【正文】
regulations put our cost management concepts and methods referred to a new height. Our task now is to be modern and cost management in line with China39。s construction industry how to effectively control construction cost of the construction and management of an important ponent part. However,the current budget for the construction projects estimate budget,Super budget accounts for the super three is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost. As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage,the design and implementation phases. The socalled Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages,use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits. Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government。 河北農(nóng)業(yè)大學(xué) 本科畢業(yè)英文文獻(xiàn)翻譯題 目 Research on Construction Project Cost Control Management 學(xué) 院: 專業(yè)班級(jí): 學(xué) 號(hào): 學(xué)生姓名: 指導(dǎo)教師姓名: 指導(dǎo)教師職稱: 年 月 日 英文原文Engineering Cost Management and ControlEven under the WTO and China39。s accession to the world munity,China39。 Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority,and so on. With the historical process, after recovery, reform and development, formed a relatively plete budget estimate of quota management system. However, as the so