freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

a制造業(yè)新產(chǎn)品導(dǎo)入流程模板(編輯修改稿)

2024-12-23 17:29 本頁面
 

【文章內(nèi)容簡介】 heet weekly before each phase production such as beta build, pilot run and ramp up run. From 1 week before production period , need update material status daily in time 協(xié)調(diào)采購團(tuán)隊內(nèi)部,及時更新材料跟蹤表格中的采購部件狀態(tài)。頻率:每次試生產(chǎn)前為每周,在 試生產(chǎn)前一周起為每天。 Create Cost table for scrapped part and rework parts after ECN implementation, lead old revision parts rework or scrap issue. 在 ECN 執(zhí)行后為報廢和返工材料創(chuàng)建費(fèi)用表格,領(lǐng)導(dǎo)舊版本物料的返工和報廢事宜。 Check if there have zero cost material in system, make sure all cost are uploaded in system according to latest PO price or average PO price. 檢查系統(tǒng)中是否有零價格的物料,確保所有在系統(tǒng)中的價格和最后的訂單價格或平均價格一致。 Output Schedule? for all purchasing items for beta build/ pilot run and ramp up Weekly? Report for preparation Daily Report from 1 week ahead of each build? ? Updated Material tracking sheet regularly Cost table for scrapped and? reworked parts for ECN Completed cost BOM? 6. Sourcing amp。 Qualification Coordinator 部品認(rèn)證 /本地化協(xié)調(diào)人 Work with purchasing team and planning team to distinguish parts into ―can be localized ― or ― can not be localized‖ according to BOM? Develop localization plan for future 和采購與計劃一起識別 BOM中的元件是否可以本地化?制定本地化計劃。 Setup schedule for all sourcing items and submit it to NPI Project leader in time at project beginning. This schedule should include measurable goal. – sourcing plan, sample delivery/ approval plan. 在項(xiàng)目開始前為所有部品認(rèn)證 /本地化事宜設(shè)定計劃時間表,遞交報告給新產(chǎn)品領(lǐng)導(dǎo)人。這個計劃時間表應(yīng)當(dāng)包括可衡量的目標(biāo)—本地化計劃,樣品遞交和批準(zhǔn)計劃。 Submit weekly report to NPI Project Leader amp。 NPD planner before local weekly meeting on time during production preparation period, attend weekly meeting to discuss present status. Submit daily report to NPI Project Leader in time during each phase production such as beta build, pilot run and ramp up run. 在準(zhǔn)備階段,需要在每個本地周會前按時向新產(chǎn)品領(lǐng)導(dǎo)人和計劃員提 交進(jìn)展周報,參與周會時討論現(xiàn)在的狀態(tài)。在試生產(chǎn)期間需要提交每天的狀態(tài)報告。 Attend weekly meeting with Ramp。D side 出席與研發(fā)中心的周會 Monitor parts release status, push Ramp。D release all parts before pilot run. 監(jiān)控元件的發(fā)布狀態(tài),推動研發(fā)部門在正式試生產(chǎn)前發(fā)布所有的元件 Coordinate qualification team member to update sourcing items status in material tracking sheet weekly before each phase production such as beta build, pilot run and ramp up run. During production period, need update material status daily in time. 協(xié)調(diào)部品認(rèn)證 /本地化團(tuán)隊內(nèi)部,及時更新材料跟蹤表格中的本地化部件狀態(tài)。頻率:每次試生產(chǎn)前為每周,在試生產(chǎn)前一周起為每 天。 Coordinate qualification team member on parts verification with NPI manufacturing engineer during pilot run period. After verification, submit CTQ (critical dimension/items check list) for critical parts to Vendor Improvement department and Quality Assurance department. The check list is baseline of ining quality check for 1st batch raw material for ramp up. 協(xié)調(diào)部品認(rèn)證 /本地化團(tuán)隊內(nèi)部和新產(chǎn)品導(dǎo)入工程師一起在試生產(chǎn)期間確認(rèn)部品。在確認(rèn)后,向供應(yīng)商改善部門和品質(zhì)保證部門關(guān)鍵部品的關(guān)鍵尺寸 /條目檢查表。這個檢查表是爬坡生產(chǎn)原材料進(jìn)料檢驗(yàn)的依據(jù)。 Develop tooling plan 制定模具計劃 Output Sourcing? amp。 Localization Plan Weekly Report for preparation? Daily Report from 1 week ahead? of each build Updated Material tracking sheet? Critical dimension/items? check list for critical parts Tooling plan? 7. NPD Planner 新產(chǎn)品計劃員 Work with NPI Project Leader and NPD engineer to set each phase production plan during new product introduction period. 和新產(chǎn)品項(xiàng)目領(lǐng)導(dǎo)人 /新產(chǎn)品工程師一起制定每個試生產(chǎn)的計劃。 Release MRS to production line and warehouse before each phase in time during new product introduction period. 在每次試生產(chǎn)前 發(fā)放物料請求清單給生產(chǎn)線和倉庫 Modify items phantom attribute after alternative(Cell) BOM copy , If it is necessary 如有需要,在 cell BOM 復(fù)制后修改虛擬階屬性 NPD material planner is responsible to do and update material shortage report based on BOM 物料計劃負(fù)責(zé)制作物料需求表 , 供采購提供物料交貨狀態(tài) NPD material planner will follow up all ECO/ECN and update it into MRS or CBSR (Material tracking sheet) 物料計劃負(fù)責(zé)跟蹤所有的 ECO/ECN 的變化 ,并及時更新到物料需求表或缺料表 (物料跟蹤表 )中 Planner will be responsible to do system backflush set up before Pilot and mass production 計劃負(fù)責(zé) 系統(tǒng)的前期設(shè)定 ,以便生產(chǎn)線做 backflush Planner will be responsible to supply monthly demand based on munication with NPD corp’s planner 計劃負(fù)責(zé)提供成品需求計劃 ,以便采購備料 . Planner will arrange pilot run schedule based on manpower and material, will coordinate with MFG to finish pilot on time. 計劃根據(jù)生產(chǎn)線人力 ,物料情況安排試產(chǎn) , 并跟催生產(chǎn)的進(jìn)度 Output Primary? Material Tracking sheet ( or CBSR, Can build shortage Report for Ramp up) ? New product manufacturing plan for each build Updated Material tracking? sheet regarding parts and usage MRS ( Material Request Sheet )? Back? flush routing set up FG weekly and monthly demand? 8. Test Engineer 測試工程師 Discuss with Ramp。D and Corp test engineer to determine test fixture / BON (Bed of Nail) delivery plan. 與研發(fā)部門和總部的測試工程師一起制定測試設(shè)備 /測試工裝的到達(dá)計劃 Complete DFT (Design for testing) review with Ramp。D and Corp test engineer during alpha and beta build if it is necessary. 如果有需要,與研發(fā)部門和總部的測試工程師一起在 alpha 和 beta 制造時完成 DFT審核。 Estimate and improve test capacity 估計和改善測試生產(chǎn)能力 Set up test fixtures/BONs hardware before pilot run and assist Corp test engineers on test software development during pilot run. 在試生產(chǎn)之前安裝測試設(shè)備、針床等硬件設(shè)施,在試生產(chǎn)中輔助總部測試工程師制定和調(diào)試測試程序 Create Test WI before mass production (rump up). 在量產(chǎn)前創(chuàng)建測試操作指導(dǎo)書 Record Label information into label printing system 在標(biāo)簽打印系統(tǒng)中錄入新產(chǎn)品標(biāo)簽信息。 Work with Platform engineer amp。 repair technician to gather and analyse any problem during production. 和產(chǎn)品(平臺)工程師 /維修技術(shù)員一起收集和分析問題 Work with platform engineer, quality engineer and NPD manufacturing engineer to create DPU report according to quality plan in NPD DB. 和產(chǎn)品(平臺)工程師,質(zhì)量工程師,新產(chǎn)品導(dǎo)入工程師一起根 據(jù)質(zhì)量計劃創(chuàng)建 DPU報告。 The Microprocessor programming for new project. It including programmer set up and get firmware file from design engineer. 為新項(xiàng)目設(shè)定微處理器程序,包括編程
點(diǎn)擊復(fù)制文檔內(nèi)容
醫(yī)療健康相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1