freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

pmp測(cè)試題40道中英對(duì)照顧老師-資料下載頁

2025-01-15 16:57本頁面
  

【正文】 ect budget is intended to:a. reduce the probability of scope changes.b. increase the probability of scope changes.c. reduce the probability of a cost overrun.d. increase the probability of a cost overrun.將應(yīng)急儲(chǔ)備金包含在項(xiàng)目預(yù)算內(nèi)的目的在于:1. 減少范圍變更發(fā)生的概率2. 增加范圍變更發(fā)生的概率3. 減少超額成本發(fā)生的概率4. 增加超額成本發(fā)生的概率 the information in the following table, what is the expected value from this risk event? Probability Result .4 10,000 .3 7,500 .2 5,000 .1 +2,500a. –10,000.b. –7,500.c. +2,500.d. –7,000.根據(jù)下面的表格內(nèi)容判斷這一風(fēng)險(xiǎn)事件的期望值 概率 結(jié)果 .4 10000 .3 7500 .2 5000 .1 20001. –100002. –75003. –50004. 2500 contractor is working on a fixed price contract that calls for a single, lump sum payment upon satisfactory pletion of the contract. About halfway through the contract, the contractor’s project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and subcontractors. The contractor asks for a partial payment for work acplished. Which of the following actions by the buyer is most likely to cause problems for the project?a. Starting partial payments for work acplished.b. Making no payments because it would violate the conditions of the contract.c. Paying for work acplished to date.d. Negotiating a change to the payment conditions in the contract.. 但是,項(xiàng)目進(jìn)展至一半,承包商的項(xiàng)目經(jīng)理告知合同管理員由于遇到資金困難無能支付員工工資和分包商的費(fèi)用. ?1. 開始支付完成的那部分工作的費(fèi)用一部分2. 應(yīng)為將可能導(dǎo)致違反合同條款,不于支付3. 支付完成的那部分工作的費(fèi)用4. 對(duì)合同中的付款條款進(jìn)行修改 precise description of a physical item, procedure, or service for implementation of an item or service is called a:a. work package.b. baseline.c. product description.d. work breakdown structure (WBS) element.對(duì)一件物品或服務(wù)的實(shí)施程序,服務(wù)或物品的詳細(xì)描述稱為:1. 工作包2. 基準(zhǔn)線3. 產(chǎn)品描述4. WBS要素 project should be terminated for all of the following reasons except:a. lack of team synergy.b. the project no longer meets the pany’s objectives.c. the resources are not available to plete project activities.d. project funding has been significantly reduced.項(xiàng)目由于以下的原因應(yīng)該終止,除了:1. 缺乏團(tuán)隊(duì)協(xié)力合作2. 項(xiàng)目再也不能滿足公司目標(biāo)3. 完成項(xiàng)目各項(xiàng)工序活動(dòng)的資源已不存在4. 項(xiàng)目資金大幅度減少 mon way to pute estimated at pletion (EAC) is to take the project budgetedatpletion and:a. divide it by the schedule performance index.b. multiply it by the schedule performance index.c. multiply it by the cost performance.d. divide it by the cost performance index.一種用于計(jì)算EAC的常見的方法是將BAC:1. 除SPI 2. 乘SPI 3. 乘CPI 4. 除CPI
點(diǎn)擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1