freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

erp培訓(xùn)教材(ppt60頁)-資料下載頁

2025-02-27 06:24本頁面
  

【正文】 eduled receipts are the future available inventory.MRPAMRPBMRPCMRPDMRP 彙總表安全時間與沖銷時間n 材料主檔的屬性q 提早收料n 材料表的屬性q 一筆父件的 POR產(chǎn)生多筆子件的 GRArrivalMarshalingToilet cleaningRefuelingCatering loadGarbage dumpMarshalingDepartureSimplified Aircraft Services 1 2 3 4 5 6 7 8 9 10 11 12A AB(Toilet cleaning)X YC(refueling)D(Catering load)E(Garbage dumping)EST LSTService Schedule服務(wù)業(yè)的特質(zhì)n 無庫存n 前置時間為零Item Master FileXA(qp=1)(ltos=1)YA(qp=1)(ltos=0)B(qp=2)(ltos=0)B(qp=2)(ltos=1)C(qp=1)(ltos=0)D(qp=3)(ltos=0)D(qp=3)(ltos=1)E(qp=1)(ltos=0)Bill Of Material (Service)BOM FileArrival/Departure Schedule(MPS)Remark: Aircraft is scheduled to arrive at the beginning of time 1, and depart at the beginning of time 12. The arrival and departure marshaling have to be on time 1 and 11, respectively. (unit=30min)Service Requirement PlanningXAService Requirement Planning YARemark: The aircraft departs at the beginning of period 12,so the marshaling has to be pleted in period 11.ABCService Requirement Planning ADService Requirement PlanningESummarized Service RequirementsCapacity/Load Balancingn The system schedules all the flights in MSS, then use MRP procedure to calculate all the services required. n The service requirements are scheduled by MRP at the latest start time (LST). The system also calculates the earliest start time (EST) schedule. n Schedules are then adjusted between EST and LST to balance the loading and capacity.演講完畢,謝謝觀看
點擊復(fù)制文檔內(nèi)容
醫(yī)療健康相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1