【文章內(nèi)容簡介】
...................... 73 專項安全管理 ............................................................................................... 74 勞務用工管理 ......................................................................................... 74 安全防護管理 ......................................................................................... 74 臨時用電管理 ......................................................................................... 76 施工機械管理 ......................................................................................... 77 消防保衛(wèi)管理 ............................................................................................... 78 西南大學本科畢業(yè) (設(shè)計)論文 5 9 環(huán)境保護 與文明施工管理 .................................................................................. 79 環(huán)境保護管理 ............................................................................................... 79 環(huán)境管理目標 ........................................................................................ 79 環(huán)境管理體系 ........................................................................................ 79 環(huán)境管理因素 ........................................................................................ 79 環(huán)境管理措施 ........................................................................................ 80 文明施工管理 ............................................................................................... 82 文明施工管理目標 ................................................................................. 82 建立管理制度 ......................................................................................... 82 現(xiàn)場管理 措施 ......................................................................................... 83 參考文獻 .................................................................................................................. 84 致 謝 ...................................................................................................................... 85 西南大學本科畢業(yè)(設(shè)計)論文 I 奧園 A 區(qū) 12樓施工組織設(shè)計 西南大學工程技術(shù)學院,重慶 400716 摘要:本施工設(shè)計是針對奧園 A 區(qū) 12樓進行編制的。奧園 A 區(qū) 12樓是高層花園式住宅樓,結(jié)構(gòu)類型為框架───減力墻結(jié)構(gòu)。該施工組織設(shè)計作為規(guī)劃和指導該工程施工準備到施工驗收整個過程的綜合性技術(shù)經(jīng)濟文件。在編制時,對工程質(zhì)量目標、工期目標、項目管理機構(gòu)設(shè)置、施工進度計劃、施工機械、周轉(zhuǎn)材料及設(shè)備、主要施工方法、勞務組織、安全文明施工、環(huán)境保護等諸多因素做了充分考慮;并以國家有關(guān)技術(shù)政策、規(guī)定、業(yè)主的要求、設(shè)計圖紙、招標文件、施工現(xiàn)場相關(guān)資料為依據(jù);嚴格按照施工組織設(shè)計的編制原則,從施工全局出發(fā),結(jié)合工程的實際情況,利用科學的組織管理方法,合理的組織安排各項資源,以期達到消耗少、工期短、質(zhì)量高,造價 低的最優(yōu)效果。 關(guān)鍵詞: 施工組織; 組織管理;質(zhì)量保證;施工方案 西南大學本科畢業(yè)(設(shè)計)論文 II Austrian Park Area A 12 floor construction design LIU Yan College of Engineering and Technology, Southwest University, Chongqing 400716, China Abstract: The construction design is against Austrian Park Area A 12 for the preparation of the floor. Austrian Park Area A is the top floor, 12 gardenlike residential buildings, structural framework for the type ─ ─ ─ by the wall of the structure. The construction design as a guide the planning and preparation for the construction of acceptance to the whole process of prehensive technical and economic documents. In preparation, the quality of the project objectives, period goals, project management institutions, the construction schedule, construction machinery, equipment and material flow, the main method of construction, labor anizations, safe and civilized construction, environmental protection and many other factors made full consideration。 And to the relevant national technology policy, regulations, the owners of the requirements, design drawings, tender documents, related to the construction site are based on information。 In strict accordance with the construction of the principle, anizational design, construction from the overall interests, works with the actual situation, the use of scientific methods of anization and management, rational anization of the resources to meet the consumption of small, short construction period, highquality, low cost of the most Excellent results. Key Words: construction anization。 anization and management, quality assurance, construction programme 西南大學本科畢業(yè)(設(shè)計)論文 1 文獻綜述 施工組織設(shè)計是指針對擬建的工程項目,在開工前針對工程本身特點和工地具體情況,按照工程的要求,對所需的施工勞動力、施工材料、施工機具和施工臨時設(shè)施,經(jīng)過科學計算、精心對比及合理的安排后編制出的一套在時間和空間上進行合理施工的戰(zhàn)略部署文件。通常由一份施工組織設(shè)計說明書、 一張工程計劃進度表、一套施工現(xiàn)場平面布置圖及工程進度圖組成。施工組織設(shè)計是工程施工的組織方案,是指導施工準備和組織施工的全面性技術(shù)經(jīng)濟文件,是現(xiàn)場施工的指導性文件。由于建筑產(chǎn)品的多樣性,每項工程都必須單獨編制施工組織設(shè)計,施工組織設(shè)計經(jīng)審批通過后方可施工。 在組織施工或編制施工組織設(shè)計時,應根據(jù)建筑施工的特點和以往積累的經(jīng)驗,遵循以下幾個原則。 認真貫徹基本建設(shè)工作中的各項有關(guān)方針、政策,嚴格執(zhí)行基本建設(shè)程序和施工程序的要求。 嚴格遵守國家和合同規(guī)定的 工程竣工和交付使用的期限。 合理地安排施工程序。 在采用先進、適用的技術(shù)和經(jīng)濟合理的前提下,在多方案比較的基礎(chǔ)上,選擇最優(yōu)的施工方案。 組織流水施工,以保證施工連續(xù)地、均衡地、有節(jié)奏地進行。 恰當?shù)匕才哦?、雨季施工項目,增加全年的施工日?shù),提高施工的連續(xù)性和均衡性。 減少暫設(shè)工程和臨時性設(shè)施,合理布置施工平面圖,節(jié)約施工用地。 貫徹工廠預制和現(xiàn)場預制相結(jié)合的方針,擴大預制范圍,提高預制裝配程度。 充分利用機械設(shè)備并擴大機械化施工范圍和提高機械化程度,減輕勞動強度,提高勞動生產(chǎn)率。 制定技術(shù)、組織、質(zhì)量、安全、節(jié)約等保證措施,避免質(zhì)量和安全事故,降低工程成本,提高工程經(jīng)濟效益。 西南大學本科畢業(yè)(設(shè)計)論文 2 施工組織設(shè)計在每項建設(shè)工程中都具有重要的規(guī)劃作用、組織作用和指導作用 。施工組織設(shè)計是直接指導具體施工的,是施工單位實現(xiàn)既定的質(zhì)量目標、進度目標、效益目標的“特別規(guī)范”。施工組織設(shè)計應用于施工全過程,集技術(shù)、經(jīng)濟、管理和合同于一體,是一份全面的施工計劃和合同文件。 通過編制施工組織設(shè)計, 可以合理的確定各種臨時設(shè)施的數(shù)量、規(guī)模和用途;可以充分考慮施工中可能遇到的困難于障礙,主動調(diào)整施工中的薄弱環(huán)節(jié),事先予以解決或排除,從而提高施工的預見性,減少了盲目性,使管理者和生產(chǎn)者做到心中有數(shù),為實現(xiàn)建設(shè)目標提供技術(shù)保證。 具體表現(xiàn)在: 施工組織設(shè)計時擬建工程項目施工準備工作的一項重要內(nèi)容,同時又是指導各項施工準備工作的依據(jù); 可體現(xiàn)實現(xiàn)基本建設(shè)計劃和設(shè)計要求,可進一步驗證設(shè)計方案的合理性和可行性; 為擬建工程項目所確定的施工方案、施工進度和施工順序等,是指導開展緊湊、有序施工活動的技 術(shù)依據(jù); 所提出的擬建工程項目的各項資源需要量計劃,直接為物資組織供應工作提供數(shù)據(jù); 對現(xiàn)場所作的規(guī)劃和布置,為現(xiàn)場的文明施工創(chuàng)造了條件,并為現(xiàn)場平面管理提供了依據(jù); 對施工企業(yè)計劃起決定和控制作用。施工計劃是根據(jù)施工企業(yè)對建筑市場所進行科學預測和中標為結(jié)果,結(jié)合本專業(yè)的具體情況,制定出的企業(yè)不同時期應完成的生產(chǎn)計劃和各項技術(shù)經(jīng)濟指標。而施工組織設(shè)計是按具體的擬建工程項目開竣工時間編制的指導施工的文件。 內(nèi)容 (1)工程概括和工程特點的說明。 (2)施工總進度計劃和主要單位工程的進度計劃。 (3)總的施工部署和主要單位工程的施工方案。 (4)分年度的各種資源的總需要量計劃 (包括勞動力、原材料、加工構(gòu)件、施工機械、安裝設(shè)備等)。 西南大學本科畢業(yè)(設(shè)計)論文 3 (5)全場性施工準備工作計劃 (包括 “ 三通一平 ” 的準備,臨時設(shè)施施工的準備,原有道路、房屋、動力和加工廠條件的利用,機構(gòu)組織的設(shè)置等 )。 (6)施工總平面圖的設(shè)計 . (7)有關(guān)質(zhì)量、安全和降低成本等技術(shù)組織措施和技術(shù)經(jīng)濟指標。 (1)工程概況和工程特點分析 (包括工程的位置. 建筑面積,結(jié)構(gòu)型式、建筑持點及施工要求等 )。 (2)施工準備工作計劃 (包括進場條件、勞力、材料、機具竿的準備及使用計劃, “ 三通一平