freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

擴(kuò)建工程項(xiàng)目總承包合同(參考版)

2025-05-20 13:17本頁(yè)面
  

【正文】 在 200 人/ 月范圍內(nèi),培訓(xùn)人員的工資,保險(xiǎn)和飛機(jī)票由雇主負(fù)責(zé),而培訓(xùn)人員國(guó)內(nèi)的住宿,交通和培訓(xùn)費(fèi)由承包商負(fù)責(zé)。 MAIN TECHNICAL AND ECONOMIC INDEXES AND ENGINEERING VOLUME主要技術(shù)經(jīng)濟(jì)指標(biāo)及工程量See table 41.表 4118 / 26Main Technical and Economic Indexes and Engineering Volume主要技術(shù)經(jīng)濟(jì)指標(biāo)及工程量 Table 41No 項(xiàng)目名稱 單位 數(shù)量 備注1 Occupied land area占地面積 m2 359,000Excluding: coke making plant, sintering plant未包括焦化、燒結(jié)2 Railway鐵路m Specified in technical design.技術(shù)設(shè)計(jì)指定3 Internal – plant roads廠內(nèi)道路m2 Specified in technical design技術(shù)設(shè)計(jì)指定Railway transport volume鐵路運(yùn)輸量t/a 1,718,100Among which: Transport in其中:運(yùn)入t/a 1,711,6004 Transport out 運(yùn)出t/a 6,500Road transport volume道路運(yùn)輸量t/a 1,578,848Among which: Transport in其中:運(yùn)進(jìn) t/a 725,9485 Transport out 運(yùn)出 t/a 852,900Road transport equipment道路運(yùn)輸工具20t Semihook truck20t 半掛車Set臺(tái)516t dump truck 16t 自卸汽車Set臺(tái)297t camion7t 載重汽車Set臺(tái) 17t automatic dump truck7t 自卸汽車Set臺(tái)865t camion 5t 載重汽車Set臺(tái) 2Railway transport equipment鐵路運(yùn)輸設(shè)備Diesel lootive內(nèi)燃機(jī)Set臺(tái) 5760t wagon with bottom opening60t 敞車Set臺(tái) 308 150t track scale150t 軌道衡 Set臺(tái) 119 / 26No 項(xiàng)目名稱 單位 數(shù)量 備注9 Level crossing平交路口 Place地 310 Bumper post for railway鐵路緩沖柱 Pcs件. 511 1/10 single track switch1/10 單開道岔 Group組Specified in technical design技術(shù)設(shè)計(jì)指定12 1/10 cross over1/10 交叉渡線 Group組 113 Volume of earthwork土方量 m3 498,35014 Retaining wall護(hù)岸 m 1,50015 Drainage ditch排水溝 m 4,40016 Manning人員配備 Man人 18220 / 265. EQUIPMENT LIST AND LIST OF CATEGORY OF CLASSA, B AND C EQUIPMENTS 設(shè)備清單和 A,B,C,等級(jí)設(shè)備目錄 EQUIPMENT LIST設(shè)備清單21 / 26EQUIPMENT LIST設(shè)備清單Single project: Transportation Equipment單一項(xiàng)目:運(yùn)輸設(shè)備Weight (t)重量No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Unit weight單位重量Total weight總重Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(jià)(人民幣)22 / 26No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Weight (t)重量Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(jià)(人民幣)Unit weight單位重量Total weight總重1 Electronic dynamic rail weighbridge準(zhǔn)軌電子動(dòng)態(tài)軌道衡GCS150, Max. capacity: 150t,Mix. Graduation: 20 or 50kg,Accuracy class: class IIIDimension of weighing platform:202213000mmGCS150 最大稱量 150t,最小分度 20 或 50kg,準(zhǔn)確度等級(jí) III 級(jí),秤臺(tái)尺寸20221300㎜Set臺(tái)12 Diesel lootive內(nèi)燃機(jī)JMY500 (800HP)規(guī)格 1000mmSet臺(tái)2 58823 / 26No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Weight (t)重量Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(jià)(人民幣)Unit weight單位重量Total weight總重CKO (800HP)規(guī)格 1435mmSet臺(tái)3 5903 60t wagon with bottom opening60t 敞車K18。本次設(shè)計(jì)不新增消防車及車庫(kù),由 TISCO 統(tǒng)一考慮。鐵路運(yùn)輸:5 輛內(nèi)燃機(jī)車,30 臺(tái) 60t 敞車。Roads for small cars and inaccessible for loadcarrying vehicles within workshops will be constructed by the Contractor. Roads for loadcarrying vehicles connecting plant workshops shall be constructed by the Employer. Roadway will be used for transportation of converter slag from Steel Making Shop.供小型車和廠內(nèi)禁止重車通行的道路由承包商負(fù)責(zé)修建,通往廠區(qū)供重車通行的道路由承包商負(fù)責(zé)修建。17 / 26Total transportation amount for 550m3 blast furnace and steelmaking with converter is 1107,248 tons yearly, among which, 254,348 tons transportin, 852,900 tons transportout. The other materials such as coal, granulated slag, mud for mud gun, river sand, scrap, ferroalloy material, bulk material, refractory material, blast furnace slag, garbage, etc, all of them are transported by road. 550m3 高爐和煉鋼轉(zhuǎn)爐總運(yùn)輸能力為年 1107,248 噸,其中,運(yùn)進(jìn)254,348 噸,運(yùn)出量為 852,900 噸,其他原料如:煤,水渣,炮泥,河沙,鐵合金,散料,耐火材料,爐渣。瓦斯灰從重力除塵器經(jīng)鐵路運(yùn)往燒結(jié)。The transportation amount for newly built 550 m3 blast furnace is 549,700 tons yearly, among which, hot metal is 543,200 tons yearly, gas dust is 6,500 tons yearly. Hot metal is transported from casthouse to converter for steelmaking or pig cast machine by railway. Gas dust is transported to sintering workshop from gravitation dust catcher by railway. 新建一座 500m3 高爐運(yùn)輸量為 萬噸/年,其中:鐵水運(yùn)輸量為 萬噸/年,瓦斯灰運(yùn)輸量為 萬噸/年。煤炭和焦炭將 100%由鐵路從廠外運(yùn)至原料場(chǎng)。 VERTICAL ARRANGEMENT AND REGIONAL WATER 16 / 26DRAINAGE SYSTEM豎向布置及區(qū)域排水According to the present terrain documents in electronic from submitted by TISCO, the volume of earthwork of current bid document is estimated about 498,350 m3 due to inplete information about current terrain.根據(jù) TISCO 提供電子版現(xiàn)狀地形資料,經(jīng)不完全統(tǒng)計(jì),本次標(biāo)書土方量估算約 498353m3The drainage system for rain water on the site will use the existing drainage system in the plant. The final plant drainage plan provided by TISCO will govern.使用現(xiàn)有雨排,雨排系統(tǒng)最終由 tisco 負(fù)責(zé)。General layout plan is to be decided during technical design review.技術(shù)設(shè)計(jì)評(píng)論決定總平面圖Main pipelines are arranged at the both sides of road, and the pipelines for gas, steam and oxygen are laid overhead. Trench for water pipe and cable is laid underground along with the both sides of the road.主管線布置在道路兩側(cè),煤氣,蒸汽和氧氣管道架空,水管和電纜溝布置在道路兩側(cè)的地下General layout features in pact arrangement, smooth process flow and convenience for transportation.總圖布置緊湊,工藝流程順,鐵路運(yùn)輸條件較好。鍋爐房和淡水增壓水泵站布置在焦?fàn)t的西北側(cè)。15 / 26The auxiliary facilities for steel making with converter include primary dedusting system, secondary dedusting system, electrical room, water system (including plex water pump station, suction well, cooling tower, chemical deoiling tank, cyclone well, deposition basin, water treatment shop, turbid wa
點(diǎn)擊復(fù)制文檔內(nèi)容
規(guī)章制度相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1