【正文】
Premoval in cyclic activated sludge plants by redox controlled cycle operation. Water Sci Technol 35:215–224Keller J, Subramaniam K, Go168。sswein J, Greenfield PF (1997) Nutrient removal from industrial wastewater using single tank sequencing batch reactors. Water Sci Technol 35:137–144Metcalf, Eddy (1991) Wastewater engineering:treatment, disposal, reuse, 3rd edn. McGraw Hill, New York Pastorelli G, Canziani R, Pedrazzi L, Rozzi A (1999) Phosphorus and nitrogen removal in movingbed sequencing batch biofilm reactor.Water Sci Technol 40:169–176 Ramirez CN, Martinez SG (2000) Phosphorus uptake kinetics in a biofilm sequencing batch reactor. Bioprocess Eng 23:143–147SangIll L, JongHo P, KwangBaik K, Ben K (1997) Effect of fermented swine wastes on biological nutrient removal in sequencing batch reactors. Water Res 31:1807–1812Tasli R, Artan N, Orhon D (1997) The influence of different substrates on enhanced biological phosphorus removal in a sequencing batch reactor. Water Sci Technol 35:75–80Umble AK, Ketchum AL (1997) A strategy for coupling municipal wastewater treatment using the sequencing batch reactor with effluent nutrient recovery through aquaculture. Water Sci Technol 35:177–184Zuniga MAG, Martinez SG (1996) Biological phosphate and nitrogen removal in a biofilm sequencing batch reactor. Water Sci Technol 34:293–301F. Kargi, A. Uygur: Biological nutrient removal in sequencing batch reactor with different number of steps 6514 / 1