【正文】
e studied in DOE phase. Winding Process Parameter setting Winding Speed Winding Tension Winding Travel Define Measure Analyze Improve Control Summary of A Phase Biggest Problems and Barriers: Project Status: J Define Measure Analyze Improve Control Central Composite Design Factors: 3 Replicates: 1 Base runs: 20 Total runs: 20 Base blocks: 1 Total blocks: 1 Twolevel factorial: Full factorial Cube points: 8 Center points in cube: 6 Axial points: 6 Center points in axial: 0 Alpha: Purpose: This DOE aims to verify the linear/quadratic effects and interactions between parameter settings to Standby Power by Central Composite Design. Design of Experiments Speed 3 level Low: 6000 RPM High: 7000 RPM Tension 3 level Low: 300 Newton High: 400 Newton Travel 3 level Low: mm High: mm Define Measure Analyze Improve Control Improvement Actions Define Measure Analyze Improve Control Summary of I Phase Define Measure Analyze Improve Control Standardization Define Measure Analyze Improve Control Secondary Metric Define Measure Analyze Improve Control Achievements Define Measure Analyze Improve Control Business Impact Define Measure Analyze Improve Control Measure Analyze Improve Control Project Description Process Map C amp。 E Matrix Preliminary FMEA MSA Capability Study Hypothesis Test DOE (or other improvement) Control Plan Hand Off Training Final Capability Owner SignOff Final Project Report Project Tracking MultiVari Study One Way ANOVA Summary Q amp。 A Session Thank you