freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

上海賽科石化90萬噸乙烯工程電氣施工技術(shù)導(dǎo)則(編輯修改稿)

2024-12-19 12:32 本頁面
 

【文章內(nèi)容簡介】 rk have been removed, and the site is clean. 五、 設(shè)備、材料開箱檢查 Openbox inspection for the equipment and the material 開箱檢查由采購單位牽頭,在倉庫或施工現(xiàn)場,進(jìn)行設(shè)備、材料開箱檢查。 The openbox inspection is anized by purchase department , the openbox inspection for the equipment and the material is performed at silo or construction site. 開箱前檢查設(shè)備、材料制造廠原封包裝是否完好。若不完好,應(yīng)照相保存損壞狀況,便于處理開箱檢查發(fā)現(xiàn)的問題。 Electric Construction Technical Guideline 電氣施工技術(shù)導(dǎo)則 PR00CIJEE0001 A00 Page 8 of 38 4/12/02 Before openbox inspection, check whether the original package from the manufacturer of the equipment and material is in good condition. If it is not in good condition, a photo of the damaged status should be taken and kept to make a convenience for handling the problems found during openbox inspection. 檢查制造廠的技術(shù)文件是否齊全(合格證、試驗報告、隨箱圖紙、說明書等),被檢品的型號規(guī)格是否與施工圖紙設(shè)計相符。 Check whether the technical documentations (certificate of conformity, test report, drawing and instruction manual etc.) are plete, whether the type and specification is in conformity to the design of the construction drawings. 按裝箱單,逐一清點主設(shè)備、材料、配件、備品、專用 工具等是否齊全。 Count one by one to check whether the main equipments, material, fittings, spare parts, special tools etc. are plete. 外觀檢查主要內(nèi)容有: The appearance checking consists of: ( 1) 各種瓷件是否有裂縫、破損等缺陷。 Whether the porcelain parts have defects such as cracks and damage etc. ( 2) 各充油設(shè)備、油位指示是否正常,有無滲漏現(xiàn)象。 Whether the oil filling equipment and oil level indication are normal, and whether they have seepage. ( 3) 設(shè)備框架有無變形和漆面受損。 Whether the equipment frames have deformation and damage on the painting coat. ( 4) 各操作機構(gòu)、電氣元件是否齊全,有 無銹蝕,受潮、破損,各零件的固定螺栓、銷子有無松動等缺陷。 Whether the operating mechanism and electrical element are plete, and whether they are affected with rust, damp and are damaged. Whether they have defects, for example, the set bolts and pins of ponent parts are loose and etc. 設(shè)備外觀檢查時只能發(fā)現(xiàn)設(shè)備存在的表面問題,安裝或電氣調(diào)試過程中陸續(xù)發(fā)現(xiàn)的問題應(yīng)隨時報告。 During the appearance checking, only the problems existing on the surface of the equipments can be found, the problems found gradually during the installation or electric missioning should be report at any moment. 開箱檢查應(yīng)有詳細(xì)記錄,參檢人員簽字。檢查發(fā)現(xiàn)的問題應(yīng)及時通過規(guī)定渠道解決。 A detailed record of the openbox inspection should be made, and also the signatures of the persons who take part in the inspection. The problems found during the inspection should be solved through specified ways and means in time. Electric Construction Technical Guideline 電氣施工技術(shù)導(dǎo)則 PR00CIJEE0001 A00 Page 9 of 38 4/12/02 設(shè)備開箱后應(yīng)及時搬運到室內(nèi)保管(戶外型設(shè)備除外),若暫需存放在室外的,必須有可靠的防雨措施,且時間應(yīng)盡可能縮短。 The equipments should be moved in room for storage (except the outdoor equipments). If it is required to store outdoors temporarily, a reliable rainproof measurement must be taken and the time should be shorten as less as possible. 設(shè)備開箱資料、記錄等由開箱牽頭部門保存,工程驗收后轉(zhuǎn)負(fù)責(zé)竣工的部門。施工中必需的可復(fù)印分發(fā)。 The department who anize the openbox inspection should keep the openbox documentation and record and handed over to the department who are responsible for the pletion of the project after checking and accepting the project. The documentation and record required during the construction may be copied and distributed. 10 、特殊情況時,安裝班組領(lǐng)取的部分未開箱設(shè)備,應(yīng)書面承諾在開箱后及時將回箱內(nèi)合格證等技術(shù)證明文件,交付上述保管部門。 In the special occasion, if the installation unit take the equipment without openbox inspection, they should promise in written form that they will hand over the technical certificating documentations such as a certificate of conformity in the box to above mentioned department in time after the box is opened. 六、 主要項目施工方法及技術(shù)質(zhì)量標(biāo)準(zhǔn) Construction plan and technical quality criteria of main project 電氣施工的基本原則是按圖施工,規(guī)范施工方法,統(tǒng)一施工技術(shù)質(zhì)量標(biāo)準(zhǔn)。施工中遇到問題需要修改圖紙,安裝單位應(yīng)提出,由 IPMT 電氣對口工程師(或監(jiān)理)協(xié)調(diào)解決。 The basic principle of the electric construction is to perform the construction according to the drawings, normalize the construction plan, and unify the standard of construction technical quality. If it is required to modify the drawings, which is caused by the problems met during the construction, the construction unit should present it to relative electric engineer from the IPMT (or supervisor) for solution. (一) 予埋施工 Embedding Construction 變電所基礎(chǔ)型鋼 Section steel of the foundation of transformer substation ( 1)為提高埋設(shè)精度,保證埋設(shè)質(zhì)量,電氣安裝人員應(yīng)提前參與變電所基礎(chǔ)型鋼予埋工作。 In order to enhance the embedded precision and guarantee the embedded quality, the electric personnel should join in the embedding construction for the section steel of the foundation of transformer substation in advance. ( 2)變電所柜、盤的基礎(chǔ)型鋼均采用槽鋼立放安裝(制造廠自帶的按說明書進(jìn)行),在土建做室內(nèi)地坪以前,將基礎(chǔ)型鋼焊接固定在土建的予埋鐵件上。 Electric Construction Technical Guideline 電氣施工技術(shù)導(dǎo)則 PR00CIJEE0001 A00 Page 10 of 38 4/12/02 The section steel for the foundation of cabi and panel in the transformer station are always installed upright with channel steel (according to the instruction manual supplied by the manufacturer). Before the civil work on the terrace indoors, the section steel of the foundation should be welded on the embedded iron part of the civil work. ( 3)埋設(shè)前須掌握室內(nèi)地坪的最終標(biāo)高。中置式高壓柜、變頻柜、低壓柜、繼保屏等的基礎(chǔ)型鋼高出室內(nèi)地坪 10mm 為宜,手車式高壓柜宜高出內(nèi)地坪 2 mm。 Before the embedding construction, the final level of the terrace indoors must be found. The section steel of the foundation for the middleplaced high voltage cabi, the frequency conversion cabi, low voltage cabi, relay protection panel and etc. should be 10 mm higher than the terrace indoors, and the handcart high voltage cabi could be 2 mm higher than the terrace indoors. ( 4)基礎(chǔ)型鋼應(yīng)邊安裝邊找水平,每米水平度偏差應(yīng)小于 1mm,全長水平度偏差應(yīng)小于 2mm。 The section steel should be leveled up during the installation. The level deviation per meter should be less than 1mm. And the level deviation of the whole l
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1