【正文】
oct292022 Problem description: This month it was reported by the shipping lot in USA a problem of quality existed in the 805/830 vehicles. The problem is the poor adjustment in RR door panel. Projects statement: Find and improve the Red X that produce the poor adjustment in the RR door panel for the model 805/830 in Silao Assembly plant. Strategy: We initiated this project using the model to model strategy, because there was a good contrast and good leverage based on multivari see pag 6. Measurement system: As measurement system a Force gage was used. This measurement system passed the isoplot with DR=, DM= lbs, and DP= lbs (see page 4) Clue generation: Stage 1 shows that the Red X doesn’t live in the process. The stage 2 shows that the Red X lives in the door panel. The pair parison shows that the door molding is the part with the best contrast. Statistical confirmation: Once we detected the Red X candidate, I decided to do a B vs C six pack trial, in order to confirm the door molding is the influence to make the customer satisfaction. The six pack passed with 95% of confidence and end count of 6. Irreversible corrective action: To modified the flange mm in length to keep a better position and avoid that the door panel take out of position. Improvements: Reduce warranty cost to repair the door panel caused by poor fit (loose) and eliminate the condition in 100% in vehicles 805/830 models. The amount of money from jul 01 to jul 02 was 11, USD. Lessons learned: We learned that is necessary looking other alternatives using other strategy when is not possible invest money but always focus to guarantee the customer enthusiasm, therefore this project is an example of this. Executive Summary 執(zhí)行總結(jié) 項目題目 :右后門板調(diào)整不好 (805/830車型 )。問題定義樹是從 5a5b的基本方法。 dirty) 技術(shù) (快速 amp。 5a Is Engineering support required? 是否需要工程的支持 13 168。 3 168。 1 Correct Process? 正確的工藝流程 Rel. Engineer/ SQA/Supplier Parts Quality? 零件質(zhì)量 Production 168。R通知供應商: ? work with Supplier Quality to validate the corrections. ?同供應商共同確認糾正措施 ?set up sorting operations and production will support sorting of material at the operation. ?采取篩選措施,制造應支持在工位上的物料篩選 ? work with Group Leaders to validate countermeasures or containment. ?同工段長共同確認對策和遏制措施 If part variation within specification is the root cause, then the RE will: 如果確認零件在規(guī)范內(nèi),那么 RE應: ?work with the supplier and SQA to move the part back to the needed range within the specification ?同供應商共同工作, SQA將零件返回到規(guī)范內(nèi)需要的范圍 ?work with Quality Engineering to determine if an Engineering Change is required to provide irreversible corrective action ?同質(zhì)量工程師合作,確定是否需要工程更改這種不能消除的糾正措施 Stages 1amp。R’s to notify the supplier that there is a problem. 可靠性工程師確定零件是否更改過并對產(chǎn)品全部質(zhì)量負責。 2 Correct Tool? 正確的工具 Parts Quality? 零件質(zhì)量 168。 1 Rel. Engineer/ SQA/Supplier 168。 2 Correct Tool正確的工具 Can any of these cause the problem? 10 ? Is the Parts Routing current? ?零件的路徑是否正確 ? Are the correct part numbers identified on the material racks? ?是否在料架上標識有正確的零件號 ? Are parts stocked in correct location on the rack? ?在料架上擺放位置是否正確 ? Do the part numbers on the boxes agree with the rack? ?包裝盒上零件號與料架上是否一致 ? Are all pull cards available? ?拉動卡是否有效 ? Has a PAA been issued changing part usage? ?是否有零件用途改變的 PAA ? Has the PAA expired? ?PAA是否過期 ? Is error proofing needed? ?是否需要防錯措施 ? Is existing error proofing device working correctly? ? 是否已有的防錯設備運行正確 Stages 1amp。 3 Rel. Engineer/ SQA/Supplier 168。2 Production Corrects Production 168。 fixtures being used? (both shifts) ? 是否使用正確的工具 /夾具 (各班次 ) ? Are the tools set to the specified torque? ? 工具是否設置成規(guī)定的扭矩 ? Are they properly calibrated? ?是否進行適當?shù)男? ? Are both shifts using the same tool? ? 是否各班次用同樣的工具 ? Are the bits or sockets worn? ?是否螺絲刀或套筒已磨損 ? Has an extra air hose been attached to the tool? ? 是否在工具上有多余的空氣管 ? Is the tool tied to the Andon system? ?工具是否與暗燈相連 ? Has the tool been put on Bypass? ?是否工具被旁路 ? Do the tools amp。 3 Rel. Engineer/ SQA/Supplier 168。2 Production Corrects 正確的生產(chǎn) Production 168。 4 Correct Process? 正確的工藝過程 Correct Tool? 正確的工具 Correct Part? 正確的零件 Parts Quality? 零件的質(zhì)量 8 168。 2 Production 168。 1 Correct Process正確的過程 ? Are the correct Best People Practice sheets posted? ?是否有正確的操作指導文件? ? Are the Best People Practices being followed? ?是否執(zhí)行操作文件? ? Is the operators Key Point Chart being followed? ?是否滿足關(guān)鍵操作點控制圖 ? Are the correct documents posted on the operation certification board? ?是否在操作示板上有正確的文件 ? Is the job being performed to the PAD’s? ?是否按照 PAD操作 ? Can any of these cause the problem?以下的問題有可能產(chǎn)生問題嗎? Stages 1amp。 Engineering referral (Stage 3) occurs when the manufacturing process does meet design intent and the problem still exists. 當制造過程滿足設計內(nèi)容并且問題依然存在時,第 3步開始。 2 of the process are used to determine if the Production anization is running the assembly process to design intent. 2步是用來確定生產(chǎn)部門運行的裝配流程滿足設計內(nèi)容。 Reliability ?鉆石 14 生產(chǎn) amp。 6 Statistical Engineering (Red X Strategies) 統(tǒng)計工程 (紅 X方法 ) 168。 5a Is Engineering support required? 是否需要工程方面的支持 Problem Identified Begin Interrogation 問題定義 (開始調(diào)查 ) Responsibility 責任 QET PST (Lead) 168。 3 Rel. Engineer/ SQA/Supplier 負責的 SQDE工程師 /供應商 168。 1 Production 第二步 168。 1 7 Diamond Process 七顆鉆石流程 2 What is the 7 Diamond Process? 七顆鉆石的流程是什么? The 7 Diamond Process is one of many tools that can be used in the problem solving process. 七顆鉆石流程是可以用來解決質(zhì)量問題的工具之一。 This tool is used to investigate discrepancies discovered by the following: 它可以用來調(diào)查以下方面發(fā)現(xiàn)的差異 ? Gl