【正文】
3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Implementation Stage 項(xiàng)目執(zhí)行階段 Oute Documents ? Environmental Impact Monitoring Report ? Construction site environmental supervision records ? The revised Environmental Management Plan ? Environmental Management Memorandum ? Progress Report ? Feedback reports ? Inspection report of the ADB mission 形成的文件成果 ? 環(huán)境影響監(jiān)測報(bào)告 ? 施工現(xiàn)場環(huán)境監(jiān)理記錄 ? 修訂后的環(huán)境管理計(jì)劃 ? 環(huán)境管理備忘錄 ? 進(jìn)度報(bào)告 ? 反饋報(bào)告 ? 亞行檢查團(tuán)報(bào)告 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Implementation Stage 項(xiàng)目執(zhí)行階段 Work Procedures工作流程 ? ADB review and approve work plan of the implementation agency 亞行審查和批準(zhǔn)執(zhí)行機(jī)構(gòu)的工作計(jì)劃 ? ADB inspect progress report submitted by the implementing agencies 亞行檢查執(zhí)行機(jī)構(gòu)提交的進(jìn)展報(bào)告 ? ADB sends a delegation 亞行派出考察團(tuán) ? ADB loan disbursement 亞行貸款撥付 ? During project construction period construction supervision 項(xiàng)目施工期工程監(jiān)理 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Acceptance Stage 項(xiàng)目驗(yàn)收階段 Work Description 工作內(nèi)容 ? China: The construction project pletion and acceptance of environmental protection, establishment of project environmental management related system 中國:建設(shè)項(xiàng)目的環(huán)境保護(hù)竣工驗(yàn)收、建立項(xiàng)目環(huán)境管理相關(guān)制度 ? ADB: Carry out inspection after the project pletion, the preparation of Project Completion Report, makes a prehensive summary of the loan project 亞行:進(jìn)行完工后的檢查,編制 《 項(xiàng)目完工報(bào)告 》 對(duì)貸款項(xiàng)目進(jìn)行全面總結(jié) 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Acceptance Stage 項(xiàng)目驗(yàn)收階段 Oute Documents 形成的文件成果 ? Environmental protection pletion and acceptance reports 環(huán)境保護(hù)竣工驗(yàn)收?qǐng)?bào)告 ? Environmental management related system documents 環(huán)境管理相關(guān)制度文件 ? Project Completion Report (within 6 months of loan projects pletion) should be submitted to ADB performance evaluation agency for review 《 項(xiàng)目完工報(bào)告 》 (貸款項(xiàng)目完工 6個(gè)月內(nèi))交亞行運(yùn)行評(píng)估局審閱 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Acceptance Stage 項(xiàng)目驗(yàn)收階段 Work Procedure工作流程 ? Environmental protection Acceptance 環(huán)保驗(yàn)收 ? Environmental management related system documents 環(huán)境管理相關(guān)制度文件 ? ADB sends experts to assist the project implementing agencies to plete the project inspection and the preparation of project pletion reports. 亞行派有關(guān)專家協(xié)助項(xiàng)目執(zhí)行機(jī)構(gòu)對(duì)項(xiàng)目進(jìn)行完工檢查,編制項(xiàng)目完工報(bào)告 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 Project Acceptance Stage 項(xiàng)目驗(yàn)收階段 Work Procedure工作流程 ? The termination of ADB accounting agency disbursement, and cancel the project loan account 亞行主計(jì)部門終止撥付款并取消該項(xiàng)目貸款賬戶 ? ADB performance evaluation Bureau sample and evaluate, and their information is reflected in the ADB policy adjustments, the country strategy and program planning and rolling plan. 亞行運(yùn)行評(píng)估局抽樣評(píng)估,其信息反映在亞行的政策調(diào)整、國別戰(zhàn)略與規(guī)劃及滾動(dòng)計(jì)劃中 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 PostEvaluation Stage 后評(píng)估階段 Work Description工作內(nèi)容 ? China: a routine environmental monitoring, pollutant emission application registration 中國:例行環(huán)境監(jiān)測、污染物排污申報(bào)登記 ? ADB: the preparation of Project Performance Assessment Report, within 23 years after the pletion to conduct inspections in accordance with REESI (relevance, effectiveness, efficiency, sustainability and institutional development) 亞行:編制 《 項(xiàng)目績效評(píng)估報(bào)告 》 ,完工后 2- 3年 ——依照 REESI進(jìn)行檢查(相關(guān)性、效果、效率、可持續(xù)性和機(jī)構(gòu)發(fā)展) 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 PostEvaluation Stage 后評(píng)估階段 Oute Documents 形成的文件成果 ? Routine Environmental Monitoring Report 例行環(huán)境監(jiān)測報(bào)告 ? Pollutant emission application registration document 污染物排污申報(bào)登記文件 ? Project Performance Assessment Report (23 years after loan pletion of the project) 《 項(xiàng)目績效評(píng)估報(bào)告 》 (貸款項(xiàng)目完工 2- 3年) 3. Main Environment Work of the Project Cycle項(xiàng)目周期內(nèi)的主要環(huán)保工作 PostEvaluation Stage 后評(píng)估階段 Work Procedures 工作流程 ? China Environmental Monitoring sectors conduct projects monitoring activity 中國環(huán)境保護(hù)監(jiān)測部門對(duì)項(xiàng)目進(jìn)行相關(guān)監(jiān)測工作 ? Pollutant emission application registration document 污染物排污申報(bào)登記文件 ? Design project performance management system to plete the project performance evaluation report 設(shè)計(jì)項(xiàng)目績效管理體系,完成項(xiàng)目績效評(píng)估報(bào)告 4. Main Elements of Environmental Management Plan 環(huán)境管理計(jì)劃的主要內(nèi)容 4. Main Elements of Environmental Management Plan 環(huán)境管理計(jì)劃的主要內(nèi)容 ? The Main Elements of EMP 環(huán)境管理計(jì)劃的主要內(nèi)容 ? EMP Implementation環(huán)境管理計(jì)劃的實(shí)施 ? Related Forms Reference Sample 相關(guān)表格的參考范例 4. Main Elements of Environmental Management Plan 環(huán)境管理計(jì)劃的主要內(nèi) The Main Elements of EMP 環(huán)境管理計(jì)劃的主要內(nèi)容 環(huán)境管理計(jì)劃應(yīng)包括以下主要內(nèi)容: ? 建議的緩解措施 ? 環(huán)境監(jiān)測和報(bào)告要求 ? 緊急的應(yīng)變程序 ? 相關(guān)的機(jī)構(gòu)或組織安排 ? 能力建設(shè)和培訓(xùn)措施 ? 實(shí)施進(jìn)度 ? 成本估計(jì)和業(yè)績指標(biāo) The EMP will include: ? the proposed mitigation measures ? environmental monitoring and reporting requirements ? emergency response procedures ? related institutional or anizational arrangements ? capacity development and training measures ? implementation schedule ? Cost estimates and performance indicators. 4. Main Elements of Environmental Management Plan 環(huán)境管理計(jì)劃的主要 EMP Implementation環(huán)境管理計(jì)劃的實(shí)施 The environmental conditions of loan agreements generally include: 作為貸款協(xié)議中的環(huán)境條款 : ? The key environmental impact mitigation measures and monitoring plan關(guān)鍵的環(huán)境影響削減措施和監(jiān)測內(nèi)容 ? The institutional arrangements and responsibilities to implement Environmental management plans 環(huán)境管理計(jì)劃實(shí)施的機(jī)構(gòu)安排和職責(zé) 4. Main Elements of Environmental Management Plan 環(huán)境管理計(jì)劃的主要 EMP Implementation環(huán)境管理計(jì)劃的實(shí)施 The environmental conditions of loan agreements generally include: 作為貸款協(xié)議中的環(huán)境條款 : ? Evaluation of the effectiveness of environmental management plans and the requirements of reporting for ADB 評(píng)價(jià)環(huán)境管理計(jì)劃有效性以及向亞行做出報(bào)告的要求 ? Public consultation and the specific re