freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

designfmea-資料下載頁

2025-02-27 23:35本頁面
  

【正文】 9 8 0 7 1 5Re vis e spe c toin cl u d e l a b t e stto d e sign l o a d t od e tect failuremo d ea t 2 0 C + 5C Hi Tech Crysta lCo mpan yMr. W o n g9 8 0 7 2 5L a b t e st by SISIRp e rformed9 8 0 7 1 5 p a ssedtestAd d t e st t o spe cRe v. E 9 8 0 7 1 519 20 21 76 Area/Individual Responsible Completion Date The anizational department or activity, the engineer responsible for the remended action, and the target pletion date for the action. 77 ACTION TAKEN After an action has been taken, enter a brief description of the action, and its effective or actual pletion date. 78 FOLLOWUP Having pleted the Design FMEA the engineer confirms that any actions have been addressed. Follow up includes ? Assuring that design requirements are achieved ? Review of engineering and design drawings ? Confirmation of incorporation into manufacturing ? Review the Control Plans and the Process FMEA 79 Revised RPN After actions are taken, estimate and enter the ratings for Severity, Occurrence and Detection. Calculate and enter the resulting RPN. If no actions are taken, these these columns blank. 80 DESIGN FMEA Case Study Exercise 81 Ac ti on Resul ts I tem Desc ripti on Fu ncti onPotenti alFa i l ureModePotenti alEffec t(s) ofFa i l ureSevClassPotenti alCause(s)/Mec hanis m(s)O f F ail ureOccurtCur ren tDesi gnContr olsDetecR.P.N.RemendedAc ti onsRespons i bil i ty Tar getCompleti onDateAc ti onsTa k en SevOccDetR.P.N.P art Nam e:Hite ch S wit chP art Num ber:HT 999 8 88ABP as scu rr e nt toCent rallight ing c ontro lFun ction:Gene ratesign al wh enactuateP iezo ele ctricsw it chcr y stalmat erial G ene rate si gnal when a ctuat eP iezo electri cCr y stalmat erialcrac ke dS witchfai ls t opas scu rr e nt77The s upp ortingsu rfac e f or t hecr y stal is t oosmallThe c rystalmat erial i sbritt le atambie nt tem p44S end t oce rtif ied labperfo rme d bentand t wi st testFor st re ssS witch t e stedat suppli erABCP as sed UL,CSA , S IS IRS tandar d3584140FE A anal y si s t oinc rea sesup po rt area t oev enlydistri bute loadev enly ac ro ssthe cr y stalsu rfac eRevis e sp ec t oinclu de l ab t estto desig n l oadto detect fai lur emodeat 20C + 5 CHiT ec h C rystalCom panyMr. Won g98 07 25HiT ec h C rystalCom panyMr. Won g98 07 25S uppo rt are ainc rea se f ro m S q. mm t o S q. mmRev. E added todra win g98 07 15Lab t est byS IS IRperfo rme d98 07 15pas se d t estA dd t est to spe cRev. E 98071 57722324228EXAMPLE FOR TRAINING PURPOSES 82 Class Exercise Action Results Item Description Function Potential Failure Mode Potential Effect(s) of Failure S e v C l a s s Potential Cause(s)/ Mechanism(s) Of Failure O c c u r t Current Design Controls D e t e c R. P. N. Remended Actions Responsibility Target Completion Date Actions Taken S e v O c c D e t R. P. N. _ System _ Subsystem _ Component ___Model Yr Design Resp. ________ Key Date:____________ FMEA Page _____ of _______ Prepared by: ________ Approved by: ________ FMEA Date: ( Orig)____ Core Team: ___________________________________________________________ Chinese 888 Toy Articulation, Poseability Seat on Table Not able to articulate, Not able to seat Children get annoyed, client plain and get sue for misleading ads 7 8 SC Deformation (Material selection) Dimension Central gravity 4 1 A. Prototype, engineering pilot build 100pcs。 B. Standard lab test, performance test。 C. Correction with design changes D. Verification by 3rd party testing lab 1 1 28 8 1. Material changed to PVC 9095 with less shrinkage factor 2. Central gravity study 3. Thickness at foot xxx body xxx Mr. Ho 1. Design Rev. B changed thickness from xxx to xxx 2. Add profile xxx 3. Add central gravity note to drawing 4. Include the above into the design best practice Completed 99/2/25 7 8 1 1 1 1 7 8 83 A. Prototype, engineering pilot build 100pcs。 B. Standard lab test, performance test。 C. Correction with design changes D. Verification by 3rd party testing lab Action Results Item Description Function Potential Failure Mode Potential Effect(s) of Failure S e v C l a s s Potential Cause(s)/ Mechanism(s) Of Failure O c c u r t Current Design Controls D e t e c R. P. N. Remended Actions Responsibility Target Completion Date Actions Taken S e v O c c D e t R. P. N. _ System _ Subsystem _ Component ___Model Yr Design Resp. ________ Key Date:____________ FMEA Page _____ of _______ Prepared by: ________ Approved by: ________ FMEA Date: ( Orig)____ Core Team: ______________________________________________________________________________________________ POTENTIAL DESIGN FAILURE MODE AND EFFECTS ANALYSIS (DFMEA) Figurine 4 Floatation on water 2. Poor articulate merged in water , breakage Air bubble
點(diǎn)擊復(fù)制文檔內(nèi)容
法律信息相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1