freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

擴(kuò)建工程項(xiàng)目總承包合同(專業(yè)版)

2025-06-28 13:17上一頁面

下一頁面
  

【正文】 道路用來運(yùn)輸煉鋼車間的轉(zhuǎn)爐爐渣 TRANSPORTATION EQUIPMENT運(yùn)輸工具Railway transportation: 5 sets of diesel lootives, 30x60t wagons with bottom opening。新建氧氣站布置在原有氧氣站區(qū)內(nèi)。12 / 263. ADOPTED STANDARDS AND CODES FOR THE PROJECT總圖運(yùn)輸采用的標(biāo)準(zhǔn)和規(guī)范(1) Design code for general layout and transportation in metallurgical enterprise (YBJ5288)鋼鐵企業(yè)總圖運(yùn)輸?shù)脑O(shè)計(jì)規(guī)范(YBJ5288)(2) Design code for industrial enterprise general plane layout (GB 5018793)工業(yè)企業(yè)總平面設(shè)計(jì)規(guī)范 (GB 5018793)(3) Fire fighting code for architecture design (2022 version) (GBJ1687)建筑設(shè)計(jì)防火規(guī)范(01 年版) (GBJ1687)(4) Design code for standard rail gauge for industrial enterprise’s (GBJ1287)(5) Railway roadbed design code (TB1000199)鐵路路基設(shè)計(jì)規(guī)范 (TB1000199)(6) Road engineering technical standard (JTG B012022) 公路工程技術(shù)標(biāo)準(zhǔn) (JTG B012022)(7) Design code for factory road (GBJ 2287) 廠礦道路設(shè)計(jì)規(guī)范 (GBJ 2287)(8) Design code for concrete road surface (JTG D402022)公路水泥混凝土路面設(shè)計(jì)規(guī)范 (JTG D402022)(9) Design code for high way roadbed (JTJ 01395)公路路基設(shè)計(jì)規(guī)范 (JTJ 01395)(10) Construction technical code for concrete road surface (JTG F302022)公路水泥混凝土路面施工技術(shù)規(guī)范 (JTG F302022)(11) Procedures for railway exploitation techniques shall be in accordance with Vietnam standards 2022. 鐵路開發(fā)技術(shù)程序遵循越南 2022 年標(biāo)準(zhǔn)13 / 264. DESCRIPTION OF GENERAL LAYOUT, TRANSPORTATION, ROADWAY, RAILWAY AND PIPELINE WORKS OF THE WHOLE PLAN (STAGE II)全廠 TISCO 二期擴(kuò)建工程之總圖運(yùn)輸,公路,鐵路,各種管網(wǎng)的概述 GENERAL概述TISCO, being a important enterprise in Vietnam, was established in 1958. TISCO possesses coke making plant, sinter plant, iron making plant, steel making plant, rolling mill plant as well as corresponding utilities and auxiliary facilities etc. Its annual output of iron and steel is about 200,000t and mon carbon steel casting billet is about 250,000t.TISCO 始建于 1958 年,是越南國有重點(diǎn)企業(yè)。其承擔(dān)著燒結(jié)、焦化、高爐所用的精礦粉、煤、塊礦、熔劑、燃料等的受卸、儲存、混勻及將燒結(jié)、焦化、煉鐵所需合格原、燃料直接輸出等綜合作業(yè)及其配套的公輔設(shè)施,無需磨準(zhǔn)器。According to the requirements of bidding document, Fe metal balance for producing 543,200 t/a hot metal is shown as following calculation block diagram:根據(jù)投標(biāo)文件要求,年產(chǎn) 543,200 t 鐵水中金屬鐵的比例如計(jì)算框圖 Purchased mag 采 購 磁 鐵 礦( TFe62%)550,000t/aPurchased iron concentrate(TFe53%)精鐵礦300,000t/aLump ore礦塊(TFe62% )138,700 t/a Sinter 燒結(jié)礦( TFe55%) million ton/a1550m3BF million ton/aSteelmaking150t converter million ton/a casting billet煉剛 150 轉(zhuǎn)爐 5000000ton/a連鑄坯 MAIN TECHNICAL PROCESS FLOW CHART主要工藝流程5 / 26LUU XA main plant will adopt a long process production line, namely coke oven, sintering machine, blast furnace, converter, and continuous casting production line.LUU XA 主廠區(qū)采用長流程煉焦、燒結(jié)、高爐、轉(zhuǎn)爐連鑄生產(chǎn)工藝01 EPC package mainly includes raw material yard project, coke making project (coke oven), sintering project, iron making project, steel making project, and oxygen generating project, whole plant utilities (water, electricity and natural gas) at the second stage and general layout and transportation.EPC 工程包括的主車間:原料場;煉焦(焦?fàn)t)工程;燒結(jié)工程;煉鐵工程;煉鋼工程;制氧工程;二期全廠公輔設(shè)施(水、電、燃?xì)猓?;總圖布置及運(yùn)輸。 CCM project),.TISCO 二期擴(kuò)建工程 EPC 合同 技術(shù)附件Ⅴ(煉鋼連鑄程);6) Technical appendix VI of EPC Contract document for the second stage revamping and expansion project of TISCO, (oxygen generating project).TISCO 二期擴(kuò)建工程 EPC 合同 技術(shù)附件Ⅵ(制氧工程);7) Technical appendix VII of EPC Contract document for the second stage revamping and expansion project of TISCO, (utilities project).TISCO 二期擴(kuò)建工程 EPC 合同 技術(shù)附件Ⅶ(廠區(qū)二期公輔設(shè)施工程);8) Technical appendix VIII of EPC Contract document for the second stage revamping and expansion project of TISCO, (general layout and transportation, roads, railways amp。TISCO will be responsible for the construction of power supply system 110KV step down station and provide power supply source for the second stage revamping and expansion project。Hot blast stove is located at the southwest of blast furnace, gravitation dust catcher, gas cleaning facility, blower station, dedusting system of casthouse, circulating water pump station and suction well, all of them are located at the southwest of blast furnace. Stock house and main control room are located at the northwest of the blast furnace. Dedusting of the stock house, water granulated slag piling yard, pig iron storage house, pig cast machine, repairing shop of hot metal ladle are located at the northeast of the blast furnace. Turbid water pump station, deposition basin, cooling tower, mud milling room, switchgear station, coal powder injection facilities and wagon weigher are located at the southeast of the blast furnace. The details refer to the attached drawings.熱風(fēng)爐布置在高爐的西南側(cè);重力除塵器,煤氣凈化設(shè)施,鼓風(fēng)機(jī)站,出鐵場除塵,循環(huán)水泵站,吸水井均布置在高爐的西南面;礦槽,主控室均布置在高爐的西北側(cè),礦槽除塵,水渣堆場,鐵塊庫,鑄鐵機(jī),鐵水罐修理間均布置在高爐的東北面, 冷卻塔,濁環(huán)水泵站,沉定池,冷卻塔,碾泥機(jī)室,開關(guān)站,煤粉噴吹設(shè)施,稱重設(shè)施布置在高爐的東南,詳情見附圖。17 / 26Total transportation amount for 550m3 blast furnace and steelmaking with converter is 1107,248 tons yearly, among which, 254,348 tons transportin, 852,900 tons transportout. The other materials such as coal, granulated slag, mud for mud gun, river sand, scrap, ferroalloy material, bulk material, refractory material, blast furnace slag, garbage, etc, all of them are transported by road. 550m3 高爐和煉鋼轉(zhuǎn)爐總運(yùn)輸能力為年 1107,248 噸,其中,運(yùn)進(jìn)254,348 噸,運(yùn)出量為 852,900 噸,其他原料如:煤,水渣,炮泥,河沙,鐵合金,散料,耐火材料,爐渣。本次設(shè)計(jì)不新增消防車及車庫,由 TISCO 統(tǒng)一考慮。General layout plan is to be decided during technical design review.技術(shù)設(shè)計(jì)評論決定總平面圖Main pipelines are arranged at the both sides of road, and
點(diǎn)擊復(fù)制文檔內(nèi)容
規(guī)章制度相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1