【正文】
站,吸水井,冷卻塔,化學(xué)除油池,旋流井均布置在轉(zhuǎn)爐煉鋼車間的北側(cè);綜合水泵站,吸水井,冷卻塔,保險(xiǎn)水塔均布置在轉(zhuǎn)爐煉鋼車間的西側(cè);Newly constructed utilities: air pressed station is arranged at the place between blast furnace shop and steel making shop, newly constructed oxygen generating station is arranged in the vicinity area of steel making area, boiler house and fresh water boosting pump station are arranged at the north side of coke oven.新建公用設(shè)施:空壓站布置在高爐與轉(zhuǎn)爐煉鋼車間之間。Newly constructed coke oven and its utilities are located at the northeast 14 / 26of original coke oven, details refer to attached drawings.新建焦?fàn)t及輔助設(shè)施布置在原有焦?fàn)t的東北面。The main contents include the general layout, transportation, utilities and auxiliary facilities outside the main shops, such as fuel gas facilities, water supply and drainage facilities, power supply facilities, thermal power facilities, telemunication facilities etc.主要包括內(nèi)容:擴(kuò)建項(xiàng)目的總圖布置、鐵路運(yùn)輸、道路運(yùn)輸及主生產(chǎn)車間外的燃?xì)庠O(shè)施、給排水設(shè)施、供電設(shè)施、熱力設(shè)施、電信設(shè)施等公輔系統(tǒng)。 STEEL MAKING amp。 unloading, storing, evenly blending for concentrated fine ore, coal, lump ore, flux, fuels etc. and directly deliver qualified material, fuel used for sintering, coke making and iron making. All above mentioned ining materials should have qualified particle size and there will be no sizing facilities in the plant.原料車間設(shè)有原料堆場(chǎng)及混勻料場(chǎng)。 The Contractor will employ Vietnam Subcontractor to undertake the works of detailed geological survey and carry out the foundation treatment (Unit price and norm according to Vietnam construction standard). If the total Subcontract price plus the contractor’s management fee do not exceed the amount of 3,265,200 USD which is specified and assigned to such works under Contract, the Contractor will bear the responsibility。TECHNICAL ANNEXFOREPC CONTRACTOFTISCO SECOND STAGE EXPANSION PROJECT VIETNAMTISCO 二期擴(kuò)建工程項(xiàng)目總承包(EPC )合同技術(shù)附件TECHNICAL ANNEX (VIII)(GENERAL LAYOUT AND TRANSPORTATION, ROADS, 2 / 26RAILWAYS, ALL KINDS OF PIPING NETWORK FOR TISCO’S SECOND STAGE REVANPING AND EXPANSION PROJECT)TISCO 二期擴(kuò)建工程之總圖運(yùn)輸,公路,鐵路,各種管網(wǎng)CONTENTS INDEX附件目錄1. GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT( EPC) TISCO 二期擴(kuò)建工程概述2. WORKING SCOPE OF CONTRACTOR 承包商工作范圍3. ADOPTED STANDARDS AND CODES FOR THE PROJECT 項(xiàng)目規(guī)范和標(biāo)準(zhǔn)4. DESCRIPTION OF GENERAL LAYOUT, TRANSPORTATION, ROADWAY, RAILWAY AND PIPELINE WORKS OF THE WHOLE PLAN (STAGE II)全廠 TISCO 二期擴(kuò)建工程之總圖運(yùn)輸,公路,鐵路,各種管網(wǎng)的概述5. EQUIPMENT LIST AND GENERAL LAYOUT ARRANGEMENT3 / 26設(shè)備清單與布置圖6. SOLUTIONS FOR IMPLEMENTATION ARRANGEMENT 進(jìn)度計(jì)劃4 / 261. GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT (EPC) TISCO 二期擴(kuò)建工程概述2. According to the requirements of sold bidding document 01EPC, dated on March. 10, 2022, for the second stage revamping and expansion project of TISCO, the long process of steel making production line with capacity of 500,000t/a casting billet will be newly built up in the main plant areas of LUU XA. 3. 根據(jù)在 2022 年 3 月 10 日賣出的 01EPC—TISO 二期擴(kuò)建項(xiàng)目投標(biāo)文件的要求,在 LUU 的鋼鐵冶煉長(zhǎng)流程工程。 EPC project construction schedule.7 / 26EPC 實(shí)施進(jìn)度計(jì)劃表 CONTRACTOR’S SERVICE CONTENTS AND SCHEDULE承包商提供的技術(shù)服務(wù)的內(nèi)容及時(shí)間The Contractor shall provide the site geological survey report, technical design, shop drawing design, equipment purchasing, equipment supply, construction for plant building, equipment foundation as well as piping work, equipment installation, staff training, test run and trial production for main production lines, start up of the production, acceptance test and hand over. 承包商根據(jù)各分標(biāo)段的項(xiàng)目實(shí)施進(jìn)度表,分別提供場(chǎng)地的地質(zhì)勘探;工程的基本設(shè)計(jì)、設(shè)備采購(gòu)、供貨;廠房、設(shè)備基礎(chǔ)、管網(wǎng)的施工;設(shè)備的安裝、調(diào)試;人員培訓(xùn);各主生產(chǎn)線的試車、試生產(chǎn);投產(chǎn);驗(yàn)收交付。 facilities),.TISCO 二期擴(kuò)建工程 EPC 合同 技術(shù)附件Ⅷ(廠區(qū)二期總圖運(yùn)輸、道路、鐵路及設(shè)施工程). 9 / 262. WORKING SCOPE OF CONTRACTOR承包商工作范圍According to the contents of 01 EPC package, the work scope of contractor is as the follows:按照 01 EPC 合同內(nèi)容,承包商工作范圍如下: NEWLY CONSTRUCTED RAW FMATERIAL YARD 新建原料場(chǎng) Raw material yard is posed of a raw material piling yard and a material evenly blending yard, utility and auxiliary facilities, which undertakes the plex jobs such as materials receiving amp。年產(chǎn)鐵水 580,000t/a。 the water sources for the project will be supplied by existing 70,000 m3 reservoir and water supply boosting station will be newly built. 二期擴(kuò)建工程的供電系統(tǒng) 110kv 總變電站由 TISCO 負(fù)責(zé)承建,提供電源;擴(kuò)建工程的水源是利用 TISCO 現(xiàn)有 70,000 m3 蓄水池的水源并新建供水站。原料場(chǎng)內(nèi)設(shè)有混勻料場(chǎng),礦、煤堆場(chǎng),火車等地下受料倉,詳見附圖。Newly constructed steel making shop is vertically arranged at the place between original highspeed wirerod workshop and original scrap shop. The steel making shop of converter includes slag bay, material charging bay, molten steel receiving bay, continuous casting bay, steel billets discharging bay.新建轉(zhuǎn)爐煉鋼車間垂直布置在原有高線軋鋼車間與原有廢鋼車間之間,轉(zhuǎn)爐煉鋼車間包括:爐渣跨,加料跨,鋼水接受跨,連鑄跨,出坯跨。 TRANSPORTATION運(yùn)輸 Railway鐵路Total transportation amount of newly constructed raw material yard is million tons yearly, among which, 50% of concentrated fine ore, lump ore will be transported by railway and the remained 50% of which will be transported through road. Coal and coke will be transported 100% by railway from outside to the raw materials yard. Newly built railroad system shall be P50. Material yard will be provided with new railway (two lines) to enable turnaround of empty wagons.新建原料場(chǎng)堆的總運(yùn)輸量為每年 164 萬噸, 50%的精礦粉和礦石用鐵路運(yùn)輸,其余 50%由公路運(yùn)輸。垃圾等由道路運(yùn)輸。 規(guī)格 1000mmset臺(tái)30 7384 1/10 Single track switch單開道岔Rail type: 50kg/m,Gauge: 1435mm軌型:50kg/m,規(guī)格: 1435mmGroup組24 / 26No. Name of equipment設(shè)備名稱Te