐支架即拆底腹板部位支撐支架,以防結構在體系轉換時產(chǎn)生破壞性荷載拉裂梁體。H、在貝雷梁底全寬掛好安全網(wǎng),避免施工過程中物體高處墜落,擊傷人員。G、如遇強風、雨等特殊氣候,不進行支架搭設或拆除作業(yè)。梯段旁邊也應設置一道扶手,作為臨時欄桿。D、在進行臨邊作業(yè)時,必須設置牢固可行的安全防護設施,不同的臨邊作業(yè)場所、需設置不同的防護設施。警戒區(qū)域內嚴禁非操作人員通行或在排架下方繼續(xù)組織施工。立柱的垂直度,按規(guī)定無論從何種角度測量,必須達到50mm以內,且總高度的偏差不得大于100mm。支架安全措施:A、必須嚴格按設計方案進行支架搭設,支架搭設所用鋼管上嚴禁打孔。六、安全及文明施工保證措施(一)安全保證措施為防止墜物傷人,在鋼管貝雷梁底部及側面張掛安全網(wǎng)、立警示牌,鋼管樁周邊布防撞設施;堅持施工隊伍的安全教育制度;項目安全員要經(jīng)常檢查作業(yè)隊,認真做好分部分項工程安全技術書面交底工作,詳細說明施工工藝流程、施工過程中應注意的安全事項及質量標準,交底人和被交底人雙方簽字。前7天必須灑水保持濕潤,經(jīng)常連續(xù)養(yǎng)護,并堅持時段經(jīng)常養(yǎng)護,后14天內做到間斷養(yǎng)生,使結構逐漸干燥??刂泼繉訚仓叨炔怀^30cm,既利于振搗密實,又加快熱量散失,避免產(chǎn)生溫度裂縫。提高混凝土的密實度,做到振搗工藝技術合理,采用插入式與附著式相結合的振搗方法。根據(jù)砂、石含水量及時調整施工配合比,盡量縮短澆筑時間。嚴格規(guī)定夏季箱梁預制澆筑時間,宜放在每天早晨6點前和下午5點以后。在養(yǎng)護期內,要嚴禁利用將橋面作為施工場地或堆放原材料。在混凝土澆筑完成后,應在初凝后盡快保養(yǎng),采用土工布或其他物品覆蓋混凝土表面,灑水養(yǎng)護,混凝土灑水養(yǎng)護的時間為7天,每次灑水以保持混凝土表面經(jīng)常處于濕潤狀態(tài)為度。澆筑時需注意在每室的1/4處留出人孔,待內模拆出后,室內建筑垃圾清理出后,經(jīng)監(jiān)理工程師同意后,補上鋼筋,用鐵絲吊住底板,補上人孔混凝土的澆筑。砼澆筑時,派專人負責檢查支架穩(wěn)定和模板的加固情況,并檢查是否有漏漿現(xiàn)象,并及時采取措施。澆注混凝土時,翼板腹板面盡量避免水泥漿濺在模板上,影響混凝土的質量和美觀。砼初凝后終凝前及時做拉毛處理,確保橋面鋪裝砼與梁面的結合面牢固。第二次澆筑的總體順序為由低處想該處縱向平行澆筑翼緣板及頂板。待砼初凝后,對腹板頂及橫梁頂進行拉毛作業(yè)?;炷翍竦交炷帘砻嫱V瓜鲁?,不冒氣泡,表面泛漿為止。插入式振動器不得振動鋼束錨墊板,不得碰撞模板鋼筋、振搗時不得損傷預應力管道等。每層澆注厚度不超過30cm,兩側腹板內下料要均衡,避免內模偏心受壓引起位移而導致腹板混凝土厚度不均,下層混凝土未振搗密實,嚴禁再下注混凝土。第一次澆筑砼的總體順序為:由低處向高處方向斜向分層澆筑振搗,澆筑順序按照先澆注底板再澆注腹板,澆注腹板時縱向分段、水平分層澆向另一端,逐孔進行。澆筑過程中底板腹板用插入式振搗器振搗,頂板部分采用平板式振搗器配合插入式振動器振搗,箱梁砼澆注前,必須進行全面檢查,經(jīng)自檢和監(jiān)理檢查確認后,方可進行澆筑?;炷寥肽Ec振搗混凝土澆筑前應對模板和預埋件進行認真檢查,清除模板內的雜物,并用清水對模板進行認真沖洗。混凝土的出盤溫度不得低于10℃,入模時溫度不得低于5℃。冬季攪拌混凝土時,骨料中不得帶有冰雪和凍結團塊?;炷劣砂韬险炯邪韬?,并準確控制水灰比及用水量,為提高混凝土強度及增加混凝土和易性,應摻入外加劑。為使保護層數(shù)據(jù)準確,箱梁施工底板采用高強砂漿墊塊,腹板墊塊采用塑料墊塊。(9)、鋼筋綁扎前由測量人員復測模板的平面位置及高程,其中高程包括按支架的計算撓度所設的預拱度,依據(jù)設計圖紙,經(jīng)測量無誤后方進行鋼筋綁扎。連接時必須符合焊接接頭的相關規(guī)定。(8)、箱梁鋼筋現(xiàn)場綁扎時,頂板、底板、腹板內有大量的預埋預應力管道,為了不使預應力波紋管損壞,一切焊接在波紋管埋置前進行,管道安裝后盡量不焊接,當普通鋼筋與波紋管位置發(fā)生矛盾時,適當移動鋼筋位置,確保預應力筋管道位置準確。(7)、梁鋼筋按設計圖紙在鋼筋加工棚內進行加工;縱向通長鋼筋采用搭接焊焊接,焊接接頭應符合JGJT272001《鋼筋焊接及驗收規(guī)程》的要求。按施工圖紙要求將鋼筋排列標記做好,以保證成型鋼筋綁扎規(guī)則、美觀。受壓區(qū)不限制。對于焊接接頭,在接頭長度區(qū)段內(35D且不小于500mm)同意根鋼筋不得有兩個接頭。對于綁扎接頭,接頭錯開布置。電焊時要根據(jù)鋼筋的材質選用相應的焊條,不得隨意濫用。構造鋼筋的連接可采用綁扎,綁扎長度不小于35d,且不小于300mm。(4)、通長受力主筋的連接采用搭接焊。鋼筋加工配料時,要準確計算鋼筋長度,減少斷頭廢料和焊接量。(2)、進場鋼筋應按照進行分類分規(guī)格存放,存放區(qū)要高于地面30cm,同時要覆蓋進行防雨防銹蝕。(1)、進場鋼筋應提供質量保證書或檢驗合格證,并按照規(guī)范要求進行原材料力學性能試驗,對直徑大于12mm的鋼筋要進行可焊性性能試驗。鋼筋加工形狀、尺寸應嚴格按設計圖紙執(zhí)行,標準彎鉤應嚴格執(zhí)行規(guī)范。所有排氣孔、壓漿孔、泄水孔的預埋管及橋面泄水管按設計圖紙固定到位,預埋件的預埋無遺漏且安裝牢固,位置準確。當砼強度達到設計強度的70%后,方可脫離外側模板和翼緣模板。由于每塊模板面板均為平面,沒有按照箱梁平曲線設置弧面,故安裝模板時,確保模板與模板之間留有15mm左右的間隙,以此來調出箱梁的平曲線(實際為若干折線)。首跨外側模板及翼緣模板安裝時,采用16t汽車吊起吊。為保證側模穩(wěn)固在箱梁主筋和腹箍筋上,設置一定數(shù)量的定位鋼筋。外側模板和翼緣模板為確保模板整體不向外滑移,翼緣模板下方的木枋與底板下方的橫向木枋連接在一起,如此一來,澆注砼時兩側腹板砼向外的脹力可以相互抵消。如果拆模時間過早,容易造成箱梁頂板砼下饒、開裂,粘模、甚至坍塌;如果拆模時間過晚,將增大了拆模難度,造成拆模時間長且容易損壞模板。箱梁內模支撐采用鋼管做橫支撐和豎支撐形成組合“?!弊峙偶?,立柱支撐在底模頂面上,,且每排均需設置縱、橫水平撐,以增加支架的整體穩(wěn)定性,防止內模脹模,內模支架的搭設原理及方式與滿堂腳手架的搭設原理及方式基本相同;立柱支撐點必須與橫橋向底模下的木枋位置對應,而且立柱不可直接支撐在底模頂,兩者間須墊設混凝土墊塊。為施工方便,內模分塊加工成幾種型號,并確保同一類型號的模板能夠互用;加工時,將面板和木枋通過鐵釘加工成整體。待預應力管道內凈漿強度達到設計強度的70%后,方可將底模板下的可調頂托下降,將木枋和底模拆除。竹膠板存放時板面不得與地面接觸,要下墊方木,邊角對齊堆放,保持通風良好,防止日曬雨淋,并定期檢查。在鋪設底模前先放置好支座,并在支座位置處根據(jù)梁底的楔塊尺寸在底模上開孔,在開孔處支立梁底楔塊的模板,楔塊的底模根據(jù)預埋鋼板的尺寸也開孔,預埋鋼板與楔塊的底模用高強砂漿密封。五、施工質量控制(一)、模板工程為保證現(xiàn)澆箱梁的外