n work, does not return prepaid deposit to Party a。 Party A delay to submitted the data and documents referred above in excess of the prescribed period within 15 days, Party B postpone deliver the design documents in according to the contract stipulation time. If the delay time more than 15 days, Party B has the right to determine a new submitted time for the design documents 甲方變更委托設(shè)計項目、規(guī)模、條件或因提交的資料錯誤,或所提資料作較大修改,以致造成乙方設(shè)計需返工時,雙方除需另行協(xié)商簽訂補充合同(或另訂合同)、重新明確有關(guān)條款外,甲方應(yīng)按乙方所耗工作量向乙方支付返工費。另外,甲方還應(yīng)提供關(guān)于場地條件的數(shù)據(jù),包括公用事業(yè)、地理條件、道路使用權(quán)、限制條件等。如甲方要求乙方對已同意的設(shè)計提供重大修改,或進行合同之外的設(shè)計工作,應(yīng)被視為額外服務(wù)項目,收費應(yīng)由甲乙雙方共同協(xié)定。: Construction drawing phase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business day after submitting the results: 施工期間現(xiàn)場配合階段:景觀工程竣工驗收后 個工作日,委托方支付費用為人民幣 元整,小寫 元(合同金額的 %)。: Preliminary design phase: the client shall pay RMB of design fee, ¥ : ( % of contract total amount) within business day after submitting the results: 方案擴初階段:提交成果后 個工作日內(nèi),委托方支付設(shè)計費人民幣 元整,小寫 元(合同金額的 %)。 This stage takes workdays第五章 設(shè)計費及支付方式Chapter5 Design fee and the payment method 本合同項目的設(shè)計費,總額為人民幣 ,小寫 元整。 After entered the construction phase of the project, Party B provide onsite service.: This stage of design work result include:a與施工方現(xiàn)場交底;a municate with construction contractor for the design intention.b現(xiàn)場效果控制;b Jobsite construction controlc材料封樣;c Sealed sample materialsd 植物主材選定。J Deliver eight sets design drawing 工作日。 This stage takes workdays:施工圖設(shè)計 The third phase : Construction drawing design 在擴初設(shè)計經(jīng)甲方認可后,乙方將進行施工圖的設(shè)計工作。 Designed according to Party A agreed scheme for preliminary design. This stage of design work result includea景觀初設(shè)總平面圖; a Preliminary landscape set general layoutb局部放大平面圖、剖面圖;b Local enlargement of the plan, section plan;c園林小品平、立、剖面圖;c Gardens sketch layout, elevation and section pland種植圖(主要樹種及載植方式);d The planting layout (Main tree species and cultivated methods)e豎向圖;e Vertical plan;f局部景觀立面圖及剖面圖;f Partial landscape elevations and section plang燈具及欄桿式樣;g Lamps and railing styleh提交A3圖冊三份。Party A shall submit the basic data and document on time, and responsible for its integrity, correct and timeliness 甲方應(yīng)于方案設(shè)計開始前提交的相關(guān)資料 The related data that Party A shall submit before the design Letter of authorization (彩色平面圖、1/500報批圖) General layout of planning (color floor plan, 1/500 drawing) Architectural effect drawing Illustrations of design layout Scheme for project The first floor layout of the building Vertical design drawing of the building The related data that Party A shall submit before the tentative design Scheme design confirmation letter The first floor layout of the building Architectural facade profile construction drawing Vertical design drawing Underground fl