【正文】
m, with total reservoir capacity of billion cubic Ling(Peak Crock)Scenic SpotHere we are the top of the Dam area, the Tangzi Ling(Peak Crock),with a height of we can overlook the general of Three Gorges Project and Dam name is from its shape of upside down ’s said that in the ancient time, when Da Yu led people dredge the watercourse and fought against the flood, he was too involved to enter the door even when he passed his home third the help of magic bull, he excavated 200km order to thank his achievement, people sent him 24 pigs and a big crock of wine by the boat reached Sandouping(the Project site), they saw the magic bull going away on clouds and leaving its image in mountains, where was called the Bull Rock , Da Yu followed the bull, leaving a big rock for were deeply moved by what happened, and kept the boat waiting in the , the boat turned into an island, called Zhongbao pigs were down into the river turning into 24 that big wine crock was set in the left bank turning into now called Tanzi Model Hall of the Three Gorges Project 模型室On the Tanzi Ling, we first visit the Hall of the Project Model, where shows the whole mini construction of the there we can view real part of the Eternal Riverbed Rock, the Sill under the Dam and the Damming we climbed the peak top and overlook the overall appearance of the Three Gorges models lay out the plete project with a scale of 1: the largest one in the world, the Project with large installed capacity and huge engineering scope will bring out marked and integrated tops in the world, this project is not only for flood control but also giving great benefits to the later generations, showing great role in prehensive national strength increase of Project body consists of the main dam, generation stations and navigation concrete gravity main dam is about 2309 m in length and 185 m in the dam top width is 15 m, while the bottom one is 124 discharge dam is in the middle of the Main Dam, while power generation stations are in both 483meter discharge dam consists of 22 overflows and 23 deep overflows, functioning as flood discharge and sludge generation stations are in the both ends of the main generators are installed for left generation stations, while 12 for right 700 thousand kW capacity for each, the installed capacity will reach million kW and billion kW/h each year, which accounts for 1/9 of the nation total and is times of the Gezhouba project’s navigation buildings consist of twoway 5stage ship lock and ship ship lock is 6442 m in length and 300 m in width, with two way and 5 it is divided into 10 rooms, 280 m in length and 34 m in width for each, with minimum water depth of 5 m。第一篇:三峽大壩英語導(dǎo)游詞三峽大壩英語導(dǎo)游詞The Three Gorge DamDear friendsWele to ’m your tour guide in Yichang, my name is Wang Jing, you can call me Xiao ’m from Xiazhou International Travel , bring your belongings with you, and follow me to , let me introduce our driver, his name is Li Yao, you can call him Li Shifu, here is our itinerary for these you have some difficulties, please let me know, I would be very happy to help contact way is in must be very tired after a long are going to Taohualing Hotel and take a is our hotel, please give me your ID and I’ll help you to , here are your room cards and remember we’ll meet at the gate at 8:00 tomorrow morning, we will visit Three Gorges , good morning, You look better than collect your belongings and get on the , we ‘ll visit the Three Gorges may take you half an hour bus from the Yichang urban to the dam me tell you something about it, The Three Gorges Dam is the first 5Aclass tour sites in Yichang and has been listed as one of the first national demonstrations on industrial the world largest hydropower project, the Three Gorges Project is located at the Zhongbao Island near Sandouping in Yichang, and about 37 km away from the Gezhouba Hydropower project in the whole construction is pleted according to the plan of “first class development, plete construction, reservoir by stages, and continuous immigrants”.The total construction period lasted for 17 years including three first phase was from 1993 to 1997。the second phase was from 1998 to 2003。the fall between upstream and downstream is 113 m, suitable for 10 thousand tonnages it takes almost two and half hour to pass through the , the ship elevator is designed for fast navigation for medium and small ships below 3000 elevator container is about 120 m in length and 18 m in width, with minimum water depth of it only needs 3040 minutes for these ships to pass through the Riverbed Rock萬年江底石This is a riverbed ’s granite, with weight over 20 we call it the “Eternal Riverbed Rock”.Actually, it’s over billion years this rock, people get to know the very past of the Yangtze , on the rock, we can see some bore holes, which were left by the geologists and the hydropowers when investing the dam this rock was originally excavated from the footing groove of cofferdam[39。the leading character is a young lady together with a flowers and fruits symbolize the sweet love and the happy , the plant, animals, and fishes in the background are telling the environment of the Three figure of the Easter Pearl Tower, the Shanghai Port, and the buildings in the bund areas signify the contribution that this project will make for the region along the mid and the down stream of the , some other figures are also show in the picture like the fairies playing music, dance of the Ba People, the thousandhands Kwanyin, and with the figures in the front, the central embossment in the back is the legendary that the magic bull helped Da Yu excavate the both of the tow sides, there are the paintings of the gorges and the the gorges, there is an ancient picture showing the poor boatman, the boat trackers, and the people plunged into an abyss of misery, which tell you the worst living condition of the people in the ThreeGorges region in ancient tw