【正文】
80 70 6070605040302010 0Holder Speed Filling Wast95% PI95% CIRegressionThe holder searching mark speed is too fast. Action: Adjust electric board to reduce the speed. Tube Holder Speed Holder speed reduce from 120 to 60 rpm, the filling wastage reduced 15% Analyze XsBox plot D M A I C 1 2270280290processQty (kg)Mixing Yield vs RO water shortage(means are indicated by solid circles)Mean: Mean: kg RO water was short about 10 kg we added in mixing vessel. Reason: Actual RO water was lower than flow meter setting. The flow meter suit for 4 tons batch mixing, not suit for 300kg mixing Action: Weighing RO water before adding in mixing vessel RO Water Quantity Improvement Mixing yield increased 3% after RO water reach Spec. Analyze D M A I C 60504030202301500001400001300001202301100001000009000080000Observation NumberViscosity 11Mean=122448UCL=139353LCL=105544BeforeAfterViscosity Spec. 50,000 200,000 Viscosity is still within spec after RO water reaching process spec. Viscosity Comparison by RO water Change Two sample Test Dotplot D M A I C 21295290285YieldMixing Yield vs Bulk Remain in Vessel Lot of bulk was remained in mixing vessel after transfer chemical was remained in weighing bags. Reason: High viscosity of bulk and chemical. Action: ?Use special tools to scrap the bulk from the wall of vessel. ? Use metal bucket instead of plastic bag. Remained Bulk Chemical Reduction Mixing yield increased 2 % after using tool scrap the bulk from vessel Summary of Analysis D M A I C ? Operators skill are affected filling wastage ?When we decide use stainless steel to replace the small plastic bags, bulk wastage reduce 9%. ?Reducing the holder searching mark speed, filling yield also reducing ?RO water was short than specification in mixing as flowmeter is not suit for small batch of mixing process. Viscosity study shows bulk quality meet spec. ?Using special tools to scrap the bulk form vessel can be increase the output. Solution Prioritization Matrix Summary D M A II C Solution Easy Quick Tech. Hi Impact Customers Sum 4Weighing RO water Change cooling system Change temperature system 3 Change Vaccum system 2 4 Scrap the bulk from vessel Criterial and Weights FMEA Update D M A II C Date: Sept. 15, 2023 (Original)Project: Reduce wastage on tube line Team: Liquids of JJC Nov. 30, 2023 (Revised)Item orProcessStepPotientialFailureModePotentialEffect(s) ofFailure SeverityPotentialCause(s) OcccurrenceCurrentControl Detection RPNRemendedActionResponsibilityandTarget DateAfterActionTakenSeverity Occurrence Detection RPN1 Fail to Bulk viscosity 8 RO water 5 Using flow 7 20 Weighing Foreman 1 0 1 2Quality low than spec. high than spec meter RO water 10/20/20232 Fail to Material waste 6 Tube artwork 5 Holder 7 18 change speed Maintenance 2 0 2 4Cost eccentric speed 120rpm to 60 rpm 10/20/20233 Fail to Bacteial 8 Totes hard to 2 Store in 9 19 Store in stainless Foreman 3 0 2 5Quality increasing be clean bags steel totes 9/20/20234 Fail to Output low 5 Speed low 5 Holder 2 12 change speed Maintenance 1 0 1 2Cost speed 120rpm to 60 rpm 10/20/20235 Fail to Tube product 5 Temperature 5 Temperature 5 15 Set temperature Main. Sup. 1 0 1 2Cost unseal low no spec range 11/30/2023104 15FMEA AnalysisTotal Rsik Priority Number= After Risk Priority Number= Cause of Variation and Improve Focus Products Causes of Variation Process Fix 1) Operators skills Trained operators 2) Bulk stored