freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

某家用電器公司0203生產(chǎn)件批準(zhǔn)控制程序(存儲(chǔ)版)

2025-07-17 08:57上一頁面

下一頁面
  

【正文】 求或設(shè)計(jì)要求的材料 /性能試驗(yàn)結(jié)果。 Change of test/inspection methods – application of new technologies (not affecting the acceptance principles). 顧客不要求通知的情況:本公司應(yīng)該跟蹤更改和 /或改進(jìn),并更新 PPAP 文件。 Only to bulk materials: The supplier has adopted a new process technology that was never used before. e. 第 章節(jié)要求的任一種情況。 Applicable to the main raw materials purchased by AICQ. 3 職責(zé) Responsibility 橫向協(xié)調(diào)項(xiàng)目組負(fù)責(zé)新品生產(chǎn)件批準(zhǔn)過程的實(shí)施和所需資料的準(zhǔn)備。 Applicable to all the products produced by AICQ. 適用于本公司采購的主要原物料。 Production part approval submission (PPAP): It refers to the submission of the parts and the relevant documents that are picked up during an effective production process to the customers for approval (this process must be of production from 1 to 8 hours, and the specified production quantity must reach at least 300 pieces of ponents during a continuous production, unless otherwise specified by customer authorized quality representative). And in addition, this production process is carried out by using the tools and processes available at the production site. For bulk materials, the parts have no quantity requirements. If it is required to submit samples, ensure the selected samples can represent the ―stable‖ production process. 生產(chǎn)件批準(zhǔn)提交時(shí)機(jī) Production Part Approval Submission Time 供方必須對(duì)下列情況獲得顧客產(chǎn)品批準(zhǔn)部門的完全批準(zhǔn): a. 一種新的零件或產(chǎn)品(如:從前未曾給某個(gè)顧客的某種零件、材料或顏色); A new part or product (. some kind of part, material or color never supplied to a customer before). b. 對(duì)以前提交零件不合格的糾正; Correction of nonconforming parts submitted before. c. 由于設(shè)計(jì)記錄、規(guī)范或材料方面的工程更改而發(fā)生的產(chǎn)品變化; Product change due to the engineering revision of design records, specifications and materials. d. 只對(duì)散裝材料:對(duì)于供方來講,在產(chǎn)品上采用了以前未曾用過的新的過程技術(shù)。 Changes of other parts excluding the DFMEA of approved products (product position, position grade). i. 試驗(yàn) /檢驗(yàn)方法的更改 新技術(shù)的采用(不影響接受準(zhǔn)則)。提交文件至少應(yīng)包含以下內(nèi)容,技術(shù)部可根據(jù)產(chǎn)品的特殊情況要求供應(yīng)商提交其他資料。 R=The supplier must ensure the easy availability at appropriate place, including the manufacturing space, as long as it is required by the customer representative. *=供方必須在適當(dāng)?shù)膱鏊4?,并在有要求時(shí)向顧客提交。 提供一般零部件供應(yīng)商按《 PPAP手冊》等級(jí) 5提交。 Stricter acceptable tolerance limit values for customers/sales. PPAP 保存 /提交要求 (見附件二) PPAP Retention/Submission Requirements (Appendix 2). PPAP 提交等級(jí) PPAP Submission Level 本公司必須按照顧客要求的等級(jí),提交該等級(jí)規(guī)定的項(xiàng)目和 /或記錄;如果顧客負(fù)責(zé)產(chǎn)品批準(zhǔn)部門沒有其他規(guī)定,則本公司必須使用 等級(jí) 3 作為默認(rèn)等級(jí),進(jìn)行提交。如果顧客放棄提交正式的生產(chǎn)件批準(zhǔn),但是橫向協(xié)調(diào)項(xiàng)目組仍應(yīng)進(jìn)行 PPAP 所有項(xiàng)目,以反映當(dāng)前有關(guān)過程的狀況: AICQ must notify any of the following design and process revisions to the customer product approval department. The customers might therefore decide to require the submission of PPAP approval. If the customers give up the submission of official product part approval, the Cross Function
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1