【正文】
rranged at the north side of coke oven.新建公用設(shè)施:空壓站布置在高爐與轉(zhuǎn)爐煉鋼車間之間。General layout plan is to be decided during technical design review.技術(shù)設(shè)計評論決定總平面圖Main pipelines are arranged at the both sides of road, and the pipelines for gas, steam and oxygen are laid overhead. Trench for water pipe and cable is laid underground along with the both sides of the road.主管線布置在道路兩側(cè),煤氣,蒸汽和氧氣管道架空,水管和電纜溝布置在道路兩側(cè)的地下General layout features in pact arrangement, smooth process flow and convenience for transportation.總圖布置緊湊,工藝流程順,鐵路運輸條件較好。煤炭和焦炭將 100%由鐵路從廠外運至原料場。瓦斯灰從重力除塵器經(jīng)鐵路運往燒結(jié)。Roads for small cars and inaccessible for loadcarrying vehicles within workshops will be constructed by the Contractor. Roads for loadcarrying vehicles connecting plant workshops shall be constructed by the Employer. Roadway will be used for transportation of converter slag from Steel Making Shop.供小型車和廠內(nèi)禁止重車通行的道路由承包商負責(zé)修建,通往廠區(qū)供重車通行的道路由承包商負責(zé)修建。本次設(shè)計不新增消防車及車庫,由 TISCO 統(tǒng)一考慮。在 200 人/ 月范圍內(nèi),培訓(xùn)人員的工資,保險和飛機票由雇主負責(zé),而培訓(xùn)人員國內(nèi)的住宿,交通和培訓(xùn)費由承包商負責(zé)。 MAIN TECHNICAL AND ECONOMIC INDEXES AND ENGINEERING VOLUME主要技術(shù)經(jīng)濟指標(biāo)及工程量See table 41.表 4118 / 26Main Technical and Economic Indexes and Engineering Volume主要技術(shù)經(jīng)濟指標(biāo)及工程量 Table 41No 項目名稱 單位 數(shù)量 備注1 Occupied land area占地面積 m2 359,000Excluding: coke making plant, sintering plant未包括焦化、燒結(jié)2 Railway鐵路m Specified in technical design.技術(shù)設(shè)計指定3 Internal – plant roads廠內(nèi)道路m2 Specified in technical design技術(shù)設(shè)計指定Railway transport volume鐵路運輸量t/a 1,718,100Among which: Transport in其中:運入t/a 1,711,6004 Transport out 運出t/a 6,500Road transport volume道路運輸量t/a 1,578,848Among which: Transport in其中:運進 t/a 725,9485 Transport out 運出 t/a 852,900Road transport equipment道路運輸工具20t Semihook truck20t 半掛車Set臺516t dump truck 16t 自卸汽車Set臺297t camion7t 載重汽車Set臺 17t automatic dump truck7t 自卸汽車Set臺865t camion 5t 載重汽車Set臺 2Railway transport equipment鐵路運輸設(shè)備Diesel lootive內(nèi)燃機Set臺 5760t wagon with bottom opening60t 敞車Set臺 308 150t track scale150t 軌道衡 Set臺 119 / 26No 項目名稱 單位 數(shù)量 備注9 Level crossing平交路口 Place地 310 Bumper post for railway鐵路緩沖柱 Pcs件. 511 1/10 single track switch1/10 單開道岔 Group組Specified in technical design技術(shù)設(shè)計指定12 1/10 cross over1/10 交叉渡線 Group組 113 Volume of earthwork土方量 m3 498,35014 Retaining wall護岸 m 1,50015 Drainage ditch排水溝 m 4,40016 Manning人員配備 Man人 18220 / 265. EQUIPMENT LIST AND LIST OF CATEGORY OF CLASSA, B AND C EQUIPMENTS 設(shè)備清單和 A,B,C,等級設(shè)備目錄 EQUIPMENT LIST設(shè)備清單21 / 26EQUIPMENT LIST設(shè)備清單Single project: Transportation Equipment單一項目:運輸設(shè)備Weight (t)重量No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Unit weight單位重量Total weight總重Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(人民幣)22 / 26No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Weight (t)重量Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(人民幣)Unit weight單位重量Total weight總重1 Electronic dynamic rail weighbridge準(zhǔn)軌電子動態(tài)軌道衡GCS150, Max. capacity: 150t,Mix. Graduation: 20 or 50kg,Accuracy class: class IIIDimension of weighing platform:202213000mmGCS150 最大稱量 150t,最小分度 20 或 50kg,準(zhǔn)確度等級 III 級,秤臺尺寸20221300㎜Set臺12 Diesel lootive內(nèi)燃機JMY500 (800HP)規(guī)格 1000mmSet臺2 58823 / 26No. Name of equipment設(shè)備名稱Technical specifications技術(shù)說明Unit單位Qty.數(shù)量Weight (t)重量Power(KW)功率Original producing place 原產(chǎn)地Unit price(RMB)單價(人民幣)Unit weight單位重量Total weight總重CKO (800HP)規(guī)格 1435mmSet臺3 5903 60t wagon with bottom opening60t 敞車K18。鐵路運輸:5 輛內(nèi)燃機車,30 臺 60t 敞車。17 / 26Total transportation amount for 550m3 blast furnace and steelmaking with converter is 1107,248 tons yearly, among which, 254,348 tons transportin, 852,900 tons transportout. The other materials such as coal, granulated slag, mud for mud gun, river sand, scrap, ferroalloy material, bulk material, refractory material, blast furnace slag, garbage, etc, all of them are transported by road. 550m3 高爐和煉鋼轉(zhuǎn)爐總運輸能力為年 1107,248 噸,其中,運進254,348 噸,運出量為 852,900 噸,其他原料如:煤,水渣,炮泥,河沙,鐵合金,散料,耐火材料,爐渣。The transportation amount for newly built 550 m3 blast furnace is 549,700 tons yearly, among which, hot metal is 543,200 tons yearly, gas dust is 6,500 tons yearly. Hot metal is transported from casthouse to converter for steelmaking or pig cast machine by railway. Gas dust is transported to sintering workshop from gravitation dust catcher by railway. 新建一座 500m3 高爐運輸量為 萬噸/年,其中:鐵水運輸量為 萬噸/年,瓦斯灰運輸量為 萬噸/年。 VERTICAL ARRANGEMENT AND REGIONAL WATER 16 / 26DRAINAGE SYSTEM豎向布置及區(qū)域排水According to the present terrain documents in electronic from submitted by TISCO, the volume of earthwork of current bid document is estimated about 498,350 m3 due to inplete information about current terrain.根據(jù) TISCO 提供電子版現(xiàn)狀地形資料,經(jīng)不完全統(tǒng)計,本次標(biāo)書土方量估算約 498353m3The drainage system for rain water on the site will use the existing drainage system in the plant. The final plant drainage plan provided by TISCO will govern.使用現(xiàn)有雨排,雨排系統(tǒng)最終由 tisco 負責(zé)。鍋爐房和淡水增壓水泵站布置在焦?fàn)t的西北側(cè)。Hot blast stove is located at the southwest of blast furnace, gravitation dust catcher, gas cleaning facility, blower station, dedusting system of casthouse, circulating water pump station and suction well, all of them are located at the southwe