freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

辦公樓裝飾裝修工程施工合同中英文-資料下載頁(yè)

2024-11-12 22:41本頁(yè)面

【導(dǎo)讀】鑒于甲方擬對(duì)辦公樓進(jìn)行裝修裝飾,通過(guò)招投標(biāo)程序,將該工程授予乙方施工并完成;修管理辦法》及有關(guān)法律、法規(guī)規(guī)定履行本合同;本合同的工期自年月日開(kāi)工至年月日竣工。工程均沒(méi)有超出乙方資質(zhì)證書(shū)規(guī)定的范圍。乙方正式發(fā)票后30天內(nèi)按實(shí)際完成的工作量及投標(biāo)單價(jià)一次性結(jié)算支付全部工程款項(xiàng)。程預(yù)算書(shū),經(jīng)甲方審核確認(rèn)后,在相應(yīng)的工程進(jìn)度款付款時(shí)予以結(jié)算支付。

  

【正文】 his project adopts the lightweight steel joist gypsum board, its craft installation as follows: 石膏板質(zhì)脆、耐水性差、易損壞、易污染,修復(fù)亦比較困難,故應(yīng)合理安排土建裝修、水暖、電氣、通風(fēng)等工序,為保護(hù)成品創(chuàng)造條件。 Because of the gypsum board’s fragility, the bad waterproof , and easy to damage, apt to pollute, and also difficult to repair. We should arrange for the building construction to be fitted up rationally, hotwater heating, electric, ventilates process, create conditions for protecting the finished product. 工藝流程 The procedure 在結(jié)構(gòu)驗(yàn)收后進(jìn)行墻位放線 、 墻基(墊)施工 、 安裝沿地、沿頂龍骨 、 固定各種洞口及門(mén) 、 安裝一側(cè)石膏板 、 水電管穿線并經(jīng)驗(yàn)收后 、 安裝另一側(cè)石膏板 、 接縫處理 、 連接固定設(shè)備、電氣 、 墻面裝飾 、 踢腳線施工 。 Put the line for the wall after the structure is confirmedthe construction of wall baseinstall the ground joist structure and shed joist structure Fix various entrances cave and doors Install one side gypsum board The water and electricity pipe piercing through the line and 10 confirminginstall another side gysum boardthe joint workConnect fixed apparatus, electricthe decoration for wallConstruction for skirtings 龍骨安裝要點(diǎn) The key requirements for installing joist structure 應(yīng)按彈線位置固定沿地、沿頂龍骨及邊框龍骨,龍骨的邊線應(yīng)與彈線重合。龍骨的端部應(yīng)固定牢固,龍骨與基體的固定點(diǎn)間距就不大于 1m。 Should be fixed along the ground, along carrying joist and frame joist in the position of line according to playing, the sideline of joist should be with playing the line coincidently. The tip of joist should be fixed and firm, the intervals of fixing point of the joist and matrices are not greater than 1m 安裝豎向龍骨應(yīng)垂直,龍骨間距應(yīng)符合設(shè)計(jì)要求。 It should be vertical to install joist of verticality, the interval of joist should accord with the designing requirement. 安裝支撐龍骨時(shí),應(yīng)先將支撐卡安裝在豎向龍骨的開(kāi)口方向,卡距宜為 400600mm,距龍骨兩端的距離宜為 2025mm。 While installing and supporting joist, should support and block installing in the opening direction of joist of verticality first, the card distance should be 400600mm, the distance from both ends of joist should be 2025mm. 石膏板安裝 The installation of gypsum board: 安裝石膏板之前,應(yīng)檢查骨架牢固程度,應(yīng)對(duì)預(yù)埋墻中的管道、填充材料和有關(guān)附墻設(shè)備采取局部加強(qiáng)措施,進(jìn)行驗(yàn)收并辦理隱檢手續(xù),經(jīng)認(rèn)可后方可封板。 Before installing the gypsum board, we should check the firm intensity of joist structure, and should be to burying the pipeline in the wall, packing materials and enclosing the apparatus of the wall to take the part to strengthen the measure relevantly in advance, confirm and go through formalities of examining latently, only after that , can seal the board. 石膏板應(yīng)在無(wú)應(yīng)力狀態(tài)下安裝,不得強(qiáng)壓就位。安裝應(yīng)從中部向四周固定。 Gypsum board should be installed under no stress, can39。t suppress to take place. And installing should turn towards the middle part all around fixedly ,隔墻兩面的板橫向接縫也應(yīng)錯(cuò)開(kāi);墻兩面的接縫不能落在同一根龍骨上。凡實(shí)際上可采用石 膏板全長(zhǎng)的地方,應(yīng)避免有接縫,可將板固定好再并孔洞。 The gypsum board should stagger the seam, the horizontal seam of board in the two sides of partition wall should stagger too。 The seam of two sides of the wall can39。t be left on the same joist. All places where we can adopt total length of the gypsum board in fact, should avoid that there is seam, can fixed in order to bine and then hole board 安裝石膏板時(shí),板與周?chē)w應(yīng)松散地吻合,應(yīng)留有< 3mm 的槽口,先將 6mm 左右的嵌縫膏加注好再放板,擠壓嵌縫膏使其和鄰近表層緊緊接觸,然后按常規(guī)方式釘板。 While installing the gypsum board, the board and matrices around should be identical fluffily, should leave notch of 3mm, annotate, put board 6mm about filleting lotion, pinch filleting lotion 11 make their and near top layer keep in touch tightly again well first, then nail the board according to the regular way. 3 鋁合金吊頂安裝要點(diǎn) The key requirements for installing the ceiling 為了保證吊頂飾面的完整性和安裝可靠性,在確定龍骨位線時(shí),需要根據(jù)鋁合金板的尺寸規(guī)格,以及吊頂?shù)拿娣e尺寸來(lái)安排吊頂骨架的結(jié)構(gòu)尺寸。對(duì)鋁合金板飾面的尺寸布置要求是:板塊組合的圖案要完整,四周留邊時(shí),留邊的尺寸要對(duì)稱或均勻。 In order to guarantee to hang integrality of veneer and installation dependability, while confirming the location line of joist, need it according to the size specification of the aluminium alloy board And hang area size that carry to arrange for and hang the physical dimension of a joist structure The size to the board veneer of aluminium alloy is assigned the requirement: Ones that make up plate pattern is the intact, it stay all around when it stay size take it symmetrical or even. 鋁合金板與輕鋼龍骨骨架的安裝,主要采用吊鉤懸掛式或自攻螺釘固定式,也可采用銅絲扎結(jié)。 Aluminium alloy board and light steel joist installation of joist structure, mainly adopt the hanging type of clivers or specialize in the fixed type of tapping screws, can also adopt the copper wire to pitch and form 安裝時(shí)按照彈好的板塊安排布置線,從一個(gè)方向開(kāi)始依次安裝。并注意吊鉤先與龍骨連接固定,再鉤住板塊側(cè)邊的小孔。鋁合金板在安裝時(shí)應(yīng)輕拿輕放,保護(hù)板面不受碰傷或刮傷。用自攻螺釘固定時(shí),應(yīng)先 用手電鉆打出孔位后再上螺釘。 Install, according to play good plate arrange, assign line, begin to be installed from a direction sequentially. Notice the cliver connecting with joist first fixedly, and then hook the aperture by the side of plate .The aluminium alloy board should handle in installation with care, is not damaged or scratched the fender. While specializing in tapping screws and fixing, should have the screw after getting into and typing the location of hole with electric portable drill.
點(diǎn)擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1