freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

塞拉尼斯everclear項目mei安裝技術(shù)標-資料下載頁

2025-07-30 21:49本頁面
  

【正文】 10t/噸Set套12007/4Site現(xiàn)場Torque Wrench力矩扳手1641Set套As required按需2007/4Site現(xiàn)場Electric Hammer (Hilti)電錘(喜利得)835mmSet套62007/4Site現(xiàn)場Xray DetectorX射線檢測機200Set臺22007/4Site現(xiàn)場Dry Oilfree Air Compressor干燥無油空壓機Set臺12007/4Site現(xiàn)場Theodolite經(jīng)緯儀Set臺22007/4Site現(xiàn)場Level Instrument水準儀Set臺42007/4Site現(xiàn)場36V Safe Transformer36V安全變壓器Set臺22007/4Site現(xiàn)場Smallsized Tools amp。 Equipment for Piping Installation管道安裝小型設(shè)備及工機具Set套As required按需2007/4Site現(xiàn)場Smallsized Tools amp。 Equipment for Equipment Installation設(shè)備安裝小型設(shè)備及工機具Set套As required按需2007/4Site現(xiàn)場電動套絲機Electrical Threading Machine1/2—4″臺/set1As required按需Site現(xiàn)場電動套絲機Electrical Threading Machine1/2—2″臺/set1As required按需Site現(xiàn)場機械壓線鉗Mechanical Wire Crimper16—240mm2臺/set1As required按需Site現(xiàn)場砂輪切割機Abrasive Cutting Machineφ400mm臺/set1As required按需Site現(xiàn)場砂輪切割機Abrasive Cutting Machineφ150mm臺/set1As required按需Site現(xiàn)場砂輪磨光機Abrasive Grinding Machineφ125mm臺/set3As required按需Site現(xiàn)場液壓彎管機Hydraulic Bending MachineG20—G100臺/set2As required按需Site現(xiàn)場液壓彎管機Hydraulic Bending MachineG32—G75臺/set2As required按需Site現(xiàn)場手動彎管機Manual Bending Machine1/2”, 3/4”, 3/8”臺/set3As required按需Site現(xiàn)場力矩扳手Torque WrenchUnder 100N?M把/each1As required按需Site現(xiàn)場臺鉆Bench Drill13mm臺/set1As required按需Site現(xiàn)場電錘Electric Hammer臺/set2As required按需Site現(xiàn)場電鉆Electric Drill6—13mm臺/set5As required按需Site現(xiàn)場絕緣搖表Megger2500V只/each1As required按需Site現(xiàn)場絕緣搖表Megger1000V只/each1As required按需Site現(xiàn)場絕緣搖表Megger500V只/each1As required按需Site現(xiàn)場信號發(fā)生器Signal Generator只/each1As required按需Site現(xiàn)場標準儀表Standard Instrument套/set1As required按需Site現(xiàn)場空壓機Air Compressor臺/set1As required按需Site現(xiàn)場搖表MeggerDM50b套/set1As required按需Site現(xiàn)場接地搖表Grounding MeggerZC29B2只/each1As required按需Site現(xiàn)場控制箱Control BoxJTK2套/set1As required按需Site現(xiàn)場交流試驗變壓器AC Test TransformerYDTC2~4, 50kV臺/set1As required按需Site現(xiàn)場直流高壓發(fā)生器DC HV GeneratorZGSIII-200/2套/set1As required按需Site現(xiàn)場電流表AmperemeterT19/1-A只/each2As required按需Site現(xiàn)場電壓表Voltage MeterT19/1-V只/each1As required按需Site現(xiàn)場電流互感器Current TransducerHL3只/each1As required按需Site現(xiàn)場電流互感器Current TransducerHL1只/each1As required按需Site現(xiàn)場開關(guān)特性測試儀Switch Feature TesterJT2001B套/set1As required按需Site現(xiàn)場雙臂電橋Dualarm Electrical BridgeQJ44套/set1As required按需Site現(xiàn)場單臂電橋Singlearm Electrical BridgeQJ23套/set1As required按需Site現(xiàn)場回路電阻測試儀Circuit Resistance TesterPCIUΩ/3套/set1As required按需Site現(xiàn)場變壓比電橋Transformation Ratio Electrical BridgeQJ35A只/each1As required按需Site現(xiàn)場CT特性測試儀CT Feature Tester1000A、600V套/set1As required按需Site現(xiàn)場試驗油杯Test Oil Cup300ml只/each1As required按需Site現(xiàn)場電容電感表Capacitance Inductance MeterDL-6243只/each1As required按需Site現(xiàn)場指針萬用表Indicator MultimeterMF35只/each1As required按需Site現(xiàn)場數(shù)字式萬用表Digital Multimeter1000V只/each2As required按需Site現(xiàn)場微機保護綜合測試儀Comprehensive Tester for Computer ProtectionHD6940E臺/set1As required按需Site現(xiàn)場單相繼保校驗儀Singlephase Relay Calibrator750臺/set1As required按需Site現(xiàn)場相位表Phase MeterSMG2000臺/set1As required按需Site現(xiàn)場電源盤Power Supply Reel~220V, 15A臺/set1As required按需Site現(xiàn)場對講機WalkieTalkie3km臺/set20As required按需Site現(xiàn)場減壓閥Pressure Reducing Valve只/each2As required按需Site現(xiàn)場 Construction Procedures施工方案 Equipment Installation Procedure設(shè)備安裝方案A) General 概況The Everclear plant equipment workload is as follows: total equipment number 186 sets, including 7 sets of columns, 64 sets of pumps, 47 sets of vessels, 43 sets of heat exchangers and other equipment. The rotating equipment pumps will be installed strictly as per the Owner’s specification API686.本裝置Everclear設(shè)備工作量如下:主要設(shè)備總數(shù)186臺,包括塔類7臺,泵類64臺,容器類47臺,換熱器43臺和其他設(shè)備。其中泵類等轉(zhuǎn)動設(shè)備安裝要按照業(yè)主的規(guī)范API686嚴格執(zhí)行。B) Overall Arrangement for Equipment Construction 設(shè)備施工的整體安排Installation of equipment shall follow the overall construction schedule in due consideration of civil foundation and structural steel construction. In principle, the major equipment shall be set up as the priority of equipment installation to avoid interference with other equipment. Owing to the plexity of the equipment installation, a sound construction procedure can be a guarantee of smooth installation. Therefore, the equipment installation shall ply with the following arrangements:設(shè)備安裝必須遵循整個施工安裝計劃。設(shè)備安裝應(yīng)充分考慮到設(shè)備土建的基礎(chǔ)設(shè)施以及設(shè)備鋼結(jié)構(gòu)的施工。原則上,重型設(shè)備應(yīng)優(yōu)先就位以避免影響其它設(shè)備的安裝。由于設(shè)備安排的密集性,施工工序的計劃性是確保安裝工作的平穩(wěn)的基礎(chǔ)。因此,設(shè)備安裝應(yīng)遵循以下安排:As the equipment delivery schedule is not available, the equipment installation will be performed in the following sequence: starting from inside to outside and from largesized equipment to small one as per the layout drawing.由于沒有設(shè)備到貨時間表,設(shè)備的安裝按如下順序考慮:按照平面布置圖由內(nèi)往外,先大后小。Attention shall be paid to the following points when the equipment is to be delivered to site:設(shè)備在運輸進入現(xiàn)場時,要注意以下幾點:The equipment shall be firmly bound and care shall be exercised to protect the floor during moving.設(shè)備應(yīng)綁扎牢固,運輸時注意保護地面。The equipment paint and accessories such as nozzles shall be protected during lifting and transportation.在吊裝、運輸過程中應(yīng)保護好設(shè)備的油漆和接管等附件。Twopoint lifting method shall be applied to lifting of vertical equipment.立式設(shè)備在吊裝時一定要采用兩點吊裝法。As the detailed information for many equipment is not available currently, the detailed installation procedure will be prepared after receiving the detailed information.由于目前很多設(shè)備還沒有詳細資料,所以詳細安裝方案待得到詳細資料后再作。Ensure no impact on equipment lifting, piping and pipe fittings installation during eq
點擊復(fù)制文檔內(nèi)容
法律信息相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1