【正文】
量調(diào)節(jié)導(dǎo)輪左、右位置,以達(dá)到電極絲的垂直度,這種方法僅僅適用E型直升絲架。Coil holder adjustment線架調(diào)整Height regulation高度調(diào)整Please refer to table 2 or table 3見圖2或圖3Loosen the platen screw at the side and in the rear part of the coil holder, then rotate the elevation leadscrew to adjust the height of the upper coil holder in order to adapt to various thickness of the machining parts, finally tightly wrench the platen screw and positioning screw at the side and in the rear part. 擰松上懸臂側(cè)面與后面的壓板螺絲,然后轉(zhuǎn)動(dòng)升降絲杠來調(diào)節(jié)上懸臂的高度,以適應(yīng)加工零件的不同厚度,最后再擰緊側(cè)面與后面的壓板螺絲與定位螺絲。Diagram 5圖5Machine Tool Main Frame Hoisting Diagram機(jī)床主機(jī)吊運(yùn)圖Page 8第8頁KDirectional K向Diagram 6圖6The Conceptual Diagram to various “Kinetic Part Lubricating Positions” of the WorkTable工作臺(tái)各運(yùn)動(dòng)件潤(rùn)滑部件示意圖Diagram 7圖7Lubricant Oil of “Kinetic Wire Component”運(yùn)絲部件潤(rùn)滑油Table 2表2No.編號(hào)Lubricating Positions潤(rùn)滑部位Lubricating Mode潤(rùn)滑方式Oil 油類Adding Time加油期Points for Attention注意事項(xiàng)Table 6圖6A、BLeadScrew絲杠Oil Gun油槍30 Lubricant30機(jī)油Once a Week每周一次During the oil adding time, please shake the “Hand Wheel” at the same time so that the LeadScrew can make the roundtrip movements.加油時(shí)必須同時(shí)搖動(dòng)手輪使絲杠全程運(yùn)動(dòng)Table 6圖6C、D、E、FGuide Rail導(dǎo)軌Oil Gun油槍30 Lubricant30機(jī)油Once a Week每周一次During the oil adding time, please shake the hand wheel at the same time so that the guide rail can make the roundtrip movements.加油時(shí)必須同時(shí)搖動(dòng)手輪導(dǎo)軌全程運(yùn)動(dòng)Worktable gear工作臺(tái)齒輪Oil gun油槍30 lubricant30機(jī)油Once a week每周一次During the oil adding time, please shake the hand wheel at the same time so that the gear can rotate for several cycles.加油時(shí)必須同時(shí)搖動(dòng)手輪使齒輪轉(zhuǎn)幾圈Table 7圖7A、CBearing軸承Pressure oil gun壓力油槍2 calcium lubricating grease2鈣基潤(rùn)滑脂Once half a year半年一次Before oil change, please clean the Bearing and Base.換油前,將軸承及座清洗干凈Table 7圖7F、B、GGuide Rail導(dǎo)軌Oil Gun油槍30 Lubricant30機(jī)油Once a Week每周一次During oil adding period, please let the “Tool Carriage” make the roundtrip movements.加油時(shí),使拖板全行程移動(dòng)Table 7圖7DGear 齒輪Oil Gun油槍30 Lubricant30機(jī)油Once a Week每周一次Table 7圖7EGear Mounted Shaft齒輪安裝軸Oil Gun油槍30 Lubricant30機(jī)油Once a Week每周一次Table 7圖7HLeadScrew Pair絲杠副O(jiān)il Gun油槍30 Lubricant30機(jī)油Once a Week每周一次WirePositioning Wheel Bearing排絲輪軸承Pressure Oil Gun壓力油槍2 Calcium Lubricating Grease2鈣基潤(rùn)滑脂Once Half a Month半月一次During the oil change, please clean the “Guide Wheel Base.換油時(shí),將導(dǎo)輪座清洗干凈。The contents include the following:內(nèi)容有:The “Control Cabinet” should have more than ten minutes’ normal operation.控制柜必須正常工作十分鐘以上;It should have the normal operation for various parts of the “Motion Pair” in the Machine Tool.機(jī)床各部分運(yùn)動(dòng)副工作正常;No Error in “Pulse Mains” and “Machine Tool Running System Operation”脈沖電源與機(jī)床電器工作無失誤;It should have sensitive action of various “Stroke Switch Contacts”.各個(gè)行程開關(guān)觸點(diǎn)動(dòng)作靈敏;Smooth flow of the “Working Solution” in various “Inlet and Outlet Pipes” with normal pressure, the “Working Solution” should wrap “Molybdenum Wire”. 工作液各進(jìn)出管暢通無阻,壓力正常,工作液裹住鉬絲。 Machine Tool Running System” before online in order to correctly connect the Sockets with various Plugs.聯(lián)機(jī)前應(yīng)仔細(xì)閱讀機(jī)械與電器二部分使用說明書,使其各個(gè)插頭與插座,得以正確的聯(lián)接。機(jī)床應(yīng)與保護(hù)接地裝置可靠連接,以確保使用安全。機(jī)床初步安放后,應(yīng)拆去導(dǎo)軌兩端鎖緊塊,換上隨機(jī)帶的擋塊,然后用干凈煤油清洗絲杠副、導(dǎo)軌、導(dǎo)輪等重要傳動(dòng)件,要立即擦上清潔的HJ30機(jī)油以防生銹。5℃。5℃ to the operating environment temperature. 安裝環(huán)境應(yīng)清潔,無粉塵、無振動(dòng)源,無腐蝕氣體,無大功率電氣設(shè)備干擾。Machine Tool Installation機(jī)床安裝It should keep a clean, dustfree installation environment without vibrating source。鋼絲繩與機(jī)床接觸處要填放軟性物質(zhì),以免損傷外觀。注意起吊螺絲必須擰緊,其端面必須緊貼床身,否則螺絲根部容易折斷,造成不必要的事故。Page 6第6頁Machine tool handling and installation機(jī)床的搬運(yùn)和安裝Machine Tool Handling and Hoisting 機(jī)床的搬運(yùn)和吊裝Machine tool handling can be hoisted or use the lifttruck. Please refer to diagram 4 for outer packing box hoisting. If there is no packing box, please refer to diagram 5 with the utilization of double ends of machine tool body and four hoisting screws for lift. Please be noted that the hoisting screw should be tightly wrenched and the face tightly stuck to the body. Otherwise it easily breaks the screw root and causes the unnecessary accidents. As for the largesize machine tool above Dk7763, it should use the enough intensity hoisting bar. Soft materials should be filled between the wire rope and machine tool contact so that it will not damage the outer appearance. Unsmooth circumstances such as jolt, tilt, impact etc. should be avoided in the handling. 機(jī)床的搬運(yùn)可用吊裝,也可用鏟車。The Model Composition and Representative Meaning are in line with Standards JB/T7445 and 294.型號(hào)組成及代表意義依據(jù)標(biāo)準(zhǔn)JB/T744294。或60176。 Upper Limit Specifications and so on.G型——線架高度可調(diào)節(jié)且配以由公司專利的帶跟蹤噴液的大錐度切割裝置。Model G —— The “Coil Holder Height” can be regulated. It is also allocated with our patent “LargeTaper Cutting Device” with the “Tracking Hydrojet”. It is called “Large Taper Coil Holder”. It monly has 30176。 Taper Cutting Device. Therefore it is called “Adjustable SmallTaper Coil Holder”.F型——線架高度可調(diào)節(jié)且配以6176。Model E — Adjustable Coil Holder Height, therefore it is called “Adjustable Coil Holder”.E型——線架高度可調(diào)節(jié),稱可調(diào)線架。等各種規(guī)格,基本上能滿足用戶的各種需要,配上相應(yīng)的控制裝置能很容易地實(shí)現(xiàn)X、Y、U和V四軸聯(lián)動(dòng)。、30176。、12176。, 60176。, 15176。Tapered Type Coil Holder錐度式線架In fact, this Structure is the “Elevated Type” plus one “Taper Cutting Device”. The “Taper Device” produced by our pany has the multiple specifications such as 6176。目前已逐步被可調(diào)形線架所代替。Fixed Coil Holder固定線架The “Upper and Lower Coil Holders” of such structural “Coil holder” have been fixed above the “Upright Column”. It can not be adjusted. It has the advantages of the fine Rigidity and sound Machining Stability. But its max. shorting lies in the small cutting range which can not be regulated. Therefore it has limitations for the product machining. At present, it has been gradually replaced by the “