【文章內(nèi)容簡介】
的17增值稅10個工作日內(nèi)付合同總金額50。*(2) 40 of the Total Contract Value will be paid by T/T within 10 working days after the construction pleted and accepted by Buyer. *施工完成經(jīng)甲方驗收合格10個工作日內(nèi)支付合同總金額的40%。(3) 10 of the Total Contract Value will be paid by T/T after one year normal operation of the facility and the Warranty Period expired. *剩下的10作為質(zhì)保金設(shè)備正常運(yùn)行1年后付清。(4) In case of the site construction in Iran, Buyer will be responsible for visa, roundtrip fares and traveling expense, food and acmodation, and 30 US Dollar daily subsidies for ea of Seller’s construction personnel on Iran Site. All of the cost will be paid by T/T within 10 working days after the construction pleted and Buyer received related bills provided by Seller and accepted these bills..假設(shè)需乙方前往伊朗工程現(xiàn)場施工甲方負(fù)責(zé)乙方施工人員的簽證、往返車費(fèi)、食宿并補(bǔ)助乙方每人30美金/天。以上費(fèi)用于現(xiàn)場施工完畢后乙方提交相關(guān)票據(jù)甲方收到票據(jù)核實無誤10個工作日內(nèi)結(jié)算。8. Delay and Penalty 違約責(zé)任: (1) If there is any defect or mistake of construction quality, Seller shall repair and replace immediately at its own cost. If Seller fails to solve defect or mistake could not be , Buyer shall have right to return the Goods and claim to Seller for loss there caused.假如乙方施工質(zhì)量出現(xiàn)問題乙方需無償即時修復(fù)或更換如再不能解決甲方可向乙方退貨、索賠。(2) In case Seller’s construction can not acplish as per Buyer’s project sedule, and failed to keep with the sedule, thus to seriously influence the whole sedule, or Seller’s poor quality of construction resulted Buyer’s whole project quality could not satisfy Owner’s quality standard, Seller shall pensate all Buyer’s loss there caused in addition to the normal delay penalty..如因乙方的原因使該工程的施工不能按照甲方的進(jìn)度方案完成并經(jīng)甲方糾偏無效且實際影響了甲方的整個工程進(jìn)度或因該工程的驗收質(zhì)量導(dǎo)致甲方整個工程的質(zhì)量達(dá)不到業(yè)主質(zhì)量除扣除正常的工延罰款外經(jīng)業(yè)主認(rèn)定后乙方應(yīng)賠償由此給甲方造成的損失。9. Contract price and adjustments 合同價款及調(diào)整:(1) Contract price: The contract price is FFP (Firm Fixe