【正文】
員進(jìn)行施工。 Lift plan will be prepared in accordance with Sec. in Safe Work Specification Manual. Lift operation should consider whether the standing position of cranes and transportation vehicles will impact traffic safety based on site condition. ? 動火作業(yè)點(diǎn)設(shè)監(jiān)護(hù)人、配備消防器材、設(shè)置遮擋電焊弧光措施、周圍無易燃易爆物品。 All personnel participating will take appropriate safety training and properly wear PPE as minimum requirements as hard helmet, steel toe boots, safety glasses and coverall. Safety gloves, high visibility vest and facial shield will be required for specific works. ? 起重作業(yè)應(yīng)根據(jù)項(xiàng)目《安全工作規(guī)范手冊》第 條之規(guī)定,制定起重計劃。 Handle relevant PTW before work mence, such as general work permit, hot work permit, work permit for work in confined space, work permit for ray operation, excavation work permit, etc.. ? 不銹鋼焊 接時,應(yīng)做好預(yù)防六價鉻的呼吸道防護(hù)(若需要)。 See to attachment 1 for risk analysis. 站內(nèi)露空管道系統(tǒng)安裝方案 Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station 3 此方案中的所有單項(xiàng)工作都應(yīng)與承包商的單項(xiàng) JSA,風(fēng)險分析和每天開始工作前進(jìn)行的工具箱會議相符。 Effective construction drawings, specifications and CDB important design documents. ? 《 石油天然氣建設(shè)工程施工質(zhì)量驗(yàn)收規(guī)范 站內(nèi)工藝管道工程 》 ( SY42032020) Code for quality acceptance of oil and gas construction engineering Station procedure pipeline project ( SY42032020) ? 《石油天然氣站內(nèi)工藝管道工程施工及驗(yàn)收規(guī)范》 ( SY04022020) Standard for Construction and Acceptance of Oil and Natural Gas Station Procedure Pipeline Project SY04022020 ? 《石油天然氣站內(nèi)工藝管道工程施工規(guī)范》 ( GB505402020) Code for Construction of Pipe Process in Oil and Gas Transmission Pipeline Station ( GB505402020) ? 《高酸性氣田集輸站場及凈化裝置設(shè)備與管道安裝工程施工及驗(yàn)收規(guī)范》 QSY XN20202020 Code for Construction and Acceptance of Gathering Transportation Facilities, Purification Unit Equipments and Pipeline Installation of Highsour Gas Field Project QSY XN20202020 ? 《高酸性氣田集輸場站和凈化裝置工程質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》 QSY XN20202020 Standard for Quality Acceptance of Gathering Transportation Facilities and Purification Unit Engineering Project of Highsour Gas Field QSY XN20202020 ? 《給排水管道工程施工及驗(yàn)收規(guī)范》 ( GB502682020) Code for Construction and Acceptance of Water Supply Pipelines GB502682020 ? 《現(xiàn)場設(shè)備、工業(yè)管道焊接工程施工及驗(yàn)收規(guī)范》( GB5023698) Code for Construction and Acceptance of Field Equipment, Industrial Pipe Welding Engineering GB5023698. ? 《工業(yè)金屬管道工程施工及驗(yàn)收規(guī)范》( GB502352020) Code for Construction and Acceptance of Industrial Metallic Piping GB502352020. ? 《工業(yè)設(shè)備及管道絕熱工程施工規(guī)范》 ( GB501262020) Code for construction of industrial equipment and pipeline insulation engineering GB501262020 3. 健康、安全與環(huán)境 HEALTH, SAFETY amp。 The materials of exposed pipeline in well pads and stations of internal gathering system are as follows: A333Gr6, 316L, L245NB, 20, L360QS, L245NS, A671 CC65, 20GK and Q235?B + galvanization. The requirements for characteristics as well as cutting, welding and heat treatment of all kinds of materials see PQR for details. 2. 相關(guān)活動和方案 RELATED ACTIVITIES amp。 The method statement is applicable to prefabrication and installation of exposed pipeline in all well pads and gathering stations of Chuandongbei Highsulfur Gas Field Internal Gathering Project. Installation measures for underground pipelines see Construction Method Statement for Underground Pipeline in Well Pad and Gathering Station (CDB0000TECPLNSC20000008300) in details 內(nèi)輸工程各井站露空管道涉及以下材質(zhì): A333Gr 316L、 L245NB、 L360QS、 L245NS、 A671 CC6 20GK 、 Q235?B+鍍鋅。 ENVIRONMENT ................................................................................ 2 . 風(fēng)險評估 RISK ASSESSMENT................................................................................................................................... 2 . HSE 要求 HSE REQUIREMENTS.............................................................................................................................. 3 . 應(yīng)急救援 EMERGENCY RESPONSE ........................................................................................................................... 4 4. 培訓(xùn)和人員資質(zhì) TRAINING AND COMPETENCY OF PERSONNEL .............................................................. 4 5. 工藝 PROCESS............................................................................................................................................................... 5 . 施工準(zhǔn)備 PREPARATION FOR CONSTRUCTION .......................................................................................................... 5 . 流程 PROCESS FLOW ................................................................................................................................................ 5 . 材料檢查及驗(yàn)收 ACCEPTANCE INSPECTION OF CHECK ........................................................................................ 6 . 管段預(yù)制 PREFABRICATION...................................................................................................................................... 7 . 焊接 WELDING ........................................................................................................................................................ 10 . 不銹鋼 STAINLESS STEEL ....................................................................................................................................... 12 . 無損檢測 NONDESTRUCTIVE TEST (NDT) ............................................................................................................ 12 . 熱處理 HEAT TREATMENT ...................................................................................................................................... 13 . 現(xiàn)場組裝焊接 ASSEMBLY amp。 施工組織設(shè)計 /方案審查意見 Review Comments on Construction Organization Design/Method Statement 承包單位 Contractor: 四川石油天然氣建設(shè)工程有限責(zé)任公司( SPC) 監(jiān)理單位 Supervision Company: 四川華成油氣工程建設(shè)監(jiān)理有限公司( SPCS) 合同號 Contract No.: CW682719 編號 No.: CDB0000TECPLNSC20000010000 工程項(xiàng)目名稱 Engineering Project Name: 川東北高含硫氣田宣漢開縣區(qū)塊氣田工程內(nèi)部集輸工程 Internal Gathering System of Chuandongbei HighS