【正文】
EXFOREPC CONTRACTOFTISCO SECOND STAGE EXPANSION PROJECT VIETNAMTISCO 二期擴建工程項目總承包(EPC )合同技術(shù)附件TECHNICAL ANNEX (VIII)(GENERAL LAYOUT AND TRANSPORTATION, ROADS, 2 / 26RAILWAYS, ALL KINDS OF PIPING NETWORK FOR TISCO’S SECOND STAGE REVANPING AND EXPANSION PROJECT)TISCO 二期擴建工程之總圖運輸,公路,鐵路,各種管網(wǎng)CONTENTS INDEX附件目錄1. GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT( EPC) TISCO 二期擴建工程概述2. WORKING SCOPE OF CONTRACTOR 承包商工作范圍3. ADOPTED STANDARDS AND CODES FOR THE PROJECT 項目規(guī)范和標準4. DESCRIPTION OF GENERAL LAYOUT, TRANSPORTATION, ROADWAY, RAILWAY AND PIPELINE WORKS OF THE WHOLE PLAN (STAGE II)全廠 TISCO 二期擴建工程之總圖運輸,公路,鐵路,各種管網(wǎng)的概述5. EQUIPMENT LIST AND GENERAL LAYOUT ARRANGEMENT3 / 26設(shè)備清單與布置圖6. SOLUTIONS FOR IMPLEMENTATION ARRANGEMENT 進度計劃4 / 261. GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT (EPC) TISCO 二期擴建工程概述2. According to the requirements of sold bidding document 01EPC, dated on March. 10, 2022, for the second stage revamping and expansion project of TISCO, the long process of steel making production line with capacity of 500,000t/a casting billet will be newly built up in the main plant areas of LUU XA. 3. 根據(jù)在 2022 年 3 月 10 日賣出的 01EPC—TISO 二期擴建項目投標文件的要求,在 LUU 的鋼鐵冶煉長流程工程。 PROJECT CONSTRUCTION SHCEDULE項目實施進度表The EPC’s contractor shall plete their work within 30 months.The project construction schedule is arranged based on the actual situations of all the main production lines of second stage revamping and expansion project to meet the requirements of whole project starting production. 承包商應(yīng)在 30 個月內(nèi)完成 EPC 合同中規(guī)定的工作。 The Contractor will employ Vietnam Subcontractor to undertake the works of detailed geological survey and carry out the foundation treatment (Unit price and norm according to Vietnam construction standard). If the total Subcontract price plus the contractor’s management fee do not exceed the amount of 3,265,200 USD which is specified and assigned to such works under Contract, the Contractor will bear the responsibility。 1) Technical appendix I of EPC Contract document for the second stage revamping and expansion project of TISCO, (raw material yard project)。 unloading, storing, evenly blending for concentrated fine ore, coal, lump ore, flux, fuels etc. and directly deliver qualified material, fuel used for sintering, coke making and iron making. All above mentioned ining materials should have qualified particle size and there will be no sizing facilities in the plant.原料車間設(shè)有原料堆場及混勻料場。 COKE MAKING ENGINEERING煉焦工程 One set of 45battery coke oven with the capacity of 300,000 t/a metallurgical coke and byproducts recovery system as well as matched utilities will be newly built.10 / 26新建一臺年生產(chǎn)干焦炭 300,000t/a 的 45-battery 焦爐及其副產(chǎn)品回收系統(tǒng)、配套的公輔系統(tǒng)。 STEEL MAKING amp。Newly built oxygen generating workshop consists of one set of 6500m3/h 11 / 26oxygen generator, matched utilities and auxiliary facilities, piping work in the plant, as well as bottle filling equipment system with capacity of 2022 bottles/day and night (Oxygen bottles excluded).新建制氧車間包括一臺 6500m3/h 的 制氧機和配套工輔設(shè)施,廠區(qū)管網(wǎng)和日裝瓶 2022 的 罐裝設(shè)備系統(tǒng)。The main contents include the general layout, transportation, utilities and auxiliary facilities outside the main shops, such as fuel gas facilities, water supply and drainage facilities, power supply facilities, thermal power facilities, telemunication facilities etc.主要包括內(nèi)容:擴建項目的總圖布置、鐵路運輸、道路運輸及主生產(chǎn)車間外的燃氣設(shè)施、給排水設(shè)施、供電設(shè)施、熱力設(shè)施、電信設(shè)施等公輔系統(tǒng)。In the plant there are railways and station yard of railway, and total railway length in the whole plant is about 60 km (including railway of mines). The railway transportation is the main transport means in the plant, plementary with roads, so the transportation in the plant is very convenience. 廠內(nèi)設(shè)有鐵路及鐵路站場,全廠共有鐵路約 60 公里(包括礦山鐵路),廠內(nèi)運輸主要以鐵路運輸為主,并設(shè)有廠內(nèi)道路,交通運輸極為便利。Newly constructed coke oven and its utilities are located at the northeast 14 / 26of original coke oven, details refer to attached drawings.新建焦爐及輔助設(shè)施布置在原有焦爐的東北面。Newly constructed 550m3 blast furnace is located at the northeast of original blast furnace.新建一座 500m3 高爐布置在原有高爐的東北面。15 / 26The auxiliary facilities for steel making with converter include primary dedusting system, secondary dedusting system, electrical room, water system (including plex water pump station, suction well, cooling tower, chemical deoiling tank, cyclone well, deposition basin, water treatment shop, turbid water pump station, suction well and cooling tower and safety water tower)轉(zhuǎn)爐煉鋼輔助設(shè)施包括:一次除塵,二次除塵,混鐵爐除塵,電氣室,水系統(tǒng)(包括綜合水泵站、吸水井、冷卻塔、化學(xué)除油池、旋流井、沉定池、水處理間、濁環(huán)水泵站、吸水井、冷卻塔和保險水塔)The primary dedusting system and electrical room are arranged at the northwest of the steel making shop, deposition basin, water treatment workshop, turbid water pump, suction well, cooling tower, chemical deoiling tank, cyclone well, all of them are arranged at the northwest of steel making shop, plex water pump station, suction well, cooling tower and safety tower are arranged at the west of steel making shop, 一次除塵,電氣室均布置在轉(zhuǎn)爐煉鋼車間的西北面;分離池,水處理間,濁環(huán)水泵站,吸水井,冷卻塔,化學(xué)除油池,旋流井均布置在轉(zhuǎn)爐煉鋼車間的北側(cè);綜合水泵站,吸水井,冷卻塔,保險水塔均布置在轉(zhuǎn)爐煉鋼車間的西側(cè);Newly constructed utilities: air pressed station is arranged at the place between blast furnace shop and steel making shop, newly constructed oxygen generating station is arranged in the vicinity area of steel making area, boiler house and fresh water boosting pump station are a