【正文】
關(guān)鍵詞: 滿堂支架 箱梁 荷載分析AbstractFull space Support for building, construction and bridge construction as a support tool, has been widely used in civil engineering and other fields. In the box girder construction, the capacity of the bridge bearing in the construction is very large. In order to support the security,economic of construction,the erection of the scaffold is necessary and reasonable , so the load of support is extremely important.Take the construction of Xiujiang River Bridge for example, this concrete continuous beam bridge construction with Full Space Support design. Choose to use science and technology economy, reasonable and safe method of stent support programs load analysis, stability checking and stent design of prepress identify the most unfavorable Full Support the forces, and check its stiffness and stability. Following checking the vertical and horizontal Ibeam39。其次分別驗(yàn)算縱向、橫向工字鋼的彎矩正應(yīng)力、支座剪應(yīng)力、撓度變形和剛度。本文以繡江大橋建設(shè)為例,對(duì)此混凝土連續(xù)梁橋采用滿堂