【正文】
鳴謝 55參考文獻(xiàn) 56附件1英文翻譯附件2圖紙附件3an interchange at i = +% of the uphill sections of interoperability within the ramp overpass, the bridge longitudinal, R = 3500m convex curve, and i = % downhillon. Plane at A = 170m left to ease the curve and A = 165 in the right partial transition curve. Span binations as follows: 4 * 25m +4 * 25m, a total of two copies. Bridge superstructure of prestressed box girder bridge width , fullbridge length of . The bridge across the Han large (Handan name) highway, cross Stake AK0 + = K7, +, angle is 80 186。關(guān)鍵詞:預(yù)應(yīng)力混凝土箱梁 鉆孔灌注樁基礎(chǔ) 施工組織設(shè)計(jì)abstractHandan to Daming (Jilu sector) the highway is an important part in the Handan City Planning three vertical and two horizontal part of the highway network have been included in the Hebei Province highway network planning. Route the main line is km in length, using a twoway sixlane expressway standard design of the design speed of 120 km / h. The same period in construction the Handan, Linzhang, Cheng39。下部結(jié)構(gòu)采用柱式墩,樁柱式、肋板式臺;基礎(chǔ)均為鉆孔灌注樁基礎(chǔ)。本橋上部采用現(xiàn)澆預(yù)應(yīng)力混凝土連續(xù)箱梁結(jié)構(gòu),單箱三室截面。本橋跨越邯大(邯鄲——大名)高速公路,交叉樁號為AK0+=K7+,交角為80 186??鐝浇M合為:4*25m+4*25m,共兩聯(lián)。AK0+,為互通內(nèi)匝道跨線橋,本橋縱面位于i=+%的上坡段,R=3500m凸曲線及i=%的下坡段上。同期建設(shè)邯鄲市區(qū)、臨漳、成安、廣平、魏縣、大名6條連接線,總長69公里。 畢業(yè)設(shè)計(jì)說明書高速公路匝道橋橋梁施工組織設(shè)計(jì)專 業(yè):)姓 名: 指導(dǎo)教師: 2012年5月25日摘要組成部分,已列入河北省高速公路網(wǎng)規(guī)劃。,采用雙向六車道高速公路標(biāo)準(zhǔn)建設(shè),設(shè)計(jì)設(shè)計(jì)時速為120公里/小時。項(xiàng)目總投資約78億元。平面位于A=170m的左偏緩和曲線和A=165的右偏緩和曲線內(nèi)。橋梁上部為現(xiàn)澆預(yù)應(yīng)力箱梁。凈空5m。梁高140cm,懸臂根部厚度45cm,腹板厚度50到80cm,頂板厚度25cm,底板厚度20cm。為了方便施工,箱梁兩側(cè)腹板采用相同高度且豎直設(shè)置,頂板和底板平行,通過橋面鋪裝、墩臺高度和支座墊石高度共同調(diào)整橫坡。an, Quangping, Weixian name 6 cable length of 69 kilometers. The total investment of billion yuan.AK0 + Bridge is located Cheng39。, clearance 5m.The Bridges of prestressed concrete continuous box girder structure, the cross section of singlebox three rooms. The beam height 140cm, boom length , cantilever the root of the thickness of 45cm, the web thickness of 50 to 80cm, roof thickness of 25cm, bottom plate thickness of column pier, piled rib plate sets。實(shí)習(xí)報告5匝道橋施工組織設(shè)計(jì) 0緒論,根據(jù)招標(biāo)文件,在認(rèn)真閱讀和充分理解設(shè)計(jì)意圖及對施工現(xiàn)場作詳細(xì)調(diào)查的基礎(chǔ)上,結(jié)合我單位的施工經(jīng)驗(yàn),以信守合同、確保工期和質(zhì)量、合理控制工程造價、優(yōu)質(zhì)高效文明施工為中提指導(dǎo)思想,編制本工程施工組織。1工程概況速公路工程項(xiàng)目路線走向:起點(diǎn)位于邯鄲市規(guī)劃中的京港澳高速邯鄲繞城東南環(huán)、途經(jīng)成安、廣平、魏縣、大名,終點(diǎn)與山東省在建青蘭高速公路相接,采用雙向車道高速公路標(biāo)準(zhǔn),設(shè)計(jì)車速120公里/小時。該項(xiàng)目的實(shí)施將形成山西、河北南部地區(qū)連接膠東半島的一條便捷出海通道,進(jìn)一步縮短了與青島港的運(yùn)營距離,有效提高區(qū)域高速路網(wǎng)的綜合運(yùn)輸能力及整體服務(wù)水平,對服務(wù)冀南裝備新城的發(fā)展,推動沿海地區(qū)特色農(nóng)業(yè)的規(guī)模化、產(chǎn)業(yè)化,加快落后地區(qū)脫貧致富具有十分重要的作用。段西起成安縣的武吉村西,經(jīng)南朗堡、王家莊、汪家營、北魚口、南魚口、后陽寺,終止于成安縣城南的后南陽村西。 位置AK0+,為互通內(nèi)匝道跨線橋,本橋縱面位于i=+%的上坡段,R=3500m凸曲線及i=%的下坡段上??鐝浇M合為:4*25m+4*25m,共兩聯(lián)。本橋跨越邯大(邯鄲——大名)高速公路,交叉樁號為AK0+=K7+,交角為80 186。 氣候條件本地屬典型的暖溫帶半濕潤大陸性季風(fēng)氣候,日照充足,雨熱同期,干冷同季,隨著四季的明顯交替,依次呈現(xiàn)春季干旱少雨,夏季炎熱多雨,秋季溫和涼爽,冬季寒冷干燥。1.3地質(zhì)情況路線主要位于華北平原地貌,地形起伏不大。表層粉土壓實(shí)性較差。2.橋上護(hù)欄按照曲線放樣設(shè)置。4.橋梁施工時應(yīng)注意各種預(yù)埋件的預(yù)埋。樁基混凝土灌注完成后應(yīng)按《公路橋涵施工技術(shù)規(guī)范》(JTJ 04l—2000)的具體要求進(jìn)行樁基檢測。7.樁基鋼筋可采用單、雙面焊或搭接焊,焊接須滿足相應(yīng)規(guī)范要求。對于樁基穿過巖溶時,在樁周溶洞應(yīng)用粘土或漿砌片 石進(jìn)行封堵,以免混凝土灌注時混凝土流失。其它有關(guān)施工工藝及質(zhì)量要求按《公路橋涵施工技術(shù)規(guī)范》(JTJ 041—2000)的規(guī)定辦理。與邯鄲市交通管理局簽訂的《建筑工程施工合同》(2)招標(biāo)文件招標(biāo)人提供的《邯大高速公路連接線S1標(biāo)段工程招標(biāo)文件》(3)施工設(shè)計(jì)文件中交遠(yuǎn)洲交通科技集團(tuán)有限公司提供的施工圖(4)設(shè)計(jì)規(guī)范及依據(jù):1.交通部部頒《公路工程技術(shù)標(biāo)準(zhǔn)》(JTG B012003)2.交通部部頒《公路橋涵設(shè)計(jì)通用規(guī)范》(JTG D602004)3.交通部部頒《公路鋼筋混凝土及預(yù)應(yīng)力混凝土橋涵設(shè)計(jì)規(guī)范》(JTG D622004)4.交通部部頒《公路圬工橋涵設(shè)計(jì)規(guī)范》(JTG D612005)5.交通部部頒《公路橋涵地基與基礎(chǔ)設(shè)計(jì)規(guī)范》(JTG D632007)6.交通部部頒《公路橋梁抗震設(shè)計(jì)細(xì)則》(JTG/T B02022008)7.交通部部頒《公路橋涵施工技術(shù)規(guī)范》(JTJ0412000) 編制原則安全第一的原則:本施工組織設(shè)計(jì)始終按照技術(shù)可靠、措施得力、確保安全的原則,在安全措施落實(shí)到位,確保萬無一失的前提下組織施工。確保質(zhì)量目標(biāo)創(chuàng)優(yōu)。 確保工期的原則:編制科學(xué)的、合理的、周密的施工方案,合理安排進(jìn)度,實(shí)行平面流水作業(yè)、交叉作業(yè),搞好工序銜接與穿插。 方案優(yōu)化的原則:科學(xué)組織,合理安排,優(yōu)化施工方案,在施工組織設(shè)計(jì)編制中,對橋梁、道路工程的關(guān)鍵工序進(jìn)行多種施工方案的綜合比選,在技術(shù)可行的前提下,擇用最佳施工方案。最優(yōu)化的合理配置資源。2.工期要求本工程中標(biāo)后,我單位保證在業(yè)主要求的時間內(nèi)進(jìn)場施工,并自開工報告發(fā)出之日起,確保在規(guī)定天數(shù)內(nèi)全部完成全橋施工任務(wù),同時無條件服從業(yè)主要求,保證滿足業(yè)主總體工期的要求。3.安全要求合同實(shí)施期間,確保既有道路和施工區(qū)域內(nèi)的道路暢通及運(yùn)輸安全,施工中堅(jiān)持“安全第一,預(yù)防為主”的方針,落實(shí)各項(xiàng)保證措施,杜絕因工亡人事故,避免重傷事故,‰以內(nèi),確保施工安全。4 結(jié)構(gòu)形式特點(diǎn)及工程難點(diǎn)(1) 結(jié)構(gòu)形式特點(diǎn):本設(shè)計(jì)采用搭支架現(xiàn)澆箱梁,支架應(yīng)根據(jù)橋跨結(jié)構(gòu)的特點(diǎn)進(jìn)行設(shè)計(jì)和驗(yàn)算,以保證有足夠的剛度(彈性變形3mm)、強(qiáng)度和穩(wěn)定性。(3)普通鋼筋:采用HPB235和HRB335鋼筋。(4)混凝土:上部結(jié)構(gòu)現(xiàn)澆箱梁采用C50混凝土,橋面鋪裝采用10cm厚的瀝青混凝土,調(diào)平層采用C50混凝土;防撞護(hù)欄采用C30混凝土。其質(zhì)量要求應(yīng)符合《公路橋涵施工技術(shù)規(guī)范》(JTJ0412000)的有關(guān)規(guī)定。錨具采用符合交通行業(yè)標(biāo)準(zhǔn)JT/T32911997《公路橋梁預(yù)應(yīng)力鋼絞線用錨具、聯(lián)接器規(guī)格系列》要求的產(chǎn)品,其中縱向預(yù)應(yīng)力錨具采用群錨1512。(6)拌制混凝土用的粗、細(xì)骨料及水的質(zhì)量應(yīng)符合《公路橋涵施工技術(shù)規(guī)范》的有關(guān)規(guī)定。(8)伸縮縫:根據(jù)高速公路的使用特點(diǎn)和平整度要求,橋梁采用80型、160型異型鋼伸縮裝置。本橋排水均設(shè)置直接排水,泄水管只設(shè)置在橫向低側(cè)。,預(yù)制梁安裝后,梁端不是鉛垂線,為保證橋臺處預(yù)制梁段與橋臺背墻前緣線間距能滿足伸縮縫的游間要求,橋臺背墻根據(jù)橋面縱坡進(jìn)行傾斜。)混凝土=單一構(gòu)件體積構(gòu)件數(shù)(單位:m3)表52 主要工程數(shù)量表下部構(gòu)造橋墩蓋梁材料直徑單位數(shù)量混凝土C30m3鋼筋HRB335Ф28KgФ25KgФ12KgHRB235Ф10Kg墩身混凝土C30m3C25m3鋼筋HRB335Ф28KgФ16KgHRB235Ф10KgФ8Kg砂礫墊層m3墩系梁混凝土C30m3鋼筋HRB335Ф22KgHRB235Ф10Kg樁系梁混凝土C25m3鋼筋HRB335Ф22KgHRB235Ф10Kg挖方土方m3188樁基礎(chǔ)混凝土C25m3鋼筋HRB335Ф28KgФ16KgHRB235Ф10Kg檢測管Ф57*KgФ70*Kg80*10mm鋼板Kg橋臺耳背墻牛腿混凝土C30m3鋼筋HRB335Ф20KgФ16Kg蓋梁混凝土C30m3鋼筋HRB335Ф25KgФ12KgHRB235Ф10Kg承臺混凝土C25m3D12帶肋鋼筋焊接網(wǎng)Kg鋼筋HRB335Ф25KgФ20KgФ16KgФ12KgHRB235Ф20KgФ12Kg挖方土方m3567樁基礎(chǔ)混凝土C25m3鋼筋HRB335Ф25KgHRB235Ф10Kg檢測管Ф57*KgФ70*Kg80*10mm鋼板Kg肋板混凝土C30m3鋼筋HRB335Ф22KgHRB235Ф10Kg上部構(gòu)造材料直徑單位數(shù)量現(xiàn)澆箱梁混凝土C50m3鋼絞線Kg鋼筋HRB335Ф25KgФ20KgФ16KgФ12KgHRB235Ф10Kg錨具M(jìn)1512個96波紋管Ф內(nèi)=90mmm橋面系及附屬構(gòu)造護(hù)欄混凝土C30m3鋼筋HRB335Ф20KgФ16KgФ12Kg伸縮縫混凝土C50聚丙烯纖維m3鋼筋HRB335Ф16KgHRB235Ф6Kg鋼板Kg伸縮縫D160型伸縮縫m/道D80型伸縮縫m/道現(xiàn)澆層橋面鋪裝混凝土C50防水m3瀝青混凝土m3D8冷軋帶肋鋼筋焊接網(wǎng)Kg防水層m2排水鑄鐵泄水管Kg/套PVC泄水管m支座支座墊石混凝土C30m3鋼筋HRB235Ф28KgФ10Kg支座GPZ(KZ)塊4/8GPZ(KZ)塊8/8/2鋼板Kg其他工程部位材料直徑單位數(shù)量橋頭搭板混凝土C30m3鋼筋HRB335Ф22KgФ16KgФ12Kg防撞島混凝土C30m3鋼筋HRB335Ф16KgHRB235Ф10Kg錐坡混凝土C25Kg挖方土方m3填方m3六棱塊體積C20