freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

通用汽車的生產(chǎn)管理(編輯修改稿)

2025-05-15 01:35 本頁面
 

【文章內(nèi)容簡介】 her documentation listed below.Run @ Rate 是要核實供應(yīng)商現(xiàn)行的生產(chǎn)過程之結(jié)果/成果是否達(dá)到顧客準(zhǔn)予其持續(xù)(制造)質(zhì)量要求(在PPAP中闡述) 及報價 工裝能力。并且還核實供應(yīng)商的實際過程是否按照在PPAP、GP-12和其他如下所述文件中的計劃實行。During the Run @ Rate , the following will be reviewed :documentation 。 the manufacturing process and results 。 part quality requirements and results 。 subsupplier requirements and Run @ Rate results and packaging .在 Run @ Rate 中,將檢查以下內(nèi)容:文件;制造過程及結(jié)果;零件質(zhì)量要求及結(jié)果;分供方要求; Run @ Rate 結(jié) 果和 包裝。A . Documentation 文件 At the time of the Run @ Rate , the following support documentation should be available for review : 在 Run @ Rate 過程中,下列支持文件應(yīng)備查: Available 是否具備 Y/N1 . PPAP package including PPAP 文件應(yīng)包括:1 a) process flow diagram 過程流程圖a b) process control plan , with reaction plan 具有反應(yīng)計劃的過程控制計劃b c) DFMEA/PFMEA設(shè)計/過程失效模式及后果分析c d) Master part (s) 標(biāo)樣d2 . GP12 (Prelaunch Control )plan GP12 (試生產(chǎn)控制)計劃23 . Tool capacity information 工裝能力情況34 . Operator / inspection instruction 操作/檢驗指導(dǎo)書45 . Prototype/pilot concerns (PR/R扴) 樣件/試生產(chǎn)時發(fā)生的問題(PR/R)56 . Subcontractor control /capacity data 分供方控制/能力數(shù)據(jù)6 分供應(yīng)商材料(含零件)生產(chǎn)計劃及運(yùn)輸78 . Packaging/labeling plan 包裝/標(biāo)記計劃 89 . Acceleration plan 加速計劃 9 Note : All documentation must be plete and correct. 注 :所有文件都應(yīng)完備及 正確。B . MANUFACTURING PROCESS ACTUAL TO PLAN 制造過程--實際相對于計劃 1 . Is the product being manufactured at the production site using the production tooling ,gaging, process, material, operators, environment, and process settings? 該產(chǎn)品是否在生產(chǎn)現(xiàn)場用正式生產(chǎn)工裝、測量系統(tǒng)、過程、材料、操作人員、環(huán)境和過程設(shè)定進(jìn)行 生產(chǎn) ? Yes No Comments(備注): 2 . Does the actual process flow agree with diagram, as documented in PPAP ? (Review the facility plan and layout. Walk the process with the flow diagram. ) 實際生產(chǎn)流程是否與PPAP 文件中的流程圖相同?(檢查設(shè)備計劃和場地平面圖。按流程圖 檢查 實際流程) Yes No Comments(備注): 3 . Are operator instruction /visual controls available and adhered to at each work station ? 操作指導(dǎo)書/目視控制是否具備并附于相應(yīng)的每個工作崗位? Yes No Comments(備 注): 4 . Is all inprocess documentation, such as process control charts, in place at the time of the Run @ Rate ? Is the documentation utilized to drive a defined reaction plan and correction action process? 在進(jìn)行 Run @ Rate 時,是否所有過程文件都在工位上?如過程控制計劃。這些文件是否用于實施規(guī) 定 的反應(yīng)計劃和糾正措施? Yes No Comments(備注): 5 . When required , are production boundary sample available at required work station ? Are boundary samples approved by SGM? 當(dāng)需要時,在需要的工位上是否擁有邊際樣品?這些樣品是否經(jīng)上海通用認(rèn)可? Yes No Comments(備注): 6 . Are maintenance plans in place? Are repair and maintenance parts available ? Is there planed downtime for preventative maintenance ? 是否具備保養(yǎng)計劃? 是否有用于維修和保養(yǎng)的備件? 是否有進(jìn)行預(yù)防性維修保養(yǎng)的停機(jī)計劃? Yes No Comments(備注): Note : All of the preceding requirements must be met to pass Run @ Rate. 注:上述所有要求都須合格才能通過 Run @ Rate。C. MANUFACTURING CAPACITY RESULTS 制造能力結(jié)果 The following will be verified while the process is running 在進(jìn)行生產(chǎn)時, 要核實以下內(nèi)容。 1. Can net output from each operation support quoted capacit
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1