【正文】
3, joint planning of rail transport and urban transport in other ways。s research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with followup planning tasks. Network planning Urban planning system in a transitional position, online network planning is pleted, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning??萍?,已成為我們走向高質(zhì)量生活的一座橋梁,一根繩梯??萍?,已成為我們走向高質(zhì)量生活的一座橋梁,一根繩梯。c、專業(yè)水泵安裝人員3人,配套設(shè)備若干。四、主要人員安排a、專業(yè)電工5名,配套設(shè)備若干。c、 照明工程的線路,應(yīng)按電路進行絕緣電阻的測試,并作好記錄。b、 電氣設(shè)備和線路經(jīng)調(diào)試合格后,動力設(shè)備才能進行單體試車。特別注意按設(shè)計要求做好等電位連接。五、接地安裝施工時按照接地分項工程施工工藝標準《電氣裝置安裝工程接地裝置施工及驗收規(guī)范》(GB501692006)和《利用建筑物金屬體做防雷及接地裝置安裝標準圖集》(03D5013)進行施工。單相三孔及三相四孔的接地線均應(yīng)在上方。b、 開關(guān)接線應(yīng)由開關(guān)控制相線,同一場所的開關(guān)切斷位置應(yīng)一致,且操作靈活,接點接觸可靠。開關(guān)插座安裝a、各種開關(guān)、插座的規(guī)格型號必須符合設(shè)計要求,并有產(chǎn)品合格證。c、安裝完畢,測得各條支路的絕緣電阻合格后,方允許通電運行。b、 根據(jù)安裝場所檢查燈具(庭園燈)是否符合要求,檢查燈內(nèi)配線。e、 安裝完畢,應(yīng)對接地干線和各支線的外露部分以及電氣設(shè)備的接地部分進行外觀檢查,檢查電氣設(shè)備是否按接地的要求接有接地線,各接地